Obra Lisboa Blog

OBRALISBOA.
Blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Published on:
4/10/26
//
Written by:
Obra Lisboa

Fluted Glass Partitions in Renovation: Light, Privacy and Installation Details

A fluted glass partition can bring daylight into an internal room without putting everything on display. Learn where it works, what to measure and which details make it last.

Ler Artigo
How To
Published on:
4/10/26
//
Written by:
Obra Lisboa

Compact powder room renovation: layout, ventilation and storage without blocking circulation

A small powder room can add real value to a home when its door swing, circulation, ventilation and service access are settled before walls are closed.

Ler Artigo
How To
Published on:
3/10/26
//
Written by:
Obra Lisboa

Hot-water heat pumps in a house: reducing noise and vibration before installation

Before fitting a domestic hot-water heat pump, plan its position, base, fixings and pipe routes to avoid noise, vibration, condensate problems and neighbour disputes.

Ler Artigo
How To
Published on:
3/10/26
//
Written by:
Obra Lisboa

House closed for weeks: how to restart water, plumbing and hot water safely

Before using a home that has been closed for weeks, restart water and hot-water systems in a sensible order to spot leaks, flush stagnant water and avoid risky shortcuts.

Ler Artigo
How To
Published on:
3/10/26
//
Written by:
Obra Lisboa

Air-Conditioning Condensate on a Balcony: How to Avoid Drips, Noise and Leaks

A properly planned condensate drain prevents dripping onto neighbours, balcony puddles, noise and difficult repairs. Here is what to decide before installing or replacing air conditioning.

Ler Artigo
How To
Published on:
3/10/26
//
Written by:
Obra Lisboa

Leaving a Home Empty in Winter: A Checklist for Leaks, Damp and Security

Leaving a Lisbon home empty in winter? Learn what to turn off, what to keep running and how to arrange practical checks without encouraging damp or unnecessary risk.

Ler Artigo
How To
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
let's create
together