A project may start with an idea, a problem in the property or a completed design ready to build. Obra Lisboa brings together renovation, construction, architecture and engineering services for different stages and needs.

Explore the four areas, review the scope of each service and tell us what you would like to do. The proposal will identify the work, deliverables and responsibilities relevant to your enquiry.

Find the service you need

Renovation

Renovating a property starts with deciding what will change and what will stay. From one room to several spaces, the scope brings together the agreed work on building services, materials and finishes.

  • Apartment renovation

    Full or partial renovation, bringing together rooms, building services, materials and finishes.

  • House renovation

    Whole-house or partial renovation, with interiors, retained features and external work defined in the proposal.

  • Kitchen renovation

    Kitchen renovation covering layout, services, worktops, storage and finishes.

  • Bathroom renovation

    Bathroom renovation coordinating fittings, services, finishes and the way the room is used.

  • Shop, office and restaurant renovation

    Renovation of commercial premises and workplaces, with layouts, services and finishes defined around the intended activity.

  • Plasterboard partitions and ceilings

    Plasterboard linings, partitions and suspended ceilings, with services, insulation and finishes coordinated within the scope of work.

  • Interior and exterior painting and finishes

    Interior and exterior painting, with surfaces, preparation, colours and working conditions identified in the proposal.

  • Flooring and wall finishes

    Ceramic tiling, wood, laminate and vinyl flooring, and wood floor restoration through sanding and varnishing.

  • Microcement

    Microcement application with surface preparation, finish selection and clearly defined edge details.

  • Joinery and bespoke furniture

    Made-to-measure kitchens, wardrobes, internal doors, skirting and other pieces, with materials, fittings and installation defined in the proposal.

  • Plumbing and electrical installations

    Plumbing renewal, sanitary fixture replacement and alterations to electrical installations.

  • HVAC installation

    Heating, cooling and ventilation installation, including air conditioning and mechanical ventilation, with clearly defined equipment and connections.

Learn more: Renovation services

You may also need

Construction

New construction, rehabilitation and work on individual building elements. The scope follows the site, design documents and existing conditions, identifying the work and supplies required at each stage.

  • Thermal and acoustic insulation

    Interior insulation with defined thermal and acoustic objectives, coordinated with walls, ceilings, services and finishes.

  • Demolition and associated waste removal

    Interior or building demolition with associated waste removal, defined elements, boundaries and site conditions.

  • House construction

    Construction based on the design documents, site conditions and contracted scope of work.

  • Concrete and steel structure construction

    Construction of reinforced concrete and steel structures, foundations and retaining structures from a defined design.

  • Masonry

    Construction of masonry walls and elements, with materials, openings, junctions and intended finishes identified in the proposal.

  • Roofing

    Roof construction, replacement and repair, including the junctions and edge details defined for the work.

  • Façade rehabilitation

    Work to existing façades, coordinating the underlying surface, finishes, junctions and associated work defined in the proposal.

  • Waterproofing

    Assessment of water ingress and work on roofs, terraces, balconies and other building elements.

  • Windows, frames and glazing

    PVC and aluminium frames, windows and glazing, with components, installation and making good clearly defined.

  • Metalwork

    Balustrades, gates, stairs and other metal elements, with installation or repairs defined for the setting and coordinated with the surrounding work.

  • Pools, gardens and external works

    Pool construction and refurbishment, gardens, walls, fencing and external paving, with the works defined for the site and its intended use.

  • Rope access works

    Rope access considered for defined work to façades and other building areas, according to the conditions of the intervention.

  • Extensions and outbuildings

    Construction of extensions and outbuildings, with the additional space, connections to the existing property and associated works defined.

  • Structural strengthening works

    Construction of strengthening works defined by design, coordinated with the building's condition, access and other works.

  • External thermal insulation — ETICS

    ETICS installation with the substrate, system, openings and junctions defined for the façade and coordinated with associated external works.

  • Balcony and terrace refurbishment

    Refurbishment of balconies and terraces as a whole, with paving, junctions, balustrades and associated works defined from the existing condition.

Learn more: Construction

You may also need

Architecture

Developing spaces, exploring options and preparing design documentation. Stages and deliverables are agreed around the brief, from spatial layout to documents for the applicable procedure and construction.

Learn more: Architecture

You may also need

Engineering

Specialist design and technical services for preparing and monitoring construction. Design, supervision and management have specific purposes; the proposal identifies the roles, documents and responsibilities of each service.

Learn more: Engineering

You may also need

How to prepare your enquiry

Tell us where the property is, what you would like to change or resolve and the current project stage. Include an approximate area, any available plans or photographs and your priorities.

If you already have a design, identify the available documents and the work you want to carry out. If you need a spatial proposal, describe the needs the design should address. If you need support during construction, tell us who is carrying out the work and what technical assistance you require.

Enquiries across Greater Lisbon

We welcome enquiries for Lisbon, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability is assessed for each location, type of work and project stage.

View service areas

Frequently asked questions

How do I choose between Renovation, Construction, Architecture and Engineering?

Start with your main need: renovating spaces, carrying out construction or repairs, developing a design or obtaining technical support. A project may involve several areas. The required services are identified with their own scopes when the proposal is prepared.

Can I enquire about one specific job?

Yes. Describe the work you need and the existing elements you wish to retain. The assessment should identify any related work, such as building services, substrates or finishes, so the proposal reflects the intervention required.

Do I need a design before requesting a quotation?

You can begin with the location, photographs and a description of your objective. The detail needed for a quotation depends on the work. Missing drawings, decisions or assessments will be identified before the construction scope is finalised.

Are design, construction and supervision always included?

Each service should be expressly included in the proposal. Design stages, construction work, architectural site support, supervision and management have distinct functions. The proposal should explain what is included and how the participants will coordinate.

Which locations can I enquire about?

We welcome enquiries for Lisbon, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability is assessed against the location, scope and project stage. Please include these details in your first message.

How is a quotation prepared?

A quotation starts with the available information and intended scope. It should identify work or deliverables, materials and supplies where relevant, exclusions and outstanding decisions. Options still under consideration should be distinguished from the agreed solution.

What is the next step for your property?

Share the location, your objective and the information you already have. We can discuss your enquiry and identify the services to consider.

Tell us about your project
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together
contact