Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Obra Lisboa
About Us and Our Service Process

From first contact to handover

Explore the stages that help define your project scope, decisions and progress.

Home
fim
meio

Introduction

Obra Lisboa works in renovation, construction, architecture, engineering and interior design in Greater Lisbon. Services can be commissioned individually or coordinated within the same project.

Who we are

We work on homes and commercial spaces. The proposal starts with the existing property, the intended changes and the available information, to clarify the work and the conditions of the project.

Architecture, engineering, design and construction have distinct roles. The team and each participant's responsibilities should be identified according to the services commissioned.

Following your project from abroad

Our architects and engineers speak English. If you live outside Portugal, we share project updates by email or WhatsApp, according to your preference, with photographs, videos and written summaries. You can give approvals through the same channels.

Architectural, engineering and interior design project documents can be delivered digitally. If you are abroad at handover, your legally authorised representative can attend on your behalf.

Decisions about layout, building services, materials and finishes are coordinated with the property's characteristics and the client's priorities.

Before work starts, inclusions, exclusions, supplies, access and dependencies need to be clear. The quotation and schedule should reflect that scope.

What We Do

Each project is scoped to the property, the client and the work required.

Building construction

Construction and house building, coordinating designs, specialist disciplines and work stages. The site, access and applicable conditions are assessed to define the project.

Renovation and rehabilitation

Renovation of apartments, houses and commercial spaces, from individual rooms to wider interventions. The proposal identifies what will be retained, renewed or replaced.

Interior design

Interior layout, materials, lighting and finishes. The design scope distinguishes drawings and specifications from the supplies and construction work commissioned.

Engineering and architecture

Architectural and engineering design, with stages and deliverables defined for the project. Administrative procedures and additional studies are assessed case by case.

Project management

Work planning and coordination, interfaces between teams and a record of decisions. Scope changes should be assessed for their effect on cost, timing and the sequence of work.

How We Work

The process depends on the commissioned service and the property's condition. These stages organise the initial discussion, preparation and delivery; the specific scope is defined in the proposal.

1. Enquiry and initial assessment

We start with the location, property type and intended changes. Existing plans and photographs help identify questions and assess the need for a visit or survey.

2. Scope and technical preparation

The work, specialist disciplines and necessary design decisions are identified. Where applicable, architecture, engineering and design are coordinated before solutions, materials and deliverables are finalised.

3. Proposal and planning

The proposal should identify inclusions, exclusions, materials and conditions. Timing depends on scope, supplies, access, necessary approvals and conditions found at the property.

4. Work, progress and handover

Work is monitored according to the commissioned scope. Decisions and changes are communicated, including their effects on the schedule. At handover, the included work and the information to be supplied to the client are reviewed.

Bright dining room with a long table and tall windows
01
Enquiry and assessment

Location, property, priorities and available information for the initial assessment.

02
Scope and preparation

Work, specialist disciplines and necessary decisions, with project deliverables defined.

Restaurant floor plan showing tables and service areas
Schedule of quantities and costs for work in a restaurant
03
Proposal and planning

Inclusions, exclusions, conditions and dependencies that affect cost and timing.

04
Work and handover

Progress reviews, communication of changes and review of the commissioned scope at handover.

Two professionals wearing hard hats in a building under renovation

Team and responsibilities

Every service needs clear responsibilities. The proposal and project documents should identify the people involved, their roles and the limits of the commissioned work: client contact, design authorship, specialist disciplines and construction coordination.

Contact and decisions

The contact person and communication channels should be agreed at the start. Requests, decisions and changes need enough context for everyone involved to understand them.

Design and specialist disciplines

Architecture and engineering address different aspects of a project. Authors, specialist disciplines and applicable deliverables are identified in the relevant documents according to the commissioned scope.

Construction coordination

Planning coordinates teams, supplies and access. Unforeseen conditions and changes requested during construction should be assessed before a revised cost or timeframe is agreed.

Handover and documentation

The final review should cover the commissioned work, the information handed over and any outstanding items. Documentation and applicable conditions depend on the service and contract.

‍

Published information and commissioned work

The service descriptions, articles and answers on this website help you prepare an enquiry and understand design and construction decisions. For each project, the proposal and relevant documents identify the work, deliverables and responsibilities. Project pages describe the documented interventions; they do not define the scope of work for another property.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together