Obra Lisboa Blog

Categories
Living at Home During a Renovation: A Practical Plan for Dust, Air, Access and Safety
Staying at home while work is underway? Learn how to phase the project, contain dust, keep air healthier and protect children, pets and access routes.
Parcel Areas in Apartment Buildings: Organising Deliveries, Packaging and Lobby Circulation
A practical guide to creating a parcel area in an apartment building without turning the lobby, stairs or lift access into an everyday obstruction.
Baby Strollers and Bicycles at a Building Entrance: Creating a Useful Area Without Blocking Access
A stroller and bicycle drop-off area can make daily life easier in an apartment building, provided it protects clear access, safety and condominium rules.
Technical installation noise in a renovation: how to reduce it before walls are closed
Poorly planned pipes, pumps, ventilation and service penetrations can turn a renovation into a daily noise problem. Learn what to decide before walls and ceilings are closed.