Obra Lisboa Blog

Categories
Restoring Old Interior Doors: Repairs, Hardware and Comfort Without Losing Character
Before replacing old interior doors, assess the timber, frames, hardware, gaps and comfort needs. A practical guide for Lisbon apartments on deciding what is worth restoring.
Internal Wall Insulation in Lisbon Apartments: When It Works and How to Avoid Condensation
A practical guide to deciding whether internal wall insulation suits a Lisbon apartment, dealing with damp first and planning walls that improve comfort without encouraging mould.
Surge Protection in a Renovation: Preparing the Electrical Panel and Protecting Equipment
Surges can damage sensitive electronics without leaving obvious signs at the panel. Learn what to plan during a renovation to protect circuits, equipment and future loads.
Air-Conditioning Condensate Water: When It Can Be Reused at Home—and Its Limits
Air-conditioner condensate can support a few non-potable household tasks, but only with clean collection, a protected tank and realistic expectations about supply and safety.
Charging an E-Bike at Home: Where to Put the Outlet and How to Protect the Space
A practical guide to planning an e-bike charging point at a house, covering location, outlets, rain protection, heat, cables and a safer everyday routine.
Electrical Panel Planning for a House Renovation: Capacity, Dedicated Circuits and Future Needs
Plan an electrical panel for a house renovation in Portugal: capacity, dedicated circuits, protection, location and practical allowance for future equipment.