Obra Lisboa Blog

Categories
Electrical Panel Planning for a House Renovation: Capacity, Dedicated Circuits and Future Needs
Plan an electrical panel for a house renovation in Portugal: capacity, dedicated circuits, protection, location and practical allowance for future equipment.
Asbestos Before a Home Renovation: What to Do Without Increasing the Risk
Before drilling, demolition or replacing an old roof, establish whether asbestos may be present. Learn when to stop, arrange testing and check the removal plan.
Pool Heat Pumps: What to Plan Before You Buy
Before buying a pool heat pump, check the available space, noise, drainage, electrical supply and filtration layout. Planning these details early prevents costly alterations after installation.
Renovation Contracts in Lisbon: What to Put in Writing Before Work Starts
Before appointing a contractor for a Lisbon renovation, turn scope, materials, timing and changes into a clear written agreement. A practical guide to fewer ambiguities and better decisions on site.
Preparing a Lisbon House Roof for Solar Panels: Structure, Shade, Access and Integration
Before ordering solar panels, check structure, shade, waterproofing, access, electrical capacity and planning rules. A practical guide for Lisbon house roofs.
Material Deliveries in Apartment Buildings: How to Avoid Blockages, Damage and Disputes
A practical guide to planning renovation material deliveries in Lisbon apartment buildings without blocking access, damaging common areas or disrupting neighbours.