Obra Lisboa Blog

Categories
Service Entrance for a House: Keep Boots, Prams and Gear from Dirtying the Home
Plan a practical house service entrance with the right route, flooring, drainage, wash point and storage, so muddy boots, prams and outdoor gear stay out of the main living spaces.
Bioclimatic Pergolas for Lisbon Houses: Orientation, Fixings and Summer Comfort
Plan a bioclimatic pergola around Lisbon sun, wind, drainage, structural support and planning constraints—not just the look of adjustable louvres.
Wildfire Smoke at Home: Preparing a Lisbon Apartment
A practical plan for reducing smoke entering a Lisbon apartment, covering windows, ventilation, cooling, cleaning and renovation decisions worth making before summer.
A Healthier Bedroom Renovation: Materials, Storage and Ventilation to Reduce Dust and Allergens
A practical guide to renovating a bedroom with less dust, damp and material emissions, covering ventilation, paint, flooring, wardrobes and cleaning before the work is closed up.
Wall-Mounted Furniture: How to Prepare the Wall Before Closing It
Before fitting wall-mounted furniture, confirm the wall build-up, reinforcement, fixings and service routes. A clear plan prevents loose units, needless drilling and disruptive repairs later.
A Hot Bedroom in Lisbon: How to Plan a Renovation for Better Summer Sleep
A practical plan for making a Lisbon bedroom cooler in summer, covering solar exposure, external shading, night ventilation, windows and renovation decisions before relying on air conditioning.