Renovation and construction in Algés
For a renovation in Algés, the starting point is how you use each room and its current limitations. An enclosed kitchen, limited storage or ageing building services may require different responses within the same apartment.
What to assess in your property
A useful brief identifies the changes you want and the constraints already known. These points help focus the initial conversation in Algés.
The solution is assessed for the specific property. Scope, responsibilities and execution conditions are defined in the proposal.
- Mark which spaces you want to connect or separate on a plan.
- Check water, drainage and ventilation routes before moving a kitchen.
- Record lift, stair and unloading access to prepare site logistics.
Design and execution, with a defined scope
Obra Lisboa provides renovation, construction, architectural design and engineering. These services can be combined or commissioned for a specific need, with the scope agreed before execution.
General renovation
We renovate apartments, houses and commercial premises within the scope defined in the proposal.
Explore the serviceConstruction
We carry out construction work and house building in line with the design and contracted scope.
Explore the serviceArchitectural design
We develop the design to organise spaces and prepare decisions before building work.
Explore the serviceEngineering
We coordinate structural and building services design to meet the project requirements.
Explore the serviceQuestions before you start
Can I move the kitchen next to the living room?
This can be assessed from the plan and existing services. Drainage routes, ventilation and structural elements must be reviewed before the new position can be confirmed.
What should I send for an initial assessment?
Send the area, property type, approximate size and a description of the planned work. Include photographs, an existing plan and known access constraints where available. You can leave materials and detailed specifications for the next stage.
How are cost and timing defined?
They depend on the agreed scope, property condition, materials, technical requirements and execution conditions. The proposal identifies included work, exclusions and decisions still to be confirmed.
Other service areas
Tell us what you want to change.
Send the location, type of property and priorities. A plan and photographs help us prepare an initial assessment. You do not need to publish the property’s full address.
Open contact pageContact us online with details of your property and the work you have in mind.