
Interior design connects how you use a space with its layout, materials and the elements within it. The starting point is your needs, the property’s characteristics and what you want to retain or change.
The work can focus on one room or coordinate several spaces. The proposal should identify the decisions to develop and documents to deliver, distinguishing interior design from building work and the supply of furniture or equipment.
Request an interior design proposalInterior architecture and design
The brief starts with use: who uses the space, what activities it accommodates and what makes everyday life difficult. Interior planning should consider circulation, relationships between rooms, places to spend time, storage and equipment. Visual preferences gain context when they are connected to these needs.
Developing the design should relate the layout to materials, colours, lighting and furniture. Existing features to retain, available dimensions and users’ needs help define the options to explore. An interior can be updated through a limited set of choices or form part of a wider alteration; the proposal should clarify the intended extent.
Where the brief involves changes to partitions, services or other building components, interior design should be coordinated with the architectural and specialist design work needed. An aesthetic choice does not replace that work. The aim is to organise decisions about the space and identify the documents and interfaces needed to develop the intervention.
Coordinate layout, furniture and materials
Layout and furniture
Identify furniture you wish to retain and functions that still need to be addressed, such as a workspace, storage or a dining area. The proposal can explore the relationship between pieces, routes, openings and equipment, with dimensions to be confirmed for the design. Bespoke furniture should have its design scope and coordination with manufacture and installation identified.
Materials, colour and lighting
Choices should be related to the use of the space and other interior elements. References and samples can support discussion of finishes, textures and combinations. The proposal should identify what will be selected or specified and which decisions remain open.
The lighting concept should be coordinated with equipment positions and the planned technical work. Selecting a light fitting or representing a lighting effect should not be treated as automatically developing the entire electrical installation. Design and construction needs should be identified for the scope concerned.
Develop options and record the choices
Preparation should bring together the needs, property information and client references. From there, the proposal should define the questions to explore and how options will be presented: spatial arrangements, materials, furniture or other included elements.
Choices need to be recorded so it is clear what has been agreed, what has changed and what still needs confirmation. Plans, drawings, references and descriptions should correspond to the commissioned deliverables and their intended use. An option still being explored should not be presented to a supplier as a final decision.
The scope should clarify the planned revisions and coordination with decisions by the client or other parties. Later changes should be related to affected documents and supplies, so the overall design remains coherent.
Interior design and 3D visualisation
Interior design develops choices about the space. 3D modelling and visualisation can represent those choices and support discussion, with their own purpose and deliverables. The proposal should clarify whether that representation is included, what will be shown and which information it will use.
An image may illustrate an idea still being explored. It should not, on its own, be taken as confirmation of dimensions, available materials, technical details or commissioned work. Decisions needed for construction should be identified in the corresponding documents.
Where the enquiry is about obtaining models or images of an established design, that scope should be distinguished from developing the interior design itself. Coordination between the two services should keep clear which version of the design is being represented.
Coordinate design with construction and supplies
The proposal should distinguish interior design and its documents from renovation, manufacture, installation and supply. These scopes can be brought together in one proposal, provided it is clear what will be developed, delivered and carried out. Selecting an item should not be assumed to include purchasing or installing it.
Where suppliers or contractors are already appointed, explain who they are and what information they need. Furniture drawings, finishes and equipment positions should be related to dimensions and constraints that need confirmation before manufacture or building work.
If support during construction is wanted, the proposal should identify the questions, points of involvement and deliverables covered. Design support should not be confused with full construction management or construction supervision on the client’s behalf.
What to send for an interior design proposal
Describe the spaces and what you want to improve about how they are used. Send available plans and photographs, and add:
- Who uses the space and the activities to consider.
- Furniture, materials and other features you wish to retain.
- Storage, work, dining or other functional needs.
- Visual references, explaining the choices you like in each.
- Work already planned and decisions made with other designers or suppliers.
- Priorities, an indicative budget and your preferred timing.
Also explain the support you want: exploring the layout, choosing materials, detailing elements or supporting decisions during construction. If you do not yet know which documents are needed, explain the purpose of the enquiry so that deliverables can be defined.
Related services
Areas we serve
We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.
View the areas we serveFrequently asked questions
Can I request interior design for just one room?
You can make an enquiry focused on one room, identifying your needs and the features you want to retain. The proposal should clarify the scope and any relationships with adjoining spaces, services or other work that need to be considered.
Can furniture I already own be incorporated?
Identify the pieces to retain, their dimensions and known condition. These choices can form part of the starting point for the design. The proposal should relate them to the layout, materials and use requirements without assuming everything will be replaced.
Does the service include 3D images?
Modelling and visualisation should be identified in the proposal where included. The purpose, content and intended deliverables need to be clarified. Design development and image production are related scopes, but should not automatically be treated as equivalent.
Are building work and furniture included in the design proposal?
Work and supplies need to be described. One proposal can bring together design, construction and supply, with each scope identified. Selecting or representing a material, furniture item or piece of equipment does not, on its own, confirm that purchasing and installing it are included.
What documents will I receive for the next stages?
Documents should be defined according to the objective and commissioned detail, and may include plans, drawings and references or specifications for the elements covered. The proposal should clarify each deliverable’s purpose and what still needs development before pricing, manufacture or construction.
How are changes handled after a design has been chosen?
Revisions and changes should be considered within the agreed scope. Affected decisions, documents and supplies need to be identified, and effects on the work and scheduling clarified. The versions in use should reflect confirmed choices.
How would you like your space to work better?
Describe your needs, send available photographs and plans, and identify what you wish to retain. Add references and explain what you would like to develop in the interiors.
Send an interior design enquiry



