Absorção acústica — Sound absorption
Reduction of sound energy reflected by surfaces within a space.
Illustrative example: Considering an absorptive ceiling in a room with echo.
On site: It treats sound within a room; it does not mean insulating noise between rooms.
Related service: Thermal and Acoustic InsulationBack to the indexAcabamento — Finish
The final layer or treatment that determines how a surface looks and is used.
Illustrative example: Choosing washable paint for a kitchen wall.
On site: Specifying the finish helps you compare materials and plan maintenance.
Related service: Painting and FinishesBack to the indexAcessibilidade — Accessibility
Conditions enabling people with different abilities to use spaces and routes.
Illustrative example: Reviewing doorway clearance and manoeuvring space.
On site: It should be integrated into the design from the earliest decisions.
Related service: Architectural Design ProcessBack to the indexAço de armadura — Reinforcing steel
Steel bars or mesh embedded in concrete, mainly to resist tensile forces.
Illustrative example: Identifying the reinforcement specified for a concrete beam.
On site: Steel positioning, connections and protection follow the structural design.
Related service: Concrete and Steel StructuresBack to the indexAditivo — Admixture
A product added to a mix in small quantities to change properties such as workability or setting time.
Illustrative example: Selecting a mortar with a working time suited to the task.
On site: Dosage and compatibility are checked against the product documentation.
Related service: MasonryBack to the indexAfagamento — Wood floor sanding
Controlled sanding of a timber surface to prepare it for refinishing.
Illustrative example: Assessing a timber floor before renewing its varnish.
On site: The usable thickness and timber condition limit the work.
Related service: CarpentryBack to the indexAgregado — Aggregate
Granular material, such as sand or gravel, used in construction mixes.
Illustrative example: Specifying the constituents of a concrete mix.
On site: Size and properties influence the behaviour of the mix.
Related service: Concrete and Steel StructuresBack to the indexAlçado — Elevation drawing
A drawing showing a vertical face of a building, including its openings, materials and proportions.
Illustrative example: Showing the windows on the front of a house.
On site: It helps coordinate openings, alignments and exterior materials.
Related service: Architectural Design ProcessBack to the indexAlinhamento — Alignment
A geometric relationship between elements following a common reference.
Illustrative example: Aligning the tops of doors along a corridor.
On site: Defining reference lines avoids visual differences that are difficult to correct later.
Related service: Architectural Design ProcessBack to the indexAlvenaria — Masonry
Construction using units such as bricks or blocks, arranged and joined to form walls or other elements.
Illustrative example: Building a block partition between two rooms.
On site: The wall’s role needs to be identified before deciding on the work.
Related service: MasonryBack to the indexAndaime — Scaffolding
A temporary structure providing access and working platforms at height during construction.
Illustrative example: Planning access to a façade to repair its finish.
On site: Assembly, use and inspection require planning by competent people.
Related service: Facade RehabilitationBack to the indexAQS — Domestic hot water
Hot water prepared for domestic uses such as bathing and washing.
Illustrative example: Assessing hot-water needs for two bathrooms.
On site: System selection considers demand, space and maintenance.
Related service: Plumbing and ElectricalBack to the indexArgamassa — Mortar
A mixture of binder, fine aggregates and water used for work such as laying masonry or rendering.
Illustrative example: Using a suitable mortar when laying bricks.
On site: The product must suit the work and the base.
Related service: MasonryBack to the indexArgamassa de colagem — Tile adhesive mortar
A mix used to bond finishes to a substrate; selection depends on the finish, substrate and exposure.
Illustrative example: Selecting tile adhesive for a shower area.
On site: The substrate, tile size and exposure influence selection.
Related service: Wall and Floor FinishesBack to the indexArgamassa de juntas — Grout
Material used to fill joints between finish units.
Illustrative example: Selecting the fill between kitchen tiles.
On site: Selection considers joint width, cleaning and exposure.
Related service: Wall and Floor FinishesBack to the indexAzulejo — Glazed ceramic tile
A ceramic tile, usually glazed, used to cover surfaces.
Illustrative example: Preserving an existing tiled panel during renovation.
On site: Condition, the value of the assembly and compatibility affect repair choices.
Related service: Wall and Floor FinishesBack to the indexBarreira de vapor — Vapour barrier
A layer with high resistance to water-vapour passage; its position depends on the construction build-up.
Illustrative example: Assessing the layers of an insulated roof.
On site: Its position should follow assessment of the assembly's moisture and thermal behaviour.
Related service: Thermal and Acoustic InsulationBack to the indexBetão — Concrete
A material made from cement, water and aggregates that gains strength after mixing and placement.
Illustrative example: Constructing a concrete slab specified in the design.
On site: Its composition and installation depend on the element’s role and the design.
Related service: Concrete and Steel StructuresBack to the indexBetão armado — Reinforced concrete
A system in which concrete and reinforcement act together to resist design actions.
Illustrative example: Specifying a concrete slab with reinforcement defined in the design.
On site: Performance depends on the design and execution of the assembly.
Related service: Concrete and Steel StructuresBack to the indexBetonilha — Screed
A mortar layer that levels a floor or prepares the base for a floor finish.
Illustrative example: Levelling the base before installing the selected flooring.
On site: Allow for its thickness and readiness for the next stage.
Related service: Wall and Floor FinishesBack to the indexBetume — Filler
A term used for filling or smoothing materials; the product depends on the application.
Illustrative example: Smoothing minor imperfections before painting.
On site: Identify the substrate and intended use, rather than relying only on the product name.
Related service: Painting and FinishesBack to the indexBomba de calor — Heat pump
Equipment that transfers heat between environments and can provide heating, cooling or hot water.
Illustrative example: Considering a domestic water-heating solution.
On site: Capacity, noise, ventilation and available space need coordination.
Related service: HVAC DesignBack to the indexCaderno de encargos — Specification
A document setting out technical requirements for the planned work, materials and execution.
Illustrative example: Describing the specified finishes for each room.
On site: It reduces ambiguity between pricing, materials and execution.
Related service: Construction Management and CoordinationBack to the indexCaixa de estore — Shutter box
An enclosure housing a rolled shutter and its mechanism.
Illustrative example: Reviewing the box during window replacement.
On site: Airtightness, insulation and access to the mechanism should be considered.
Related service: Window and Door FramesBack to the indexCaixilharia — Window and door frames
The profiles and components forming the frame and opening parts of windows or doors.
Illustrative example: Replacing a window within its existing opening.
On site: Consider the complete assembly: frame, glazing, hardware and installation.
Related service: Window and Door FramesBack to the indexCaleira — Gutter
A channel collecting roof rainwater and directing it to downpipes.
Illustrative example: Reviewing rainwater collection when renewing a roof.
On site: Capacity, slope and maintenance influence drainage.
Related service: RoofingBack to the indexCalha técnica — Service trunking
An enclosure that organises and protects cables or small service runs and provides maintenance access.
Illustrative example: Organising cables on an office wall.
On site: Routes should account for protection, capacity and future access.
Related service: Plumbing and ElectricalBack to the indexCantaria — Dressed stonework
Worked stone elements used around openings, at junctions or elsewhere in a building.
Illustrative example: Assessing a stone surround on an old façade.
On site: Cleaning and repair should respect the stone type and condition.
Related service: Facade RehabilitationBack to the indexCapilaridade — Capillary action
Water movement through fine pores in a material, which can contribute to damp near ground level.
Illustrative example: Investigating persistent damp at the base of a wall.
On site: Diagnosis distinguishes ground moisture, water ingress and condensation.
Related service: WaterproofingBack to the indexCarga permanente — Permanent load
The weight of elements that remain in a building, such as its structure, walls and finishes.
Illustrative example: Accounting for the weight of a new screed.
On site: Adding weight may require checking the existing structure.
Related service: EngineeringBack to the indexCerâmica — Ceramic material
Material formed and fired from mineral raw materials, used in building products.
Illustrative example: Comparing ceramic finishes for a floor.
On site: Intended use, surface properties and the installation system guide selection.
Related service: Wall and Floor FinishesBack to the indexCobertura — Roof
The upper assembly protecting a building from external exposure.
Illustrative example: Assessing tiles, insulation and junctions during renovation.
On site: The solution includes structure, water control, thermal performance and maintenance.
Related service: RoofingBack to the indexCofragem — Formwork
Temporary or permanent moulds that shape concrete during placement and initial hardening.
Illustrative example: Defining formwork for a concrete staircase.
On site: Geometry, stability and removal sequence form part of planning.
Related service: Concrete and Steel StructuresBack to the indexColetor — Manifold or collector pipe
A component that collects or distributes flows through several pipes; its role depends on the system.
Illustrative example: Planning an accessible water-distribution point.
On site: Access helps identify circuits and carry out maintenance.
Related service: Plumbing and ElectricalBack to the indexCondensação — Condensation
Water vapour turning into liquid water, which can occur when air meets a cold surface.
Illustrative example: Seeing droplets on the inside of a window on a cold morning.
On site: The source of moisture needs to be identified before choosing a solution.
Related service: HVAC DesignBack to the indexCorte — Section drawing
A drawing of a building as if cut by a plane, showing heights, levels and construction layers.
Illustrative example: Showing a suspended-ceiling height on a drawing.
On site: It shows relationships between floors, ceilings and services that plans may not reveal.
Related service: Architectural Design ProcessBack to the indexCota — Dimension or level
A numerical indication of a dimension or level on a drawing.
Illustrative example: Indicating the finished floor level.
On site: Existing, proposed and finished dimensions must be distinguished.
Related service: Architectural Design ProcessBack to the indexCura do betão — Concrete curing
Managing moisture and temperature in young concrete to support hardening and limit premature drying.
Illustrative example: Planning protection for a freshly cast slab.
On site: The procedure depends on the concrete, environment and specification.
Related service: Concrete and Steel StructuresBack to the indexDemolição seletiva — Selective demolition
Planned removal of parts of a building, separating materials and protecting elements that are retained.
Illustrative example: Removing a finish while retaining the existing wall.
On site: It helps protect retained elements and separate removed materials.
Related service: Demolition and Waste RemovalBack to the indexDesvão — Roof void
The space between a roof and the ceiling or floor below.
Illustrative example: Assessing access to the roof void for inspection.
On site: Use, ventilation and access need coordination.
Related service: RoofingBack to the indexDilatação térmica — Thermal expansion
A material's dimensional change caused by a temperature change.
Illustrative example: Allowing for movement in a sun-exposed floor.
On site: Joints and edge details should accommodate expected movement.
Related service: Wall and Floor FinishesBack to the indexDrenagem — Drainage
Systems that collect and convey water to prevent accumulation in unwanted areas.
Illustrative example: Assessing how water drains from a terrace.
On site: Falls, outlets and drainage routes must work together.
Related service: WaterproofingBack to the indexEflorescência — Efflorescence
A surface salt deposit, often associated with water moving through a material.
Illustrative example: Investigating whitish deposits on a wall.
On site: Cleaning without understanding the water source may not solve the problem.
Related service: Facade RehabilitationBack to the indexEmpreitada — Construction contract works
Construction work agreed between a client and contractor, with a defined scope, price and conditions.
Illustrative example: Defining the work included in a kitchen renovation.
On site: Scope, exclusions and changes should be clear to both parties.
Related service: Construction Management and CoordinationBack to the indexEscoramento — Temporary propping
Temporary support for building elements while work affects their stability or before they can support themselves.
Illustrative example: Planning temporary support during structural work.
On site: The arrangement and sequence are defined by competent professionals.
Related service: EngineeringBack to the indexEstaleiro — Construction site facilities
The organised area supporting construction, including access, storage, equipment and welfare facilities.
Illustrative example: Reserving areas for materials and movement on site.
On site: Organisation reduces conflicts between deliveries, storage and work.
Related service: Construction Management and CoordinationBack to the indexEstanquidade — Tightness
The ability to limit unwanted water or air passage through an element or joint.
Illustrative example: Reviewing the junction between window and wall.
On site: Specify whether the concern is water, air or both.
Related service: Window and Door FramesBack to the indexEstrutura — Structural system
The system of elements that receives building loads and transfers them to the ground.
Illustrative example: Identifying load-bearing elements before changing a room.
On site: Structural function should not be inferred from a wall's appearance alone.
Related service: EngineeringBack to the indexETICS — External thermal insulation composite system
An external thermal insulation system whose insulation, protective and finishing layers work together.
Illustrative example: Specifying a complete system in a facade refurbishment design.
On site: Connections and components need to be specified as parts of the same system.
Related service: Thermal and Acoustic InsulationBack to the indexFachada — Façade
An external face of a building, including walls, openings, finishes and other visible elements.
Illustrative example: Assessing finishes and junctions before façade refurbishment.
On site: Work considers the whole assembly, including openings and drainage.
Related service: Facade RehabilitationBack to the indexFerragem — Hardware
A metal component used to fix, move, close or adjust doors, windows and furniture.
Illustrative example: Choosing hinges suited to a door.
On site: Weight, use and adjustability influence selection.
Related service: CarpentryBack to the indexFissura — Crack
An opening in a material whose cause and significance depend on its location, development and the affected element.
Illustrative example: Recording the location and development of a crack in a wall.
On site: The cause should be assessed before choosing a cosmetic repair.
Related service: EngineeringBack to the indexForra — Lining
A layer or element used to line a surface or conceal services.
Illustrative example: Creating a lining to accommodate a service run.
On site: Required inspection and maintenance access should be retained.
Related service: Drywall and Suspended CeilingsBack to the indexFuga de água — Water leak
Unintended escape of water from a pipe, fixture or connection.
Illustrative example: Investigating a damp connection beneath a basin.
On site: Locating the source avoids repairing only the visible symptom.
Related service: Plumbing and ElectricalBack to the indexFundação — Foundation
The part of a structure that transfers the building loads to the supporting ground.
Illustrative example: Assessing how a new building is supported by the ground.
On site: The solution depends on loads and ground conditions.
Related service: EngineeringBack to the indexGesso cartonado — Plasterboard
A board with a gypsum core and paper facing, used in wall and ceiling systems.
Illustrative example: Creating a partition with boards fixed to a supporting frame.
On site: Performance depends on the complete system and a board type suitable for the location.
Related service: Drywall and Suspended CeilingsBack to the indexGuarda — Guardrail
A protective barrier beside a drop, staircase or balcony.
Illustrative example: Assessing replacement of a staircase guardrail.
On site: Geometry, strength and fixings require technical specification.
Related service: MetalworkBack to the indexImpermeabilização — Waterproofing
A set of measures designed to stop water passing through a surface or junction.
Illustrative example: Treating the junction between a terrace floor and a wall.
On site: Junctions, edge details and drainage are part of the solution to assess.
Related service: WaterproofingBack to the indexInfiltração — Water ingress
Unwanted water entry through building elements or junctions.
Illustrative example: Assessing a stain that appears after rainfall.
On site: The source may be far from where the stain appears.
Related service: WaterproofingBack to the indexIsolamento acústico — Sound insulation
Reducing sound transmission between spaces through building elements.
Illustrative example: Assessing the wall between a bedroom and a noisy living room.
On site: Limiting sound transmission differs from reducing echo within a room.
Related service: Thermal and Acoustic InsulationBack to the indexIsolamento térmico — Thermal insulation
A layer or solution that limits heat transfer through parts of a building.
Illustrative example: Assessing roof insulation during a refurbishment.
On site: The continuity of the solution and its junctions with other elements matter.
Related service: Thermal and Acoustic InsulationBack to the indexJunta — Joint
A separation or connection between elements. It may accommodate movement or support the construction sequence.
Illustrative example: Detailing the joint where two different finishes meet.
On site: Joints do not all have the same purpose or filling material.
Related service: Wall and Floor FinishesBack to the indexLã mineral — Mineral wool
A mineral-fibre material used in thermal and acoustic insulation systems.
Illustrative example: Specifying insulation inside a partition.
On site: Performance depends on the product and continuity of the system.
Related service: Thermal and Acoustic InsulationBack to the indexLadrilho — Tile
A modular unit used to finish floors or walls.
Illustrative example: Planning the tile layout on a floor.
On site: Format, cuts and joints should be planned before installation.
Related service: Wall and Floor FinishesBack to the indexLaje — Slab
A mainly flat structural element used, for example, in floors and roofs.
Illustrative example: Assessing a floor before proposing a new opening.
On site: Changes to openings or loads require structural assessment.
Related service: Concrete and Steel StructuresBack to the indexLevantamento — Measured survey
A record of the dimensions, layout and observable conditions of a space or building before work begins.
Illustrative example: Measuring a kitchen before designing new cabinets.
On site: Existing dimensions and conditions inform design and quantities.
Related service: Architectural Design ProcessBack to the indexMapa de quantidades — Bill of quantities
An organised list of work items and quantities used to prepare and compare quotations.
Illustrative example: Quantifying walls to be painted in each room.
On site: It helps compare quotations on the same scope.
Related service: Construction Management and CoordinationBack to the indexMástique — Sealant
A sealing material applied to joints, selected for movement and exposure.
Illustrative example: Detailing a seal between different materials.
On site: Compatibility, preparation and joint geometry affect the result.
Related service: WaterproofingBack to the indexMedição de obra — Measurement of works
Quantifying planned or completed work using defined rules.
Illustrative example: Checking the area of installed finish.
On site: The rules should allow design, quotation and execution to be compared.
Related service: Construction Management and CoordinationBack to the indexMembrana de impermeabilização — Waterproofing membrane
A continuous layer, formed on site or applied in sheets, within a system that prevents water penetration.
Illustrative example: Detailing a membrane around a terrace drain.
On site: Continuity and special details matter as much as the main surface.
Related service: WaterproofingBack to the indexMicrocimento — Microcement
A thin, continuous finish applied in layers to a prepared substrate and protected with a finishing system.
Illustrative example: Considering a continuous finish for a bathroom.
On site: Substrate preparation and final protection are essential to the system.
Related service: MicrocementBack to the indexNivelamento — Levelling
Checking or correcting surface heights against a reference.
Illustrative example: Assessing a substrate before installing flooring.
On site: Being level is not the same as having the required drainage fall.
Related service: Wall and Floor FinishesBack to the indexPavimento flutuante — Floating floor
Flooring whose boards form a layer laid over a base without being fully bonded to the substrate.
Illustrative example: Planning click-fit flooring in a living room.
On site: The base, joints and moisture conditions must suit the product.
Related service: Wall and Floor FinishesBack to the indexPé-direito — Floor-to-ceiling height
The vertical distance between a room's floor and ceiling.
Illustrative example: Checking available height before adding a suspended ceiling.
On site: Finishes and services can reduce the usable height.
Related service: Architectural Design ProcessBack to the indexPeitoril — Window sill
The element at the base of a window that finishes the opening and can help direct water outward.
Illustrative example: Reviewing the lower junction when replacing a window.
On site: The detail should coordinate the frame, façade and water drainage.
Related service: Window and Door FramesBack to the indexPendente — Fall or slope
The inclination of a surface or pipe, often used to guide drainage.
Illustrative example: Defining the drainage direction of a terrace.
On site: It should be coordinated with levels, outlets and access.
Related service: WaterproofingBack to the indexPilar — Column
A generally vertical structural element that transfers loads to other elements or foundations.
Illustrative example: Locating columns during an apartment survey.
On site: Their position affects layout options and alterations.
Related service: EngineeringBack to the indexPlanta — Floor plan
A drawing of a space in horizontal section, showing rooms, dimensions and circulation.
Illustrative example: Comparing two kitchen layouts.
On site: It helps assess circulation, furniture and relationships between spaces.
Related service: Architectural Design ProcessBack to the indexPonte térmica — Thermal bridge
An area where heat passes through the building envelope differently because of its geometry or materials.
Illustrative example: Analysing the junction of a slab and an external wall.
On site: It highlights discontinuities that looking only at the wall may miss.
Related service: Thermal and Acoustic InsulationBack to the indexPré-instalação — First-fix provision
Preparation of routes and connections for equipment to be installed later.
Illustrative example: Planning service routes before closing walls.
On site: Future equipment requirements should be identified.
Related service: Plumbing and ElectricalBack to the indexPrimário — Primer
A product applied before paint, adhesive or a finish to prepare the substrate and improve adhesion.
Illustrative example: Preparing a repaired wall before painting.
On site: The product must suit the substrate and the following finish.
Related service: Painting and FinishesBack to the indexProjeto de execução — Detailed design
Drawings and specifications developing the solutions needed to guide construction work.
Illustrative example: Detailing a cabinet's junction with a wall and lighting.
On site: Coordinating drawings and specifications avoids improvised site decisions.
Related service: Architectural Design ProcessBack to the indexQuadro elétrico — Electrical distribution board
An assembly containing devices that protect and distribute the electrical circuits of an installation.
Illustrative example: Assessing circuits during a kitchen renovation.
On site: Changes and checks are carried out by qualified professionals.
Related service: Plumbing and ElectricalBack to the indexRalo — Drain outlet
A fitting collecting surface water and conveying it to a drainage system.
Illustrative example: Coordinating a drain with a shower floor.
On site: Levels, waterproofing and cleaning should be considered together.
Related service: Plumbing and ElectricalBack to the indexReabilitação — Building rehabilitation
Work restoring or improving the usability and performance of an existing building.
Illustrative example: Renewing deteriorated elements while retaining parts of the building.
On site: Assessment of the existing building informs scope and priorities.
Related service: House RenovationBack to the indexReboco — Render or plaster
A mortar layer applied to a wall or ceiling to even out or protect its surface.
Illustrative example: Evening out a wall before its final finish.
On site: Compatibility with the base affects product selection.
Related service: Painting and FinishesBack to the indexRemate — Junction detail
A detail terminating a layer or connecting different materials or elements.
Illustrative example: Detailing the junction between façade and roof.
On site: Small discontinuities can undermine the performance of the assembly.
Related service: Facade RehabilitationBack to the indexRevestimento — Surface covering
A material or set of layers applied to an element to protect, finish or adapt it for use.
Illustrative example: Installing ceramic tiles on a bathroom wall.
On site: Selection includes base preparation, joints and future maintenance.
Related service: Wall and Floor FinishesBack to the indexRodapé — Skirting board
A trim at the junction of wall and floor that protects the base of the wall and completes the room finish.
Illustrative example: Choosing a trim compatible with doors and flooring.
On site: Height, thickness and junctions should be coordinated.
Related service: CarpentryBack to the indexSanca — Ceiling cove
An element at the wall-ceiling junction, decorative or used to integrate lighting.
Illustrative example: Planning indirect lighting in a living room.
On site: Dimensions, lighting effect and equipment access need coordination.
Related service: Drywall and Suspended CeilingsBack to the indexSifão — Trap
A fitting retaining a water seal to limit drainage gases entering a room.
Illustrative example: Reviewing a basin's connection to drainage.
On site: Access helps with cleaning and leak checks.
Related service: Plumbing and ElectricalBack to the indexSoalho — Timber flooring
Flooring made from timber pieces, with various fixing and finishing systems.
Illustrative example: Assessing refurbishment of an existing timber floor.
On site: Moisture, substrate and usable thickness affect the work.
Related service: CarpentryBack to the indexSoleira — Threshold
The lower element of a doorway, finishing the transition between spaces or between inside and outside.
Illustrative example: Reviewing the transition between a living room and balcony.
On site: Levels, accessibility and water protection need coordination.
Related service: Window and Door FramesBack to the indexSuporte — Substrate
The base onto which a material or building system is applied.
Illustrative example: Assessing a wall’s condition before applying a finish.
On site: The base condition affects preparation and the adhesion of subsequent layers.
Related service: Wall and Floor FinishesBack to the indexTeto falso — Suspended ceiling
A ceiling installed below the building element above it, leaving a space in between.
Illustrative example: Integrating lighting into a ceiling below the existing slab.
On site: Available height, services and maintenance access need to be coordinated.
Related service: Drywall and Suspended CeilingsBack to the indexTubo de queda — Downpipe
A mainly vertical pipe conveying rainwater or wastewater, depending on the system.
Illustrative example: Identifying the rainwater route from a roof.
On site: Systems must be distinguished and maintenance access considered.
Related service: Plumbing and ElectricalBack to the indexVão — Opening or span
An opening in a wall or a distance between supports, depending on the design context.
Illustrative example: Measuring a window opening before ordering.
On site: Final dimensions should account for the frame, allowances and junctions.
Related service: Architectural Design ProcessBack to the indexVentilação mecânica controlada — Controlled mechanical ventilation
Air renewal using mechanical equipment for extraction and, depending on the system, supply.
Illustrative example: Assessing air renewal in a home during renovation.
On site: Sizing, noise and maintenance need to be considered in the design.
Related service: HVAC DesignBack to the indexVidro duplo — Double glazing
Two panes separated by a sealed cavity, with properties that contribute to the window's performance.
Illustrative example: Comparing glazing options for an existing window.
On site: Performance also depends on the frame, seals and installation.
Related service: Window and Door FramesBack to the indexViga — Beam
A structural element that receives loads along its span and transfers them to its supports.
Illustrative example: Identifying the beam above an opening to be altered.
On site: Work depends on assessing loads and supports.
Related service: EngineeringBack to the index