
A more practical kitchen, a renewed bathroom or a different room layout: renovating an apartment means considering the whole property, even when the work starts in one space.
Obra Lisboa undertakes full and partial apartment renovations in Greater Lisbon. The scope follows your priorities, the condition of the property and the elements you wish to retain, bringing together building services, materials and finishes.
Request a renovation quotationWhen renovation can help
Renovation can help you prepare a property to live in, update outdated rooms or adapt your home to new needs. Start by identifying what works well and what limits everyday use.
A partial renovation may focus on the kitchen, bathroom or finishes. A broader project may involve several rooms and renewal of building services. In either case, the connections between new work and existing elements need to be identified.
Work that may be included in the proposal
The scope is defined for the apartment and may include:
- Protecting elements to be retained, dismantling and removing the associated waste.
- Interior alterations covered by the applicable design documents.
- Renewal of plumbing and electrical installations in the agreed areas.
- Kitchens and bathrooms, coordinating fittings, building services and finishes.
- Specified flooring, painting, ceilings, doors and carpentry.
- A final review of the contracted work and a record of outstanding items.
The proposal should distinguish materials and equipment supplied under the contract from items you intend to purchase directly. Design and technical support services are identified with their own scopes.
What affects the work
The floor level, access routes, lift, unloading areas and use of shared spaces influence how the work is organised. It is also necessary to know whether the apartment will remain occupied and which rooms may be unavailable during the works.
Existing walls, services and previous alterations may require assessment before the solution is finalised. The applicable administrative requirements are checked for the specific intervention and property. Building management requirements and protection of shared areas should be addressed during preparation.
How the renovation is organised
- Set priorities. Identify the rooms involved, elements to retain and changes you want to make.
- Assess the property. Review available information and identify any visits, measurements or design support required.
- Agree the scope. Record work, materials, supplies, exclusions and outstanding choices.
- Prepare and build. Organise access and the sequence of work, coordinating the trades involved.
- Review the work. Compare the result with the contracted scope and record outstanding matters.
A change requested during construction should be described and assessed before proceeding, including its effect on the work, cost and programme.
Information to include in your quotation request
Send the location, approximate floor area, floor level and a description of the rooms to renovate. Include any available plans or photographs and tell us:
- What you would like to retain and replace.
- Any changes to the layout or equipment you are considering.
- The known condition of building services and any existing problems.
- Materials or references you have already selected.
- Whether the home will remain occupied and your preferred date for using it.
- Which design documents are available and which decisions remain open.
This helps prepare a proposal with identifiable work items and distinguish outstanding choices from supplies already specified.
Related services
Apartment renovation projects
Enquiries across Greater Lisbon
We welcome enquiries for Lisbon, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability is assessed for each location, type of work and project stage.
View service areasFrequently asked questions
What affects the cost of an apartment renovation?
The area, rooms involved, condition of building services, materials and access all influence the quotation. A useful proposal identifies work and supplies, including exclusions. Outstanding choices should be recorded so they can be assessed.
How long does an apartment renovation take?
Duration depends on the scope, sequence of trades, supplies and property conditions. Share your preferred completion date at the start. A programme can be prepared once there is enough information about the work, decisions and dependencies.
Can I renovate only the kitchen or bathroom?
Yes. An enquiry can cover one or several rooms. It is necessary to check whether the intervention involves work elsewhere, such as building services, flooring or connection points, and identify that work clearly in the proposal.
Can I live in the apartment during the work?
This is assessed for the specific project. Access to water, electricity, a kitchen, bathroom facilities and circulation routes needs to be considered at each stage. A full renovation may require the property to be vacated; phased work depends on existing conditions.
Can I remove a wall or change the room layout?
Describe the proposed change before any demolition begins. The existing element, services involved and implications for the building need to be understood. The solution and necessary design documents should be defined with appropriate technical support.
How can I follow the renovation if I am outside Lisbon?
Agree the points of contact, how records will be shared and how decisions will be approved at the start. Photographs, documents and progress updates may form part of the agreed arrangements. Choices affecting the work should be clearly recorded.
Tell us what you want to change in your apartment
Send the location, rooms involved and any available plans or photographs. Let us know which elements you want to retain.
Request a renovation quotation






































