Obra Lisboa Blog

Categories
Lisbon short-term lets in 2026: what to check before renovating an apartment
Before funding a Lisbon apartment renovation for short-term lets, check registration, local rules, condominium restrictions, authorised use and the technical choices that keep the work adaptable.
Indoor Handrails for a House: How to Measure, Fix and Light Stairs Safely
A practical guide to choosing, measuring and installing an indoor handrail in a house, with attention to wall structure, brackets, lighting and the limits of DIY work.
Digital site logs for a Lisbon renovation: recording decisions, delays and extra work
A practical method for using a digital site log to record decisions, photographs, changes and programme risks during a Lisbon renovation.
Loose Façade Render: How to Spot the Risk, Make It Safe and Plan Repairs in Lisbon
Cracks, hollow patches and falling render on a façade need diagnosis before repainting. Learn when to cordon off the area, call a professional and plan a lasting repair in Lisbon.
Exempt Renovation Works in Lisbon: What to Prepare in the Five Days Before You Start
An exempt renovation still needs preparation. Learn what to check in Lisbon before day one: start notice, condominium coordination, access, protection and street occupation.
A porch for a Lisbon house: how to set orientation, depth and solar protection before building
A well-designed porch can cut unwanted sun, retain useful winter light and protect openings and outdoor areas from rain.
ETICS on Lisbon apartment buildings: EPS, mineral wool and façade details that matter
Before insulating a façade with ETICS, compare EPS and mineral wool, check system compatibility and address the details that prevent cracks, water ingress and thermal bridges.
Buying a Tenanted Apartment in Lisbon: What to Check Before Making an Offer
An existing tenancy changes the timetable, renovation scope and risk of a purchase. Learn which documents and questions matter before you make an offer.
Pombaline Cage Structures: How to Recognise Them Before Renovating a Lisbon Apartment
A Pombaline cage may be hidden inside the walls of an older Lisbon building. Learn how it works, why some partitions are structural, and what to check before cutting or removing walls.
Wall-Mounted Indoor Drying Rack: How to Install One Without Damp or a Blocked Walkway
A folding wall drying rack can free up an apartment, provided you check the wall, moisture, load and circulation before drilling.
Changes During a Renovation: How to Approve Extra Work Without Losing Control of Time and Cost
A practical method for recording, pricing and approving renovation changes before they become delays, disputes or costs that are hard to verify.
Salt deposits and peeling paint on old walls: how to tell salts, condensation and leaks apart
White powder and peeling paint need a diagnosis before repair. Learn how to distinguish salt deposits, condensation and water ingress in older Lisbon homes.