Olivais Bathroom Renovation

OBRALISBOA.
Olivais Bathroom Renovation
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes

Client

José Maria Rodrigues

Total Area

95 m²

Project Duration

8 Months
Processo

Problem

The bathrooms in the Olivais apartment had ageing plumbing, outdated wall and floor finishes and a layout that limited practical use. Wet-area performance and user safety were central concerns.

Process

  • Renew the plumbing serving the bathrooms.
  • Improve waterproofing and drainage detailing.
  • Create a clearer, more functional layout.
  • Use durable, easy-to-maintain finishes.

Solution

  • Removed old sanitary fittings and finishes.
  • Renewed plumbing and prepared the wet-area substrates.
  • Applied waterproofing and safer flooring.
  • Installed new fittings, storage and coordinated finishes.
GAllery
·
GAllery
·
GAllery
·
GAllery
·

Before

·
And
·
after
·
GAllery
·
GAllery
Olivais Bathroom Renovation
Olivais Bathroom Renovationright arrow icon
left arrow icon
right arrow icon
Introduction

The project began by stripping the bathrooms back to a sound base and checking the concealed plumbing. The new arrangement was then built around easier use, reliable wet-area detailing and straightforward maintenance.

Conclusion

The renovated bathrooms are brighter, safer and more functional. Renewed plumbing, waterproof finishes and a better organised layout support long-term daily use.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
let's create
together