Amadora Apartment Renovation

OBRALISBOA.
Amadora Apartment Renovation
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Processo

Problem

The 85 m² apartment had a dated kitchen, ageing electrical and plumbing systems, weak lighting and worn finishes. The bedrooms also needed improved thermal and acoustic comfort.

Process

  • Renew the kitchen and bathroom.
  • Upgrade electrical and plumbing infrastructure.
  • Improve lighting, insulation and everyday comfort.
  • Create a consistent contemporary interior.

Solution

  • Removed obsolete fittings and prepared the apartment for new services.
  • Renewed electrical and plumbing installations.
  • Improved insulation where required and updated the lighting plan.
  • Installed the new kitchen, bathroom and coordinated finishes.
GAllery
·
GAllery
·
GAllery
·
GAllery
·

Before

·
And
·
after
·
GAllery
·
GAllery
Amadora Apartment Renovation
Amadora Apartment Renovationright arrow icon
left arrow icon
right arrow icon
Introduction

The renovation started by identifying the technical and functional problems affecting each room. Building-service upgrades were coordinated with the new kitchen, bathroom, insulation and interior finishes.

Conclusion

The completed apartment is more comfortable, efficient and cohesive. Renewed services, improved lighting and contemporary finishes give the home a reliable basis for everyday use.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
let's create
together