Rua do Barão Apartment Renovation


Problem
The 85 m² apartment showed ageing finishes, signs of possible water ingress and an inefficient use of space. The attic and building services also needed to be integrated into a coherent renovation.
Process
- Resolve moisture-related defects and worn materials.
- Improve circulation and room organisation.
- Upgrade electrical and plumbing infrastructure.
- Bring the attic and bespoke finishes into the overall design.
Solution
- Removed degraded finishes and inspected the exposed construction.
- Applied the required repairs, insulation and waterproofing measures.
- Reorganised the layout and renewed building services.
- Completed the attic and interior with coordinated bespoke elements.


The intervention started with a technical assessment of the apartment and the causes of visible deterioration. The work then combined repairs, layout changes and service upgrades before the new interior finishes were installed.
































The result is a modernised apartment with clearer circulation, renewed infrastructure and better use of the available area. The upgraded attic and tailored finishes add useful space and visual continuity.








































.avif)
