Rua do Funchal Balcony Renovation

OBRALISBOA.
Rua do Funchal Balcony Renovation
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes

Client

Pedro Santos

Total Area

15 m²

Project Duration

1 Month
Processo

Problem

The 15 m² balcony had cracked flooring, peeling paint and signs of water ingress in the walls. The damaged build-up needed to be removed and the underlying condition checked before new finishes could be applied.

Process

  • Stop water ingress and protect adjoining construction.
  • Repair damaged surfaces.
  • Improve slip resistance and user safety.
  • Use exterior finishes suited to weather exposure.

Solution

  • Removed loose coatings and damaged flooring.
  • Repaired cracks and prepared a stable substrate.
  • Installed a new waterproofing system with careful edge detailing.
  • Applied durable exterior flooring and protective wall finishes.
GAllery
·
GAllery
·
GAllery
·
GAllery
·

Before

·
And
·
after
·
GAllery
·
GAllery
Rua do Funchal Balcony Renovation
Rua do Funchal Balcony Renovationright arrow icon
left arrow icon
right arrow icon
Introduction

The intervention began with an assessment of the balcony structure and the likely routes of water entry. Once damaged materials were removed, repairs and waterproofing could be completed on a properly prepared base.

Conclusion

The balcony is now protected by a renewed waterproofing build-up and durable exterior finishes. Safer flooring and repaired walls make the 15 m² area usable again.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
let's create
together