Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
After: open-plan living and dining area with timber table, pendant light, timber joinery and sage-green kitchen
Process

Problem

The renovation focused on the kitchen, living room, bathroom and main bedroom of an apartment in Santos — Guarda Mor. The work addressed an impractical layout and the need to renew the electrical and plumbing installations and interior finishes.

The 120 m² area and 12-month duration shown on this page relate to this intervention. They are not an estimate for another property: scope, existing condition and execution constraints need to be assessed for each proposal.

Process

  • Survey and preparation: a survey established the scope, followed by removal of finishes, cabinetry and selected partitions.
  • Services: the electrical and plumbing installations were renewed.
  • Layout: the connection between the kitchen and living room and the bathroom layout were reorganised.
  • Finishes and fittings: the work included new surfaces, kitchen installation and sanitary fittings.

Solution

The renovation brought the kitchen and living room together, reorganised the bathroom and renewed the finishes in the rooms included in the work. Built-in storage, light surfaces and timber elements form part of the finished interiors documented in the photographs.

·
·
·
·

Before & After

·
·
After renovation in Santos - Guarda Mor: open-plan living room and kitchen with a timber table and sage-green cabinets
Before renovation in Santos - Guarda Mor: red steel props supporting exposed timber ceiling beamsright arrow icon
left arrow icon
right arrow icon
Introduction

During the works

The photographs show the interior during construction, with finishes removed and building elements exposed. They document the preparation of the space before the finishing work.

Objective and context

The intervention aimed to improve the connection between the kitchen and living room and reorganise the bathroom, coordinating layout, building services and finishes.

Conclusion

The renovated interiors

The completed work combines a connected kitchen and living area with renewed bathroom and bedroom spaces. The photographs document the interior finishes, built-in storage and lighting.

The documented result can help discuss layout and finish decisions for a similar project. The scope for another property depends on its conditions and the intended changes.

To plan a similar intervention, explore apartment renovation and share your property location and priorities.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together