Praça das Flores Shop Renovation

OBRALISBOA.
Praça das Flores Shop Renovation
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Praça das Flores Shop Renovation
Process

Problem

The shop was deteriorated, with water ingress, damaged surfaces and outdated building services. The renovation also needed to protect the original stone arches while creating a practical commercial interior.

Process

  • Make the premises safe and ready for commercial use.
  • Resolve moisture and damaged finishes.
  • Renew essential electrical and plumbing infrastructure.
  • Retain and highlight the original stone arches.

Solution

  • Removed obsolete finishes and installations.
  • Repaired walls and ceilings and treated sources of water ingress.
  • Renewed the required building services.
  • Introduced durable finishes around the retained architectural features.
GAllery
·
GAllery
·
GAllery
·
GAllery
·

·
GAllery
·
GAllery
Praça das Flores Shop Renovation
Praça das Flores Shop Renovationright arrow icon
left arrow icon
right arrow icon
Introduction

The project began with a detailed survey of the existing shop and its technical constraints. Selective demolition exposed the original structure and allowed the team to define the necessary repairs before new work started.

Conclusion

The completed renovation turned a worn interior into a clean, functional commercial space. The repaired envelope and renewed services improve reliability, while the retained stone arches give the shop a distinctive identity.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together