Obra Lisboa Blog

OBRALISBOA.
Blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Published on:
5/11/26
//
Written by:
Obra Lisboa

Solar thermal hot water for a Lisbon house: roof, cylinder and backup decisions

Before fitting solar thermal hot water, check shade, roof condition, cylinder location, backup heat and access for maintenance.

Ler Artigo
Facts & Insights
Published on:
5/11/26
//
Written by:
Obra Lisboa

A Floor Drain in a Home Laundry Area

Find out when a floor drain is worth adding to a home laundry area and which details prevent odours, backflow and leaks.

Ler Artigo
News
Published on:
5/11/26
//
Written by:
Obra Lisboa

A Nursery Renovation: Night Lighting, Outlets and Safe Storage

Plan a nursery that works through the early years, with calm lighting, well-placed outlets, accessible storage and clear circulation.

Ler Artigo
How To
Published on:
5/11/26
//
Written by:
Obra Lisboa

Buying a Former Shop Converted into a Lisbon Home: What to Check Before You Offer

Before buying a former shop adapted as a home, check its authorised use, unit documents, alterations and condominium constraints.

Ler Artigo
News
Published on:
3/11/26
//
Written by:
Obra Lisboa

A North-Facing Bedroom in Lisbon: Comfort Without Mould

A north-facing bedroom can feel cold and damp. Learn what to diagnose and which upgrades to prioritise without blocking ventilation.

Ler Artigo
How To
Published on:
3/11/26
//
Written by:
Obra Lisboa

Suspended Ceilings in Renovation: Services Without Losing Height

Learn when a suspended ceiling improves services, lighting and comfort—and when it takes too much height or creates maintenance problems.

Ler Artigo
News
Published on:
3/11/26
//
Written by:
Obra Lisboa

Lighting a living room that does everything

Plan ambient, task and accent light so a small living room works for rest, meals and work without a ceiling full of downlights.

Ler Artigo
ObraLisboa
Published on:
3/11/26
//
Written by:
Obra Lisboa

Buying a Home with an Installed Heat Pump: What to Check Before You Offer

An installed heat pump can be useful, but only after checking its records, noise, drainage, condition and likely adaptation costs.

Ler Artigo
ObraLisboa
Published on:
3/11/26
//
Written by:
Obra Lisboa

Affordable renting in Lisbon: how to size a renovation before setting the rent

Portugal’s simplified affordable-rent scheme means rent, tenancy terms and renovation scope must be planned together before work begins.

Ler Artigo
News
Published on:
3/11/26
//
Written by:
Obra Lisboa

An Entry Cupboard for Wet Umbrellas and Coats

Plan an entrance cupboard that handles wet umbrellas and coats without stale smells, mould, puddles or damaged finishes.

Ler Artigo
How To
Published on:
2/11/26
//
Written by:
Obra Lisboa

A Three-Week Plan for a Lisbon Renovation

Use a rolling three-week plan to connect trades, deliveries and approvals without stopping a renovation over predictable gaps.

Ler Artigo
Facts & Insights
Published on:
2/11/26
//
Written by:
Obra Lisboa

Flood Sensors Under the Sink and by the Washing Machine

Learn where to place home flood sensors, how to respond to an alert, and why they do not replace shut-off valves, maintenance or repairs.

Ler Artigo
ObraLisboa
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together