Obra Lisboa Blog

OBRALISBOA.
Blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Published on:
31/10/26
//
Written by:
Obra Lisboa

Balcony Drains in Lisbon: How to Prevent Puddles and Leaks by the Door

Learn how to check a balcony drain, slope and door threshold before standing water turns into a leak.

Ler Artigo
ObraLisboa
Published on:
31/10/26
//
Written by:
Obra Lisboa

Portable Air Conditioning in a Lisbon Apartment

Find out when a portable air conditioner helps in a Lisbon apartment and how to set it up without wasting energy.

Ler Artigo
How To
Published on:
31/10/26
//
Written by:
Obra Lisboa

Lisbon, Cascais and Oeiras sale prices: how to use INE data before buying and renovating in 2026

Use current INE sale-price data to assess a Lisbon-area purchase, plan renovation costs and avoid treating averages as a guarantee.

Ler Artigo
ObraLisboa
Published on:
31/10/26
//
Written by:
Obra Lisboa

Lisbon courtyards: light, air and water

Understand what Lisbon’s rear courtyards do for a building before paving, covering or building into them.

Ler Artigo
News
Published on:
31/10/26
//
Written by:
Obra Lisboa

Painting Kitchen Tiles: Preparation, Limits and Mistakes to Avoid

Learn when painting kitchen tiles is worthwhile, how to prepare the surface and which warning signs need repair before paint.

Ler Artigo
News
Published on:
30/10/26
//
Written by:
Obra Lisboa

Condominium water and power during renovation

Before connecting a renovation to shared utilities, agree access, consumption, protection and reinstatement in writing.

Ler Artigo
Facts & Insights
Published on:
30/10/26
//
Written by:
Obra Lisboa

Old stone stairs: repair wear without erasing their character

How to repair stone stairs in old buildings, dealing with wear and slip risk without using incompatible materials.

Ler Artigo
How To
Published on:
30/10/26
//
Written by:
Obra Lisboa

A desk by the window in a small living room

How to place a desk by a window without screen glare, backlighting or an awkward living-room route.

Ler Artigo
Facts & Insights
Published on:
30/10/26
//
Written by:
Obra Lisboa

Buying with an energy certificate: what to read beyond the rating

Use an energy certificate to compare renovation risk, comfort and likely work before offering on a Lisbon apartment.

Ler Artigo
News
Published on:
30/10/26
//
Written by:
Obra Lisboa

Rehabilitation slowdown: how to launch a Lisbon renovation

A fall in rehabilitation licences in 2026 does not guarantee available crews. Plan scope, timing and procurement properly in Lisbon.

Ler Artigo
How To
Published on:
30/10/26
//
Written by:
Obra Lisboa

Narrow storage bench for an entrance

Plan a useful entrance bench without narrowing the route, causing trips or fixing weight to an unsuitable wall.

Ler Artigo
News
Published on:
29/10/26
//
Written by:
Obra Lisboa

Renovation hold points

Set clear checks before walls are closed, finishes are applied or payments are released, reducing rework during renovation.

Ler Artigo
News
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together