Obra Lisboa Blog

Categories
Saturday Apartment Works in Lisbon: When a Special Noise Licence Is Needed
Demolition, drilling and cutting in a Lisbon apartment on Saturday may require a special noise licence. Learn how to plan the request and coordinate the building.
Charging Area for an Electric Mobility Wheelchair: How to Plan It in a House
An electric mobility wheelchair needs a dry, accessible and properly planned charging area. Learn what to decide before preparing one in a house.
Cold floors above a garage or basement: how to insulate them during renovation
A cold floor above a garage, basement or storage room needs more than a new finish. Compare insulation from above and below, check moisture and structure, and plan levels before renovation starts.
A Fold-Down Desk in the Living Room: Planning a Workspace That Disappears at the End of the Day
A fold-down desk can create a proper workspace in the living room without leaving cables, papers and furniture in the way. Plan its position, lighting and services before the work starts.
Contractors in 2026: what to check before setting a renovation start date
Construction-sector authorisation applications rose sharply in 2026. Learn what to check with a contractor, how to prepare an appointment and how to avoid a renovation being held up by missing documents, materials or late decisions.
Preparing Your Home Entrance for Ageing in Place
A safer entrance reduces trip risks, makes arriving home easier and allows the home to adapt before mobility becomes an urgent concern.
Entrance Door Seals: How to Reduce Draughts Without Compromising Home Ventilation
A practical guide to finding draughts around an entrance door, choosing suitable seals and fitting them without blocking the home’s necessary ventilation.
Displaced roof tiles: how to assess the risk and plan a repair
A tile out of line may be a small local fault or the first warning of a roof failure. Learn what to check safely from the ground, when to restrict access and when to call a professional.
Installing a Lift in an Older Lisbon Building: Condominium Decisions, Design and Permissions
A lift in an older Lisbon building requires a sound condominium resolution, a study of space and structure, planning checks and a work plan that protects residents and public space.
New Windows in Lisbon: How to Balance Summer Heat, Winter Comfort and Ventilation
Before replacing windows in Lisbon, compare orientation, shading, glass, frames and ventilation. An airtight window without planned fresh-air provision can solve draughts while creating a different problem.
Floating Flooring Over Existing Tiles: When It Works and How to Prepare the Base
Floating flooring can go over existing tiles and avoid demolition, provided the old floor is sound, dry and level enough. Here is what to check before ordering materials.
Bedroom Headboard Wall: Plan Lighting, Outlets and Storage Before Closing the Wall
A well-planned headboard wall prevents trailing extension leads, awkward lamps and cramped bedside furniture. Learn what to decide before closing the wall during a renovation.