Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Interior under construction in Amoreiras, with light-coloured walls, visible ceiling joints and building materials on the floor.

Client

Private client

Total Area

Project Duration

Process

Problem

The challenge was to reorganise a fragmented outdoor area with exposed masonry, changes in level and poorly defined access routes. The work needed to connect the existing buildings, courtyard and stairs while retaining their relationship with the surrounding site.

Process

  • Courtyard preparation — organising the work areas and clearing the spaces involved.
  • New masonry — building walls and defining the boundaries of the space.
  • Connecting levels — constructing an external staircase to establish a clear route.
  • Surface preparation and finishing — rendering internal and external surfaces in preparation for the final stage.

Solution

  • Clearer outdoor circulation — the new staircase connects the different levels of the site.
  • Connected spaces — new walls define the boundaries and the relationship between the courtyard, interior and exterior.
  • Consistent surfaces — rendering and paint bring the new elements and existing structure together visually.
GAllery
·
GAllery
·
GAllery
·
GAllery
·

Before & After

·
GAllery
·
GAllery
After: renovated grey-rendered facade with rectangular openings and a gravel courtyard
Before: construction courtyard with a block wall, stacked bricks and stairs beside a stone wallright arrow icon
left arrow icon
right arrow icon
Introduction

Starting point

The work began on a narrow, irregular site, constrained by neighbouring buildings, changes in ground level and exposed masonry walls.

The aim was to clarify access routes, build new boundaries and give the fragmented outdoor area a more coherent layout.

Conclusion

After the intervention

The new layout creates a clear outdoor route between the different levels and connects the renovated spaces. White walls, a concrete staircase and the existing stonework define the arrangement.

The courtyard and indoor rooms now have even surfaces and defined access routes, with a base prepared for use and final finishes.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together