Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
After: living room with integrated kitchen, mezzanine and black spiral staircase over timber flooring
Process

Problem

The home was undergoing extensive renovation, with exposed roof and structural elements, temporary props, stripped rooms and bathrooms in need of refurbishment. The challenge was to reorganise the available space while making use of its height and different levels.

Process

  • Preparation — organise the existing spaces and services for the renovation.
  • Layout — define the mezzanine and its relationship with the living area.
  • Kitchen and bathrooms — create an integrated kitchen and renew the bathroom spaces.
  • Finishes — combine timber flooring, metal elements, tiling and light surfaces.

Solution

The mezzanine makes use of the height above the living area, with a spiral staircase connecting the levels. Timber flooring, white surfaces, black metalwork and geometric tiling give the renovated rooms a consistent character.

GAllery
·
GAllery
·
GAllery
·
GAllery
·

Before & After

·
GAllery
·
GAllery
After: living room with integrated kitchen, mezzanine and black spiral staircase over timber flooring
Before: construction space with metal props, open ceiling and partially demolished wallsright arrow icon
left arrow icon
right arrow icon
Introduction

Before the renovation

The initial photographs show exposed roof and structural elements, temporary props and rooms stripped for the works.

The renovation reorganises the home around a mezzanine and a more connected living area.

Objective and context

The intervention aimed to reorganise the rooms and use the available height, connecting the mezzanine with the living area. The documented stages include preparation, spatial reorganisation and renewal of kitchen, bathrooms and finishes.

Conclusion

Renovated spaces

The living area and white kitchen sit beneath the mezzanine, connected by a black spiral staircase. Timber flooring continues through the renovated rooms.

The refurbished bathrooms combine light surfaces with geometric tiling and new fittings.

The integrated kitchen, spiral staircase and mezzanine show how circulation and volume connect in this property. A solution for another space needs its own assessment.

To plan a similar intervention, explore apartment renovation and share your property location and priorities.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together