Carnaxide


Problem
The kitchen, living room and bedrooms had dated finishes and little visual continuity. The renovation aimed to make the apartment brighter and more coherent while retaining features such as the stone fireplace.
Process
- Removal and preparation — removing finishes and elements that made the rooms feel disjointed.
- Kitchen renovation — introducing light-coloured cabinetry and new work surfaces.
- Connecting the rooms — laying timber flooring in the living areas and bedrooms.
- Final finishes — using light paint colours and retaining the stone fireplace as a focal point.
Solution
- A lighter palette — white surfaces, timber and natural light replace the heavier appearance of the previous finishes.
- Material continuity — timber flooring connects the living room, bedrooms and circulation areas.
- Retained character — the stone fireplace remains a focal point in the renovated living room.
Before & After


Starting point
The kitchen, living room and bedrooms had dated finishes and a fragmented appearance.
The renovation aimed to bring more light and continuity to the apartment while retaining features such as the stone fireplace.
Objective and context
The intervention aimed to update the kitchen, living room and bedrooms and create continuity between rooms. The stone fireplace was retained as a focal point of the living room.








After the renovation
The renovation brings lighter finishes and greater visual continuity to the rooms.
Timber flooring, white surfaces and natural light update the apartment while preserving the existing fireplace.
Continuous timber flooring and light surfaces are visible in the final photographs. The case helps discuss what to retain and what to renew, without assuming the same solution for every apartment.
To plan a similar intervention, explore apartment renovation and share your property location and priorities.


















.avif)

