Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
After: Golden Goose shopfront with brass-toned framing, lit display windows and central entrance

Client

Total Area

Project Duration

Services

No items found.
Process

Problem

The finishing work had to bring together dark, silver and reflective surfaces across the floor, walls, ceiling, displays and shopfront. Consistent texture and detailing were needed to carry the store concept through these different elements.

Process

  • Surface preparation — prepare the bases for the decorative finishes.
  • Metallic finishes — apply textured finishes in silver and black tones.
  • Coordination — align the finishes with displays, mirrors and linear lighting.
  • Shopfront details — connect the display windows and framing with the interior treatment.

Solution

Textured metallic finishes create visual continuity across the store. Reflective surfaces work with the lighting and display units, while the illuminated shopfront extends the same material language towards the street.

GAllery
·
GAllery
·
GAllery
·
GAllery
·

Before & After

·
GAllery
·
GAllery
After: Golden Goose shopfront with brass-toned framing, lit display windows and central entrance
Before: black-and-silver flooring installation with a brush, tools and material offcutsright arrow icon
left arrow icon
right arrow icon
Introduction

Finishing process

The photographic record includes the application of the dark and silver floor finish, with brushes, tools and material offcuts visible during the work.

The intervention develops this material treatment across the interior and its display areas.

Conclusion

Finished interior and shopfront

The finished photographs show textured silver surfaces, mirrors, metal display units and linear lighting. The shopfront combines illuminated windows with brass-toned framing.

The result carries the store concept from the interior to the street.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together