Obra Lisboa Blog

Categories
An organised pet-friendly entrance: washing, leads and storage without crowding the apartment
Plan a practical apartment entrance for life with pets: a place for leads, towels, quick cleaning and clear circulation without turning the hall into storage.
Renovating an Apartment in a Protected Lisbon Building: What to Decide Before Ordering Materials
In a Lisbon building with heritage value, replacing windows, changing a façade or reorganising rooms requires more than selecting finishes. Here is what to check before renovation begins.
How to Create a Heat Refuge Room in a Lisbon Apartment During Heatwaves
A practical plan for choosing and adapting the coolest room in your home, cutting solar gains and coping with severe heat with less risk and less improvisation.
A Cooler Kitchen in Summer: What to Fix Before Installing Air Conditioning
A kitchen can overheat quickly in summer. Learn how to manage sun, cooking heat, ventilation and appliances before relying on air conditioning.
Tumble Dryer in a Lisbon Apartment: Installation Without Damp or Shortcuts
Before buying or boxing in a tumble dryer, check ventilation, electrical supply, condensate drainage, maintenance access and building rules.
Preparing an Apartment for Long-Term Rental: Durable Materials and Straightforward Maintenance
A practical guide to renovating a Lisbon rental apartment with durable finishes, accessible maintenance points and comfortable everyday use.
Shared Rooftop Clothes Drying: Avoiding Leaks, Hazards and Neighbour Disputes
A practical guide to planning clothes drying on a shared rooftop: condominium rules, circulation, fixings, drainage, safety and maintenance.
Bicycle washing area in a condominium garage: how to plan it without blocking access
A practical guide to planning a bicycle washing area in a condominium garage, with safe access, proper drainage, straightforward rules and easier maintenance.
Condominium Laundry Room: How to Plan a Shared Space Without Damp, Noise or Disputes
A shared laundry room works only when drainage, ventilation, noise control and usage rules are decided before equipment is bought or walls are closed.
Hydronic Underfloor Heating in a Renovation: Floor Build-Up, Insulation, Zones and Existing-Home Constraints
Planning hydronic underfloor heating in a renovation starts with floor levels, insulation, zoning and equipment access. Use this guide to avoid lost headroom and expensive late changes.