Obra Lisboa Blog

Categories
Living at Home During a Renovation: A Practical Plan for Dust, Air, Access and Safety
Staying at home while work is underway? Learn how to phase the project, contain dust, keep air healthier and protect children, pets and access routes.
Parcel Areas in Apartment Buildings: Organising Deliveries, Packaging and Lobby Circulation
A practical guide to creating a parcel area in an apartment building without turning the lobby, stairs or lift access into an everyday obstruction.
Baby Strollers and Bicycles at a Building Entrance: Creating a Useful Area Without Blocking Access
A stroller and bicycle drop-off area can make daily life easier in an apartment building, provided it protects clear access, safety and condominium rules.
Technical installation noise in a renovation: how to reduce it before walls are closed
Poorly planned pipes, pumps, ventilation and service penetrations can turn a renovation into a daily noise problem. Learn what to decide before walls and ceilings are closed.
Mechanical Ventilation in an Older House: What to Plan Before Renovation
A practical guide to adding controlled mechanical ventilation to an older house: routes, noise, condensate drainage, maintenance access and project coordination.
Radon at Home: When to Test and What to Plan in a Renovation
Radon cannot be seen or smelled. Learn when a test is worthwhile, which parts of a home deserve attention and which renovation details can reduce gas entry.
Durable Flooring for a Home Storage Room: How to Choose and Prepare It Properly
A storage room needs tougher flooring than an ordinary room. Learn how to assess the base, moisture, loads, cleaning needs and suitable finishes.
Painting Area in a Storage Room: Ventilation, Protection and Safe Storage
A painting area in a storage room can be useful without becoming a source of odours, dust or spills. Here is what to plan before opening the first tin.
Tool Pegboard in a Storage Room: Safe Fixings, Loads and Organisation
A practical guide to fitting a tool pegboard in a storage room without overloading the wall, losing tools or compromising safe access.
Full-Length Mirror by the Entrance: Placement, Lighting and Clear Circulation
A practical guide to placing a full-length entrance mirror without narrowing the route, creating harsh glare or leaving the lighting unresolved.