
Choosing a window involves more than the frame material. Its opening arrangement, glazing, components, appearance and connection to the existing or proposed opening all need to be defined.
Obra Lisboa welcomes enquiries for installation and replacement of PVC and aluminium frames, windows and glazed elements. The proposal should identify what will be supplied and fitted, site conditions and the making good included, taking account of how each space is used.
Request a windows and glazing proposalInstalling or replacing windows, frames and glazing
An enquiry can cover one window, several openings in a property or glazed elements identified in the design, including glazed doors where specified. Identify what you would like to install, replace or retain and its relationship with the indoor and outdoor spaces.
For replacement work, the existing frame, condition of the opening and adjoining elements affected need to be understood. In a new building or extension, installation should be coordinated with the dimensions and junctions defined in the design. The proposal should describe the frames, glazing, opening arrangement and components included, together with removal, preparation and the agreed finishing work.
Defining a PVC or aluminium solution
PVC and aluminium are options to consider within your enquiry. To prepare the selection, identify the openings, intended appearance, colour and any frame references already established for the building. If there is a project specification, send it with the drawings.
Comparison should start from identified systems, with their profiles, components and documentation. The material name does not, by itself, describe the complete assembly to be installed. Objectives for comfort, use or integration with the façade should be translated into requirements for the actual solution, without attributing the same result to every PVC or aluminium window.
Opening arrangements, glazing and everyday use
Explain how you use each room and the limitations of the current windows. The choice of fixed and opening sections and how they operate should be coordinated with the available space, furniture, controls and access needed for use and cleaning.
When defining the glazing, identify the daylight, privacy and comfort objectives you would like to consider. If thermal, acoustic or other requirements are specified in a design, these should accompany the enquiry and be related to the documentation for the proposed system. The selection should identify the frame and glazing assembly, without using one feature as a promise of performance for the installed window.
Openings, façades and finishing details
Preparation should consider thresholds, sills, walls, finishes and any shutter boxes or other adjoining elements. Send photographs from inside and outside and identify what you would like to retain. Available measurements help prepare the enquiry; dimensions for supply and installation need to be confirmed within the defined scope.
Where replacement accompanies façade refurbishment or insulation work, junctions should be coordinated with those interventions. The proposal should define internal and external making good and repairs to finishes. If there are signs of water or deterioration around the window, describe them: deciding to replace the frames does not, by itself, establish the cause of every observed problem.
Supply, installation and handover
The proposal should identify who supplies the elements, the reference dimensions and specifications and the installation work included. If you have already bought the frames or appointed another supplier, send the documentation so that responsibilities and installation conditions can be clarified.
The arrangements should consider removal of the existing elements, access, occupation of the property and associated finishes. At handover, the review should refer to the agreed elements, operation, components and making good, identifying any outstanding points. Operating and care guidance and the product documentation planned should be clear within the agreed scope.
Information for your enquiry
Send the property's location and photographs of each opening from inside and outside, where available. Include:
- The number of elements and known approximate dimensions.
- Existing materials and opening arrangements.
- What you would like to replace, retain or alter.
- Preferences for material, colour, opening and glazing.
- Available designs or specifications and requirements to be considered.
- Planned façade, insulation or renovation work.
- Access arrangements and use of the property.
If you have not yet selected a system, explain your priorities and the problems observed. The enquiry can start from these needs, identifying what remains to be confirmed before supply and installation are defined.
Related services
Areas we serve
We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.
View the areas we serveFrequently asked questions
Can I request PVC or aluminium frames?
Yes. Identify the openings and any preferences you already have. The proposal should specify the actual system, including profiles, glazing, opening arrangement and components. The choice should consider the requirements and information available, without assuming that every system using the same material is equivalent.
Can I replace just one window?
You can make an enquiry for a single opening or several elements. Send photographs and approximate measurements, identifying the finishes and components to be retained. The proposal should define removal, installation and the making good needed.
Can I change how the window opens?
This needs to be assessed against the opening's dimensions, available space and intended solution. Identify furniture or other obstructions and send references. The configuration and associated works need to be confirmed before supply is defined.
How should I describe thermal or acoustic comfort objectives?
Explain your objectives and send any design requirements available. The proposal should relate them to an identified system and relevant documentation. Do not assume a guaranteed performance simply from choosing PVC, aluminium or a generic glazing description.
Will replacing the window resolve water ingress around the opening?
The problem needs to be described and assessed in context before the work is finalised. Identify where and when water appears, with photographs and records of previous interventions. The cause should not automatically be attributed to the frames.
Does the proposal include removal and repairs to finishes?
These activities should be identified in the scope. The proposal should clarify removal of the old elements, preparation of the opening and internal and external making good included. If you would also like wider renewal of walls or other finishes, include that requirement.
Which windows or glazed elements would you like to install?
Send photographs of the openings, approximate measurements and any preferences already decided. Identify planned façade or interior work so that we can define supply, installation and making good.
Tell us about your windows and glazing





































