Masonry work should start with each element’s function and its relationship with the building. Creating an internal wall, constructing an external wall or completing one part of a project requires materials, dimensions, openings and junctions to be defined.

The enquiry may form part of new construction, renovation or an extension. The proposal should identify the elements to be built and associated work, distinguishing masonry from the structure, services and finishes the intervention may also involve.

Request a masonry proposal

Construction of masonry walls and elements

The masonry scope should identify each wall or element, its location, intended use and the materials specified in the design or still to be defined. Brick, blockwork and other options should not be selected on appearance alone; the proposal should relate the material to the function and conditions of the work.

For internal walls, the room layout, door openings and junctions with floors, ceilings and existing walls need to be clarified. For external walls, connections to the structure, openings, finishes and other planned layers or work should be identified. Masonry work alone should not be presented as completing every part of the wall.

For an external wall or other outdoor element, describe whether the intention is to enclose a space or whether other functions need to be considered, such as its relationship with changes in ground level. The brief should allow the technical decisions needed before construction is finalised to be identified. Quantities, areas and limits should have a clear basis in the documents and measurements used.

Openings, services and junctions with other work

The intended positions and dimensions of doors and windows should be coordinated with the masonry and the elements to be installed afterwards. Windows, doors, thresholds, sills and finishes should have their supplies and work identified where they form part of the intervention.

Pipes, cables, outlets and equipment also need to be considered before the work is finalised. The proposal should distinguish planned openings or preparation in the masonry from the actual installation of services. Where items will be fixed to the wall, explain what they are and where they will go so that this use can be considered.

Junctions with the structure and existing walls should follow the solution defined for the project. Construction should not proceed on the basis of connection or layout decisions assumed from a photograph or a general material description.

Work to an existing wall

In an existing building, explain whether you want to complete a wall, replace an area, close an opening or change the layout. Send available documents and identify features to retain, known services and previous alterations. An opening or removal should be assessed before it is treated as straightforward masonry work.

The wall’s function and relationship with the rest of the building need to be understood. Where assessment or design is required, the enquiry should identify that work and the documents to be produced before construction is defined. A structural role should neither be assigned nor ruled out solely on the wall’s appearance.

Demolition, protection of existing elements, repairs to adjoining areas and finishes should appear in the scope where included. Design and construction can form part of one proposal, with responsibilities and deliverables identified; commissioning masonry does not, on its own, mean that all this technical support is included.

Preparation, sequence and handover condition

Preparation should confirm dimensions, materials, openings and access conditions. The proposal should clarify supplies, unloading and storage locations, and the relationship with the rest of the project. If the space remains in use, that condition should be considered when planning.

The sequence should coordinate masonry with the specified structural elements, services and intended finishes. Changes to openings, materials or layout should be recorded and their effects clarified before the associated work proceeds. Points that depend on a design decision should not be left implicit in the construction enquiry.

At handover, it is useful to distinguish completed masonry from a wall that has been plastered, rendered, clad or painted. The review should refer to the agreed elements, dimensions and finish condition, identifying work still to be carried out by others and outstanding points.

Information for a masonry proposal

Describe the type of project and locate the walls or elements to be built. Send plans, drawings or photographs and add the dimensions available, without treating details that still need checking as confirmed. Useful information includes:

  • The purpose of the elements and materials already specified.
  • Lengths, heights, thicknesses and openings defined in the design, where available.
  • Junctions with the structure and existing parts.
  • Services, equipment and items to be fixed.
  • Intended finishes and any removal or preparation involved.
  • Access, unloading, occupancy and coordination with the rest of the work.

If a solution has not yet been defined, explain the objective and the documents available. This helps distinguish the development needed from the masonry work to be carried out.

Related services

Areas we serve

We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.

View the areas we serve

Frequently asked questions

Can I request the construction of just one wall?

You can make a defined enquiry, giving the location, purpose and available dimensions. The proposal should clarify junctions with existing elements, openings and the intended finish condition, as well as any associated preparation.

How is the choice between brick, blockwork or another material made?

The choice should relate to the element’s function and the construction specified for the project. Send any available design or specification. If the option is still undecided, the input needed should be identified before the material and work are finalised.

Does the service include creating an opening in a wall?

The opening should be identified as a specific task and assessed in the context of the wall and building. The proposal should distinguish assessment, design, removals and construction where needed. It should not be assumed to be a simple alteration solely because of the intended opening size.

Does the masonry work include plastering, rendering and painting?

Plastering, rendering, cladding and painting should only be treated as included where they are described in the proposal. Explain the final finish you want and any other contractors involved, so that the wall’s handover condition is clear.

Are plumbing and electrical routes considered?

Planned routes and positions should be coordinated with the masonry. Preparation of the elements needs to be distinguished from installation of services and equipment. Send available drawings and identify service decisions still to be confirmed.

Does a new wall include thermal or acoustic insulation?

Those objectives and the corresponding work should be identified in the design and proposal. A result should not be assumed simply because a new wall is built or a material is selected. The requirements and relevant technical documentation need to be considered.

What masonry elements would you like to build?

Send drawings or photographs and identify the walls, openings, intended materials and finishes. Include the type of project and access conditions.

Send a masonry enquiry
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together