
Renovating a house starts with how you use it and the changes you want to make. The work may involve a wider reorganisation, updates to several rooms or a focused intervention in one part of the home.
Your brief should connect the interior work with access, any outdoor areas involved and the features of the building you want to retain. The proposal can then distinguish what will be renovated, what will remain and what needs assessment or design before work begins.
Request a house renovation proposalWhole-house renovation
A whole-house renovation brings together the work needed for the agreed brief across the home. It may cover room layouts, the kitchen and bathrooms, building services, joinery and finishes. The extent should be described room by room and by type of work, so that the term ‘whole-house’ corresponds to what is actually included.
The proposal should identify the services to be renewed or adapted, the equipment to be installed and connections to retained elements. It should also distinguish included materials and equipment from items supplied by the client. Replacing a finish does not, by itself, mean replacing all the services beneath or behind it.
The roof, façades, windows and external doors, balconies, patios and other outdoor areas should be identified individually when they form part of the brief. Renovating the entire interior does not automatically mean working on the whole building and its grounds. Decisions about what to retain, repair or replace help establish a coherent scope and identify the points that still need to be checked.
Partial renovation and phased work
A partial renovation may focus on one floor, the living areas, bedrooms, or kitchen and bathroom updates. Even where other areas are excluded, the brief needs to clarify working access, protection of retained features and the junctions between new work and existing floors, walls, ceilings and services.
If you want to divide the renovation into phases, explain your intentions for the house as a whole at the outset. This allows connections and decisions that affect more than one phase to be considered, rather than treating each room as an unrelated job. The proposal should distinguish the work to be carried out now from plans for the future.
Remaining in the house during the works is a condition to assess. The decision should consider separation between occupied areas and work areas, available routes, expected interruptions and access to essential rooms. It should not be assumed to be possible simply because the brief is described as a partial renovation.
Connecting interior and external work
For a house, the brief may involve the relationship between living rooms and patios, doors to the garden, balconies, entrances and other places where inside meets outside. Explain whether you want to retain these access points, change their arrangement or renew the surrounding materials. New flooring, windows or external doors should be considered alongside the adjoining elements included in the work.
Known problems with the roof, façades or areas in contact with the ground should be included in the enquiry, even where the main aim is to renovate the interior. The proposal should clarify whether those elements are to be assessed or repaired, or whether the scope only includes finishing work in a defined area. A mark or deteriorated feature in a photograph is not enough, on its own, to establish the cause and settle on a solution.
Access for materials, storage locations and protection of outdoor areas are also conditions to define. Boundary walls, gates, outdoor paving or garden equipment should only be treated as included where they are described in the scope.
Renovation, a new house or an extension?
This page concerns renovation of an existing house. Building a new home or adding floor area through an extension or outbuilding requires its own defined scope, even where the brief also includes renovating the existing part. The proposal should distinguish the work to each part and the connections between them.
Layout changes, new openings or work that may affect elements of the building should be assessed before a construction solution is assumed. Where architectural design or other technical input is needed, the objectives, documents and responsibilities should be identified. Describing the work commercially as ‘renovation’ does not replace that assessment.
Design and construction can be covered by one proposal. In that case, it should be clear what is developed and delivered during design and which work and supplies are included in construction. Architectural site support, construction management and construction supervision on the client’s behalf are distinct roles, to be identified where commissioned; they are not automatically included with the building work.
Preparing the work and reviewing the handover
Preparation should turn your objectives for the house into a description of work that supports decisions and provides a reference for the agreed scope. It starts with gathering property information, identifying features to retain and establishing what needs a visit, survey or assessment. Materials, equipment, supplies and working conditions can then be defined on that basis.
Planning should relate the sequence of work to access, any continued occupation and decisions that remain open. The proposal should explain how choices will be confirmed, changes recorded and unforeseen work addressed. If concealed conditions alter the brief, the additional work and its effects on cost and scheduling should be clarified before that work proceeds.
At handover, the review should refer to the commissioned work and agreed changes. Outstanding points should be identified, together with the relevant use and maintenance documentation for supplied materials and equipment. Updated drawings or other technical documents should be expressly included where they form part of the deliverables.
Information for your house renovation proposal
Send the location of the house, its number of floors and a description of the spaces involved. Plans and current photographs help explain the layout and its relationship with outdoor areas. Please also include:
- What you want to change on each floor or in each room, and what you wish to retain.
- Whether the work is limited to interiors or also involves the roof, façades, windows and external doors, and outdoor areas.
- Services or equipment you want to renew and choices already made.
- Known problems, previous alterations and available documents.
- Access conditions and whether you intend to remain in the house for any part of the works.
- Priorities, an indicative budget and your preferred timing.
If you intend to extend the house or build an outbuilding, describe this from the start, even if that part is not yet defined. If you already have a designer, send the available information and explain which decisions remain open. The proposal should show what has been confirmed and what still needs to be developed.
Related services
Areas we serve
We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.
View the areas we serveFrequently asked questions
Does a whole-house renovation include the roof, façade and garden?
These works should only be treated as included when they are described in the proposal. A whole-house renovation may cover all the interiors without extending to the entire exterior. Identify separately any work you want to the roof, façades, windows and external doors, access points and outdoor spaces.
Can I renovate one floor now and the others later?
A phased approach can be considered against the condition of the house and the proposed work. It helps to describe your intentions for the other floors from the outset, particularly where they share services or access. The scope should distinguish the commissioned phase from future work and clarify the connections that need to be considered.
Can I continue living in the house during renovation?
This needs to be assessed against the planned work. Routes, separation from work areas and use of the kitchen, bathroom and other essential spaces all need to be understood. Whether occupation is possible, and the limitations during each phase, should be discussed before arranging to stay in the house.
How are problems discovered after work starts dealt with?
The proposal should define how previously unidentified conditions are recorded and assessed. Before additional work proceeds, the proposed intervention and its effects on scope, cost and scheduling need to be clarified. If a technical assessment is required, that need should be identified before the solution is finalised.
Can I include an extension in the same renovation enquiry?
You can describe both intentions in one enquiry. The extension should have its scope and design needs identified, distinguishing the additional area from the existing house to be renovated. The work can be coordinated in the proposal without treating new floor area as though it were simply an interior update.
I already have an architectural design. What information should I send?
Send the drawings and other available documents, their revision details and the decisions that remain open. It helps to clarify the specified materials and equipment, planned supplies and the support your designer will provide during the works. The construction proposal should relate to those documents and identify what it covers.
Tell us what you want to change in your house
Send photographs, any plans you have and a list of the work by floor or room. Include the features you want to retain, the external areas involved and your plans for occupying the house.
Send a house renovation enquiry






































