Partly boarded partition with metal studs and exposed fibrous insulation.

A room that is difficult to heat, exposure to heat or noise that interrupts rest are different concerns. An insulation enquiry should start by explaining what you want to improve, where the problem is experienced and how you use the space.

Obra Lisboa welcomes enquiries for interior thermal and acoustic insulation. The proposal defines the surfaces covered, the solution to consider, associated work and the limitations of the intervention within the existing property.

Request an insulation proposal

Interior insulation: defining the objective

Interior insulation can form part of work to walls, ceilings or other elements identified for the space. Thermal and acoustic objectives should be described separately: an enquiry about temperature comfort needs different information from one prompted by noise.

Identify the affected rooms, available surfaces and what you want to retain. If the work forms part of a renovation, insulation needs to be coordinated with finishes and alterations to services. The scope can cover one area or several rooms, with the relevant working conditions identified.

When temperature is the concern

Describe which rooms feel cold or hot, when this occurs and how the spaces are used. Information about walls, ceilings, windows, exposure and previous work helps frame the enquiry.

Preparation should clarify which elements need to be assessed and the intended objectives. A material or thickness should not be selected solely from a photograph. Studies, design or performance assessment, where needed, should be identified as specific deliverables.

When noise is the concern

Describe the type of noise, where it is heard and when it occurs. Explain how the affected rooms are used and how they relate to neighbouring spaces. This helps distinguish the observed problem from a solution that has yet to be defined.

The proposal should identify the elements to be addressed and their interfaces with doors, windows, services and finishes. If measurements or an acoustic study are needed to define the enquiry, their scope should be clarified. Complete silence or the same result in every building is not assumed.

Existing conditions and associated work

Defining the intervention involves the space available for the solution, junctions with openings, electrical points, fixed elements and finishes to be renewed. Known damage, stains or moisture problems should also be identified so they can be considered in the assessment.

Explain whether furniture will need to be dismantled, equipment moved or partitions and suspended ceilings altered. These tasks, reinstatement of finishes and removal of materials within the scope should be identified. Interior insulation is distinct from an external wall insulation system such as ETICS; each has its own scope.

From the enquiry to execution

Preparation brings together the objectives, known conditions and available documentation. The surfaces, associated work and technical decisions needed for the proposal can then be defined.

Where a design or study is available, execution should be considered against the documents and specifications applicable to the agreed scope. Design and execution can form part of the same proposal, with their deliverables identified. Work arrangements consider access, occupation of the property and elements that need to remain available. Completion includes reviewing the agreed work and applicable use or care information.

Information for a proposal

Send the location, photographs and available drawings. Identify the rooms and surfaces concerned, describe the discomfort and explain what has already been tried or altered. Include any reports, measurements, studies or design documents available.

Also explain occupation of the property, access, furniture to retain and other planned work. If you do not yet know the solution, describe the objective rather than selecting a material in advance. This helps clarify the assessment needed and the limits of the proposal.

Related services

Areas we serve

We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.

View the areas we serve

Frequently asked questions

Can the enquiry cover just one bedroom?

Yes. Identify how the room is used, the discomfort experienced and its relationship with neighbouring spaces. Localised work needs to consider which elements can be addressed and the limitations of the intended result.

Do the windows need to be replaced to improve insulation?

That decision should be assessed in the context of the property and the objective. Send information about the existing windows and describe the problem. The enquiry may concern openings, other surfaces or a combined intervention; replacement is not assumed.

Does the same solution address cold, heat and noise?

The objectives should be identified separately. The proposal needs to explain the solution for the particular case and the elements covered, without automatically attributing every intended result to one material.

Does the service include measurements or engineering design?

These deliverables should be identified when needed or requested. They can form part of the same proposal as execution, with defined scopes and responsibilities. Studies or testing are not assumed to be included in every insulation enquiry.

Is interior insulation the same as ETICS external wall insulation?

This page concerns work from inside the building and the associated tasks within the space. External wall insulation using an ETICS system has its own scope. If you want to explore both possibilities, explain this and describe the building’s conditions.

Can all noise be guaranteed to disappear?

Selecting a material alone does not establish such a promise. The enquiry should define the problem, objectives and available assessment. The solution and its limitations need to be considered for the particular property.

What would you like to improve in your space?

Describe the affected rooms, the discomfort experienced and any work already carried out. Include photographs, drawings and available studies to help define the intervention.

Send your insulation enquiry
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together