Façade rehabilitation starts with identifying the elements and areas involved, what you want to retain and the conditions that need assessment. The enquiry may concern a defined area or a wider programme of work to the building envelope.
The proposal should connect repairs with the finish and interfaces with windows, the roof, balconies and other elements. Painting, external insulation, window and glazing work, and waterproofing should have their scopes identified according to the intended intervention.
Request a façade rehabilitation proposalDefine the façade rehabilitation work
The scope should identify the façades, floors and areas involved, distinguishing surfaces to retain, repair or replace. It may cover local removal, work to the underlying surface, reinstatement of finishes, joints, junction details and the final finish, according to the solution defined for the building. The proposal should explain the extent of each component and its connection to retained areas.
Existing materials and the features that characterise the façade should be considered from the outset. Explain what you wish to retain and provide information on previous repairs, colours, components or finishes that need to be coordinated. The work should define transition areas and adjoining elements that will be protected or worked on.
Rehabilitation should not be described simply as new paint or a general list of materials. The brief should allow work to the underlying surface and façade elements, finishing decisions and planned checks to be identified. The commissioned scope should be distinguished from an assessment of the building as a whole.
Record the existing condition before defining the work
General and detailed photographs help locate cracks, stains, loose areas, missing material and previous repairs. Explain where they occur, when they were observed and whether there is information about changes over time. Where there are signs inside the building, their locations should also accompany the enquiry.
Preparation should distinguish observations from conclusions. A visible sign should not be presented as confirmation of a cause, a structural condition or a repair method. Where information is missing, the assessment needed, its scope and its limits should be identified before the work is finalised.
Any diagnosis or design needed can be coordinated with construction in the same proposal, with its own objectives and deliverables. Finishing work alone should not be presented as a substitute for that technical definition.
Coordinate painting, insulation, windows and waterproofing
Painting and finishes
Painting may be the final finish of a wider intervention or the main task in a defined brief. The proposal should distinguish preparation and repairs to the underlying surface from application of the finish. The area painted should not be used as an automatic measure of everything that has been rehabilitated.
External thermal insulation
If the brief includes an external thermal insulation composite system, or ETICS, its scope, specification and interfaces should be identified. It needs to be related to openings, junctions, projecting elements and the finish. Façade rehabilitation does not automatically include external insulation, or justify a thermal performance promise without a defined system and context.
Windows and glazing
Explain whether windows and other glazed elements will be retained or replaced. Junctions with the façade, sills and adjoining finishes should be coordinated with that decision. The supply and installation of frames and glazing need to be described where they form part of the work.
Waterproofing
Where associated waterproofing work is included, the elements covered and their connection to junctions and finishes should be identified. That scope may relate to the roof, balconies or other areas, without treating all façade rehabilitation as a general application of a waterproofing product.
Select access and organise the affected spaces
Rope access is a means of reaching areas for certain interventions. The choice between that method and other means of access should be assessed against the work, building configuration, access and surroundings. The access method does not, on its own, identify the repair needed or confirm its suitability for every façade.
Preparation should identify entrances, passageways, balconies, windows and outdoor spaces that may be affected. The proposal should clarify working and support areas, planned protection and restrictions on use to be considered. Where there are several façades or spaces with different uses, the option of phasing should be discussed.
The enquiry should identify the project’s main contact and the building’s known access and use conditions. Planning needs to relate those conditions to the work sequence and the access arrangements defined for the site.
From preparation to handover
Before work begins, the intervention areas, specified construction, materials and outstanding decisions should be confirmed. The sequence should coordinate work to the underlying surface, associated components and the finish, identifying points that depend on other parties or technical confirmation.
Where initially unknown conditions are discovered, additional work and its effects on scope, cost and scheduling should be clarified before that work proceeds. Changes to materials, colours or areas should be recorded and related to the proposal.
At handover, the review should refer to the agreed areas and work, including the junctions and interfaces covered. Records, checks and maintenance information should correspond to the services and products actually included. The documentation should identify outstanding points and the limits of a partial intervention.
Information for a rehabilitation proposal
Send the location and general photographs of the building, together with images of the areas that prompted your enquiry. Identify the façades and floors involved and gather, where available:
- Plans, drawings or previous reports.
- Existing materials and finishes, and features to retain.
- Previous repairs and known signs of problems inside or outside.
- Any intention to change paint finishes, insulation or windows.
- Access conditions, support areas and building use.
- Priorities, an indicative budget and your preferred timing.
For a local repair, mark its limits and explain the objective. For a wider intervention, identify the components to be considered so the proposal can distinguish assessment, design development and construction.
Related services
Areas we serve
We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.
View the areas we serveFrequently asked questions
Is painting a façade the same as rehabilitating it?
Painting can form part of the work, but the rehabilitation scope should also identify any required and commissioned work to the underlying surface, finishes, joints and junction details. A new colour or finish does not, on its own, demonstrate that every façade problem has been addressed.
Does a crack immediately reveal the repair needed?
The crack should be located and recorded, along with information about changes over time and the building. An isolated observation should not be presented as a completed diagnosis. Preparation should identify whether further assessment is needed before the work is defined.
Is external insulation included in façade rehabilitation?
ETICS should only be treated as included where the system and corresponding work are described in the proposal. It should be coordinated with the condition of the underlying surface, openings, junctions and other elements involved. It is not an automatic component of every rehabilitation project.
Can I replace the windows as part of the same work?
You can include that intention in the enquiry. The proposal should identify the frames and glazing to supply and install, and the work connecting them to the façade. The decision to retain or replace windows should be considered when defining the junctions and work sequence.
Is rope access suitable for every façade rehabilitation project?
The suitability of the access method depends on the intervention and site conditions. It should be assessed alongside the work and organisation required. Using ropes does not replace the definition of the repair or establish that every service can be carried out that way.
Can the work cover just one façade or one area?
A partial scope can be defined, identifying its limits, junctions with retained areas and objectives. The proposal should clarify exclusions and coordination with the rest of the building. A local intervention should not be presented as assessment or rehabilitation of the whole building.
Which parts of the façade need work?
Send photographs and information about previous work, existing materials and what you wish to retain or change. Explain the access conditions and how the building is used.
Send a façade rehabilitation enquiry