Planning building works, changing the use of a space and addressing an existing built situation are enquiries with different starting points. Preparation begins with understanding the property, the objective and the available documents. Plans, documents from previous applications and a description of changes help distinguish what is recorded from what needs clarification.
Obra Lisboa provides this support within its architectural services. The scope can bring together an initial review of information, preparation of documents and support with the application paperwork, according to the enquiry. The proposal identifies the deliverables and associated design or survey work, without anticipating the outcome of the competent authorities’ assessment.
Request support with your applicationChange of use
A change-of-use enquiry starts by comparing the documented use, the observed situation and the intended use. For example, a proposal to adapt commercial premises for a different purpose needs a description of the areas involved, planned changes and available property information. The assessment does not begin by assuming that the proposed use is admissible.
The change-of-use regime distinguishes situations according to the preceding building works. Indicate whether the proposed change involves works, whether they have already been carried out and what documentation accompanies them. Preparation can include organising information, identifying missing documents and developing change-of-use design work within the agreed scope.
The proposal clarifies the drawings, written information and coordination with other design disciplines to be prepared. The applicable procedure is confirmed for the property and the timing of the application; a general reference to change of use does not establish that route on its own.
Building regularisation
Where works have already been carried out or the property differs from the available drawings, the first task is to organise the history and identify those differences. Information may concern the internal layout, areas, extensions, façade changes or other interventions the client wants to clarify. Documented facts, information provided by the client and matters still to be confirmed should be distinguished.
Regularisation depends on whether compliance with the applicable rules can be achieved. The proposed support can include a survey, comparison of records, preparation of documents and follow-up on requests for clarification about the situation presented. The extent of each task is identified in the proposal.
The existence of a building does not establish in advance that regularisation will be possible. Any incompatibilities, insufficient documentation or need for changes identified during the assessment inform the next decisions. The service prepares information to address the case; it does not turn an unknown situation into guaranteed approval.
Licensing and prior notification
Licensing and prior notification have distinct scopes under Portugal’s legal framework for urban development and building works (RJUE). Preparation starts by identifying the intended operation, location, previous records and available design information. The work to be developed is framed by these details, without treating the two procedures as interchangeable names for the same application.
For licensing, the scope can include preparing the architectural drawings, written information and supporting documents for the application. For prior notification, known as comunicação prévia in Portugal, documentation is organised for the identified operation and procedure. The proposal lists the documents to be produced, information to be supplied by the client and coordination with the other design disciplines required within the scope.
Preparation, submission and follow-up on requests for clarification should be distinguished in the proposal. Applicable sources and conditions are checked for the particular case; no universal document list is provided and no exemption from control is assumed.
Existing documents and missing information
For the initial review, bring together plans, designs and documents from previous applications, photographs, correspondence received and identification of the property. Indicate which documents you understand to be approved and retain the references that identify their origin. If some information is unavailable, record the gap instead of filling in the history by assumption.
An old drawing can help explain the property, but the scope should clarify whether it will be compared with the current condition. Where documentation of the existing building is needed, the survey identifies the areas, elements and level of detail to be delivered. The starting information and matters still to be confirmed should accompany the documents produced.
Documents, submission and support through the process
The proposal can include document review, drawings and written material, preparation for submission and support with requests for clarification. It is useful to identify document versions, the material delivered and decisions dependent on further information. If an application is already in progress, its reference number and correspondence received help frame the support required.
Architectural design, other design disciplines, surveys and support with the application paperwork have different deliverables. They can be included in the same proposal with their respective scopes identified. The definition also clarifies how new documents or changes requested during the process will be addressed, without assuming unlimited revisions or automatic inclusion of every service.
How to prepare an enquiry
Indicate the location, current use and objective: preparing future work, changing the use or assessing works already carried out. Include the available documents and a straightforward description of the differences or alterations you want to address. Note known dates, application references and requests for clarification without anticipating the assessment’s conclusion.
The scope and programme for the technical work are defined from the information assembled, documents to be prepared and support required. The time needed to prepare that work and the progress of the administrative procedure are distinct factors. The proposal can organise stages and deliverables, but it does not guarantee an outcome dependent on external assessment.
Related services
Areas we serve
We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.
View the areas we serveFrequently asked questions
I want to change the use of a space. What should I send?
Indicate the current and intended use and whether works are planned or have already been carried out. Include plans, photographs and any documents from previous applications. The initial review identifies missing information and the architectural work needed to prepare the enquiry, without anticipating whether the new use is admissible.
Can I request support for work already carried out?
You can present the situation for assessment. Describe the changes, dates you know and available documents. The scope can include documenting the existing building and preparing drawings and information, with matters still requiring confirmation made clear. Presenting the enquiry does not imply a favourable outcome.
Is an old drawing enough to make a start?
It can provide a starting point alongside photographs and a description of the objective. The drawing’s origin and any known differences from the property should be identified. The proposal clarifies whether it includes a survey, updating or comparison of documents and which deliverables are included.
What if I do not have all the property documents?
Send what you have and identify what is missing. The initial review can organise available references and define the further information to be obtained or prepared. An unknown history is not filled in by assumption, and the initial documents are not presented as sufficient before they have been reviewed.
Does the proposal include other design disciplines and support until completion?
Architectural documents, other design disciplines, surveys, submission and subsequent support should be listed. They can form part of the same proposal with identified deliverables and limits. The scope should clarify which stages are covered and how additional requests or changes to the original objective will be addressed.
Can approval or a completion date for the procedure be guaranteed?
The proposal defines the technical work and its programme using the information available. It does not guarantee the outcome or progress of external assessment. Documentation issues, changes to the enquiry and further information are followed up within the agreed scope, with outstanding matters kept clear.
Outline your architectural and documentation enquiry
Share the location, objective and available documents. Indicate whether the enquiry concerns future works, a change of use or an existing built situation so that the support required can be defined.
Send an enquiry for assessment