
A shop, an office and a restaurant use space, accommodate people and organise equipment in different ways. Renovation starts with understanding the activity and what needs to change: the layout, building services, finishes or a wider combination of work.
Obra Lisboa welcomes enquiries for the renovation of shops, offices, restaurants and cafés. The proposal identifies the work to be carried out, the elements to retain and the interfaces with design, equipment and other suppliers.
Request a proposal for your premisesShops and commercial premises
In a shop, the entrance, displays, customer service and storage need to be considered together. Describe the products or services on offer, how customers will be welcomed and the routes you want to keep clear. This helps frame discussions about layout, lighting, furniture and finishes.
The work may involve refreshing finishes or reorganising several areas. Shopfronts, counters, fitting rooms, toilets and support areas should be identified in the enquiry, distinguishing what will be built, supplied or reused.
Offices
Office renovation starts with how people work: fixed or shared desks, meetings, visitors, focused work and storage. Explain how many people use each area and where greater privacy or separation is needed.
Partitions, lighting, power and data points, flooring and furniture need to be coordinated with the proposed equipment. Acoustic, heating, cooling, ventilation or accessibility needs should inform the assessment and agreed scope, without assuming the same performance or solution for every office.
Restaurants and cafés
In a restaurant or café, the dining area and counter are connected to preparation, storage, washing and the movement of people and products. The enquiry should describe how the business will operate and which equipment will be installed or retained.
The proposal can coordinate finishes, furniture, building services and work needed for the new arrangement. Water, drainage and electrical connections, along with any ventilation or extraction to consider, should be discussed in relation to the equipment and available designs. Professional equipment supply and support with administrative procedures are included only when specified. The building work is not presented as a guarantee of permission to operate.
The work, the business and the opening date
Explain whether the premises will be empty or whether you hope to keep some activities running. Access, separable areas, noise, dust, deliveries and possible service interruptions all need to be considered. Phased work is an option to assess, not a promise of uninterrupted operation.
The preferred opening date or return to the office should be considered alongside the work, design decisions, supplies and equipment installation. Completion of the building work and readiness to operate may have different dependencies, which should be identified at the outset.
From the brief to handover
- Define the activity and priorities. Identify areas, users, equipment and elements to retain.
- Assess the space and interfaces. Gather available drawings and designs, and clarify building services, interior design or administrative support needs.
- Set out the proposal. Distinguish work, materials, client-supplied items, third-party work and exclusions.
- Organise delivery. Agree access, sequence, outstanding decisions and arrangements around the business.
- Prepare for handover. Review the work covered and the agreed documentation, recording any matters still to be completed.
Design and construction can form part of the same proposal, with their respective scopes identified.
What to send with your enquiry
Send the location and approximate area, photographs, existing plans and a description of the activity. Mark the areas to change and the furniture, services or equipment to retain. For a restaurant or café, include the equipment list and intended operational layout; for an office, describe the desks and shared areas.
Also explain access, available working hours, other suppliers’ work and the preferred date for use. Area, existing condition, extent of alterations, materials and supplies help establish cost and programme; a reference photograph does not replace a defined scope.
Related services
Areas we serve
We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.
View the areas we serveFrequently asked questions
Can the business stay open during renovation?
This needs to be assessed before the proposal is agreed. It depends on the work, the areas that can be separated, access and any necessary interruptions. Explain which activities need to continue so that planning can establish what is practical and under which conditions.
Can I renovate only part of the shop or office?
Yes. Identify the area and the work required, including the elements to retain. A localised intervention still needs to address junctions with floors, walls, services and furniture that will remain in place.
Is restaurant equipment included?
The supply, installation and connections for each item should be set out in the agreed scope. Send models or technical information for the proposed equipment and identify the suppliers involved. Renovating the premises does not automatically include all professional equipment.
How are furniture, signage and third-party works handled?
The proposal should identify who supplies and installs each item and what conditions it requires. Delivery dates, dimensions and connections need to be coordinated with the work. Furniture, signage and other supplies are included only when specified.
Can an opening date be fixed at the first enquiry?
You can give the preferred date as a planning objective. The programme will be considered alongside the condition of the premises, scope, outstanding decisions, supplies and access. Opening to customers and completion of the work should not be treated as the same commitment without clarifying the remaining dependencies.
Does the proposal include design and permissions?
It can bring several scopes together, but should identify which are included. Design, construction and any support with administrative procedures have their own deliverables and responsibilities. Send the available documentation so these can be considered; an administrative approval is not assumed to be part of the renovation.
Plan the renovation of your premises
Tell us about the intended activity, the changes you need and when the space will be available. Include drawings, photographs and information about the proposed equipment.
Tell us about your premises






































