Illustration of a site inspector consulting drawings beside an unfinished wall.

Construction supervision on the client’s behalf (fiscalização de obras) monitors work against the design and helps identify technical matters requiring a response. The service needs clear reference documents, review stages and responsibilities.

Obra Lisboa welcomes construction supervision enquiries in Greater Lisbon. Preparing a proposal involves reviewing the project stage, available designs, work to be monitored and the parties involved in construction.

Request a supervision proposal

When to arrange supervision

Supervision can be planned before construction starts, allowing the documentation and stages to be monitored to be identified. You can also enquire about work already under way, explaining what has been completed and what remains accessible for observation.

The service is particularly relevant when the client needs support in reviewing questions arising between design and construction, recording observed deviations and referring decisions to the responsible participants.

Checks and records to define

The proposal should specify the activities and records intended, which may cover:

  • Review of documents used as the reference for supervision.
  • Site visits and observation of work at identified stages.
  • Records of observations, questions and matters requiring a response.
  • Review of proposed changes within the commissioned technical scope.
  • Communication of matters to the responsible participants and follow-up of responses.
  • Support with reviewing the work and documentation planned for handover.

Visit reports, photographic records, outstanding-item lists and meetings are defined around the need. Tests, specialist measurements and other additional services should be identified where required.

Scope, participants and access to information

The contractor, designers and other participants need to be identified before a proposal is prepared. The professional appointed to lead supervision on the client's behalf (diretor de fiscalização de obra) has specific duties and is subject to legal restrictions concerning links with companies carrying out the works.

Supervision requires access to the site, current designs and relevant decisions. The frequency and timing of visits are defined according to the work and the requirements of the role. Work already concealed or completed requires a separate assessment of the information available.

Construction supervision, technical direction of the works (direção de obra), construction management and health and safety coordination should be identified as distinct functions. The agreed scope organises the service and does not remove applicable legal obligations.

How supervision is organised

  1. Understand the project. Identify the work, participants, current stage and support required.
  2. Gather the reference documents. Collect designs, the building contract, programme and available decisions.
  3. Define the monitoring arrangements. Identify stages, visits, records and channels for addressing matters raised.
  4. Observe and record. Document what is checked and matters requiring analysis or a response.
  5. Follow through to resolution and handover. Record responses, outstanding items and the documentation planned for completion.

A record should identify the location, relevant design reference, person responsible for responding and current status. Cost or programme changes require their own review between the appropriate participants.

What to include in a proposal request

Tell us the location, type and scale of the works, and the planned start date or current stage. Include the available information and identify:

  • The client, contractor and designers involved.
  • Designs, specifications and versions guiding construction.
  • The building contract or quotation and existing programme.
  • Work already completed and stages yet to begin.
  • Known technical issues or changes under discussion.
  • The support required and the people responsible for decisions.

If construction has started, also identify any records of earlier stages. The proposal should reflect the supervision that can be arranged from that point onwards.

Related services

Enquiries across Greater Lisbon

We welcome enquiries for Lisbon, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability is assessed for each location, type of work and project stage.

View service areas

Frequently asked questions

When should I enquire about construction supervision?

Enquire before construction starts where possible. This allows the designs, participants and planned stages to be reviewed. If work is already under way, explain its current status so the supervision required from that point can be assessed.

Can supervision begin partway through construction?

You can enquire at that stage. Completed work, concealed areas, available documents and outstanding issues need to be identified. The assessment should clarify what can be observed and which additional information is needed.

Does supervision mean someone is permanently on site?

Site attendance is defined for the project and the requirements of the role. The proposal should explain visits, stages to be monitored and communication arrangements. Frequency must suit the work; permanent attendance should not be assumed without that agreement.

Can the contractor’s team also provide construction supervision on the client’s behalf?

Appointment as diretor de fiscalização de obra is subject to legal restrictions concerning links with companies carrying out the works. The position of the professionals and companies must be checked before appointment. Identify all participants in the enquiry so this can be assessed.

Does supervision include managing the teams every day?

Daily organisation of construction, construction management and technical verification of the works have distinct functions. The proposal should identify each need and the responsible parties. Commissioning supervision does not automatically include technical direction of the works or construction management.

What can be reviewed at handover?

The service may include a review of the work covered, outstanding items and planned documentation. The scope of that review should be defined. Specific tests, inspections and certifications retain their own requirements where applicable.

Plan the technical supervision of your construction work

Send the location, current stage, available designs and details of who is carrying out the work. Describe the support you need.

Request a supervision proposal
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together