Hands over an architectural plan beside a quantity table without values and a calculator.

When preparing to appoint a building contractor, it is useful to understand which works are defined, how they will be measured and which costs still depend on choices or further information. An organised set of measurements and quantities helps put these questions on a common basis.

Obra Lisboa welcomes enquiries for quantity take-offs, bills of quantities and cost estimates within its engineering services. The proposal identifies the documents to be used, work covered and deliverables. An estimate provides a cost reference with explicit assumptions; it is not a guaranteed construction price.

Request a measurement and cost estimate proposal

Quantity take-offs, bills of quantities and estimates

Measuring the works

Quantity take-offs measure the identified works using the available information and agreed criteria. The scope should identify the building areas and design disciplines covered, drawing versions and supporting information used. Quantities that still need confirmation should be clearly identified.

Bills of quantities

The bill organises the works into items with descriptions, units and quantities at the level of detail defined for the enquiry. This structure makes clear what has been measured and relates each item to the intended work. Descriptions should clarify the components included, so that a broad label does not conceal differences between proposals.

Cost estimates

An estimate associates a cost reference with the scope assessed, identifying the information and assumptions used. It can support preparation for a decision or comparison of options. A bill of quantities and an estimate are related deliverables, but the enquiry should clarify whether it covers measurement alone or cost assessment as well.

Source documents and reference versions

Bring together the available designs, drawings, specifications and written descriptions. Identify their dates or versions and any known changes not yet incorporated. Preparation should clarify which documents provide the basis and which parts of the work are still being developed.

Where several design disciplines are involved, work at their interfaces needs to be recognised so that measurement can be defined and possible overlaps or gaps identified. A quantity should not be filled in by assumption without that condition being recorded. If site measurements or further information are needed, that work and the corresponding access arrangements should be included in the agreed scope.

Changes made after the reference documents require an identified update. The deliverables should distinguish the initial measurement from revisions and make clear which areas each version covers.

Measurement criteria, units and item descriptions

Defining the criteria clarifies how the works will be organised and measured. Lengths, areas, volumes or numbers of units should be related to the item description and supporting information. The same work title can cover different content where the included components have not been identified.

The proposal should state the level of detail and the intended treatment of associated work, removal, preparation or finishing details where these form part of the enquiry. Materials, finishes or equipment still to be selected should be marked as outstanding decisions. Measurement does not replace the technical definition of those elements.

If the bill needs to follow an organisation or criteria already adopted by another party, send that reference. The aim is to prepare a deliverable suited to the intended stage, with criteria and limits that can be read alongside the quantities.

Cost basis, assumptions and exclusions

An estimate should identify its reference date, how far the works have been defined and the source of the cost information used. If supplier quotations or other figures are available for review, send them with their scope and conditions. Comparison needs to retain that information, without treating figures for different works as equivalent.

Choices awaiting confirmation, work outside the scope and figures requiring clarification should be identifiable. The deliverable should also explain how charges, taxes or other components have been treated, rather than leaving them implicit in a total. No fixed contingency percentage or uniform price for every intervention is assumed.

The estimate relates to the information and scope assessed. Appointing a contractor depends on the construction proposal and the conditions agreed. Changes to design, supplies or work should be related to the need to revise the cost reference.

Comparing proposals and managing revisions

A bill can provide a basis for requesting prices for identified works. If the enquiry includes comparison of proposals received, the review should show differences in scope, quantities, inclusions and exclusions alongside the figures. A lower total alone does not establish whether the proposed works are the same.

Support with comparison should have defined deliverables: a schedule of differences, questions to clarify or an updated estimate, according to the scope. Negotiation, appointment and management of construction are tasks to identify where wanted; producing the bill does not automatically include them.

At handover, files should identify the version, reference documents, criteria and outstanding points. Editable formats, organisation into work sections and later revisions are defined in the proposal. When the design changes, the update should make clear what has changed and the information on which the new version is based.

What to send with your enquiry

Give the location, type of intervention and the decision you want to support: preparing a request for prices, comparing options or organising an estimate. Send the available information and include:

  • Designs, drawings and specifications, with known versions.
  • Areas and design disciplines to be measured.
  • Work already defined and choices still open.
  • Previous bills or estimates and subsequent changes.
  • Proposals received, if their comparison is to be included.
  • Delivery formats and dates relevant to the decision.

If the design is not yet sufficiently developed, explain the objective and available information. The proposal should identify the level of estimate that can be prepared, the assumptions needed and the information to complete before more detailed measurement can proceed.

Related services

Areas we serve

We welcome enquiries in Lisboa, Oeiras, Cascais, Sintra, Amadora, Odivelas and Loures. Availability and the feasibility of the work are assessed for each enquiry.

View the areas we serve

Frequently asked questions

What is the difference between a bill of quantities and an estimate?

The bill organises the works, units and quantities. The estimate adds a cost reference with the information and assumptions used. You can request one or both deliverables, identifying the purpose and level of detail you need.

Can an estimate be prepared without a complete design?

An enquiry can start with the available information. The level of detail, assumptions and gaps should be explicit, without presenting an initial estimate as final measurement of all the works. The proposal identifies what can be prepared and what depends on further development.

Does measurement always include a site visit?

The source of the data and any need to gather information on site should be clarified in the proposal. Measurement from drawings does not, by itself, imply a site survey or confirmation of every building element. If you need that work, identify the areas and access conditions.

Is the estimate the final construction price?

No. The estimate is a reference associated with identified documents, scope and assumptions. The construction price depends on the contractor’s proposal and agreed conditions. Differences in scope and later changes need to be considered before figures are compared.

Can proposals from several contractors be compared?

That support can form part of the enquiry using the proposals and reference documents available. The scope should identify the review of differences, inclusions, exclusions and questions to clarify. Producing the bill does not imply that negotiation, contractor selection or construction management are included.

How is the bill updated when the design changes?

A revision should start from the amended documents and identify the affected items, new version and assumptions that remain. The proposal clarifies which revisions are included and how additional work will be addressed. The previous version should remain distinguishable from the updated information.

Which works do you need to quantify?

Send the available documents and explain the decision you want to support. Identify the design disciplines, detail and deliverables you need so that the measurement and estimate scope can be defined.

Send a measurement and cost enquiry
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
let's create
together