Draughts in an older apartment

Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Older Lisbon apartment living room with a balcony door and light curtains beside the window.

Before replacing windows, find where draughts are coming from and correct the simple faults without blocking the home’s ventilation. In an older Lisbon flat, discomfort may come from a gap between sash and frame, a roller-shutter box, the entrance door, a poorly finished threshold, or a cold wall that feels like an air leak. Working in the right order prevents a major purchase from being used to solve a minor adjustment problem.

Contents

  1. Why a draught does not always come from the window
  2. How to carry out a safe home check
  3. Air leak, condensation or thermal bridge?
  4. What to correct first
  5. When repair, sealing or replacement makes sense
  6. When to call a professional

Why a draught does not always come from the window

An old window is an obvious suspect, yet it is not the only one. Air may enter through gaps around a balcony door, a roller-shutter box, service penetrations, sockets on external walls, or an entrance door facing a cold shared stairwell. In other cases there is no meaningful air leak: a very cold wall or pane can create downward air movement along its surface and feel like a draught.

At Lisbon’s Instituto Geofísico station, the 1991–2020 climate normal gives January an average temperature of 11.8 °C and an average minimum of 8.6 °C. The difference between heated indoor air and a cold building envelope makes these spots especially noticeable near tall openings and external walls. See the IPMA Lisbon climate normal for the local context.

Start with a simple plan of the flat: mark each window, external door, shutter box, grille and wall where discomfort is noticeable. Record whether it happens in windy weather, only at night, after heating is switched on, or on rainy days. That pattern is more useful than a general feeling that the home is cold.

How to carry out a safe home check

Choose a cool day with some wind. Close the windows, temporarily turn off extractor fans, and inspect the home slowly. Do not use a flame, incense or smoke near curtains, gas appliances or combustion equipment.

  1. Hold a narrow strip of paper near window joints, door corners and the junction between frame and wall. Consistent movement suggests air passing through.
  2. Watch lightweight curtains: if they move with everything closed, check the nearest joints first.
  3. Confirm that the sash closes without force and that the latch pulls it firmly against the seal. A dropped sash can leave a continuous gap.
  4. Look for visible light around the entrance door with the stairwell light on.
  5. Photograph split seals, open silicone joints, decayed timber and cracked finishes before asking for quotations.

Portugal’s Directorate-General of Health recommends weatherstripping doors and windows to reduce cold air entry and heat loss, while also stressing the importance of keeping the home dry. Read the DGS cold-weather recommendations.

Air leak, condensation or thermal bridge?

The diagnosis determines the repair. An open joint beside a frame calls for adjustment, a seal or a properly finished junction. A dark corner behind a cupboard can point to a cold surface and weak air circulation; covering a grille or sealing every gap around a room is likely to make moisture worse. If a stain grows after rain, water ingress is another possibility and should be resolved before any decorative repair.

Ventilation remains essential. The DGS identifies bathrooms as an important source of household moisture and recommends adequate design and use of ventilation. Read the DGS indoor-air guidance before sealing grilles or reducing gaps that form part of an existing ventilation route.

Signs that help you choose the next step
What you noticeLikely causeFirst decision
Paper moves beside a frame or doorAir leak at a joint or closing pointAdjust hardware and inspect seals
Cold area with no air movementThermal bridge or poorly insulated surfaceAssess wall details and moisture before sealing
Stain worsens after rainWater entering from outsideInvestigate façade, window frame or threshold
Windows mist up after bathing or cookingIndoor vapour and insufficient ventilationExtract moisture and ventilate in a controlled way
Close view of an apartment window in Lisbon while joints and seals are being checked.

What to correct first

Begin with what is visible and reversible. Clean the lower drainage channels in the frame, remove dust from rubber seals and check that paint is not bonding the sash to the frame. If the window rubs, does not pull tight at the latch or has uneven gaps, adjusting the hardware may restore pressure against the seal. At doors, inspect the threshold, trim and frame for cracks or separation.

Self-adhesive seals can work on regular gaps and clean surfaces, but they do not correct warped timber, loose frames or water ingress. Avoid applying expanding foam or silicone without understanding where water must drain: a finish that blocks drainage can move the problem into the wall.

For colder months, ADENE’s campaign recommends short, effective airing rather than leaving a window slightly open for a long time; it also advises sealing doors and windows with air leaks. Read the ADENE winter-heating guide before setting a new routine.

When repair, sealing or replacement makes sense

Repair makes sense where the structure is stable, the window closes properly after adjustment, and the issue is concentrated in seals, hardware or perimeter joints. Sealing has a narrower role: it reduces unwanted air paths; it cannot turn a decayed frame into an efficient window.

Replacement deserves proper assessment where distortion persists, the glazing is unsuitable for the room’s use, the frame cannot be made weathertight, noise remains excessive, or wider internal-insulation work is planned. In that case, ask for a quote that states the glazing, opening type, installation method, drainage, reveal and sill finishes, shutter reinstatement and making good. A good window loses part of its benefit if its connection to the wall is poorly detailed.

If you are changing internal doors, keep the airflow route in mind. Our guide to interior doors and ventilation explains how to avoid stuffy bedrooms when altering gaps, doors and extraction.

When to call a professional

Ask for technical assessment when there is water entry, rotten timber, a loose frame, cracking around an opening, recurring mould, widespread condensation or a façade alteration. In an apartment building, replacing frames can affect the external appearance and may require confirmation of condominium rules, particularly where colour, profile design or division of openings changes.

Do not close ventilation grilles serving gas appliances, dismantle shutter boxes with damaged cables or mechanisms, or work externally from a window without safe access. Once winter leaks are resolved, summer comfort can be improved by coordinating the frames with solar protection and a night-ventilation routine. Insect screens for Lisbon windows can support that routine without improvised alterations to the frame.

Take a symptom list, photographs and the results of the paper test to the site visit. It helps separate a straightforward adjustment from work that genuinely needs a renovation solution.

Key takeaways

  • Test joints, hardware, thresholds and shutter boxes before blaming the entire window.
  • Do not mistake cold air movement beside a wall for an air leak: insulation or moisture treatment may be needed.
  • Seal unwanted air paths while preserving the ventilation required in kitchens, bathrooms and gas-appliance areas.
  • When replacement is needed, ask for installation and junction details as well as the window specification.

If you are planning a Lisbon renovation, include a review of draughts, moisture and opening details before finalising the scope of work. Obra Lisboa can help turn that diagnosis into a clear, coordinated renovation brief.

Sources and further reading

Editorial image; it does not depict an Obra Lisboa project.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together