
When windows are replaced, polyurethane foam, expanding tape and mortar are not interchangeable choices: each deals with a different part of the reveal. The right decision depends on the gap between frame and wall, exposure to rain and wind, the planned finish and the need to retain controlled ventilation. A high-performing window loses much of its value if it is poorly packed, poorly sealed or hidden behind a reveal that soon cracks.
Contents
The junction between the frame and masonry must perform jobs that rarely fit into one product: hold the window without distorting it, limit uncontrolled air leakage, stop rainwater getting in, and allow internal and external finishes to move without cracking. Ask for the reveal as a system rather than accepting the vague instruction to “foam around it”.
The technical rules used for energy assessments treat the air permeability of windows and shutter boxes as relevant to infiltration estimates. Where there is no pressure test, external frames and shutter boxes are treated as key leakage points; the stated class should be traceable through a label, CE marking or technical data sheet. Read the Portuguese official technical guidance on infiltration and air-permeability classes before comparing quotations.
There is an important distinction in Lisbon flats: removing draughts does not mean removing ventilation. Ventilation should come from planned openings, systems and daily use, rather than random faults in old frames.
PU foam is useful for filling a regular gap once the window has been correctly plumbed, levelled and fixed. It can improve the thermal and acoustic fill of the joint, but it should not be treated as an exposed finish or as the only barrier against rain and ultraviolet light. Left visible, it deteriorates; applied excessively, it can press on a light frame and affect the operation of the sashes.
Ask for foam to be applied after permanent packers and fixing points have been checked. Packers are not optional: they carry the weight of the assembly and prevent the foam from acting as a structural component. Excess can then be trimmed without tearing away useful material from the joint.
This is a common approach for sheltered internal reveals when it is paired with compatible sealing and finishing. On jambs exposed to driving rain and wind, foam on its own assigns too much responsibility to a material that is not designed to remain exposed.
| Material | Where it helps | Limit to check |
|---|---|---|
| PU foam | Thermal and acoustic filling of the gap | It does not replace external sealing or packers |
| Expanding tape | Elastic sealing of joints with a defined width | It needs the correct product and joint size |
| Mortar | Making good and finishing the opening | It must not lock the frame rigidly in place |
Pre-compressed expanding tapes and airtightness tapes are especially useful where the joint needs to stay elastic, continuous and inspectable, particularly around junctions exposed to rain or movement between materials. They cannot be chosen by eye: the product’s expansion range has to match the actual joint width, measured at several points around the opening.
An external tape should direct water outwards and suit the planned exposure; internally, the airtight layer needs to remain continuous at corners, laps and the sill. If tape is bonded onto dusty, damp or highly uneven masonry, the system has failed before plaster is applied.
Ask the installer to show how the four corners and the lower edge will be treated. These are where improvised cuts, discontinuities and excess filler usually appear. Training for efficient-window installers explicitly covers on-site installation, packing, hardware adjustment and sealing; these are execution tasks, not decorative extras. Consult the ADENE CLASSE+ installer directory when checking the installation team.

Mortar is used to make good jambs, sills and heads, correct irregularities and prepare the finish. Trouble starts when it is pushed directly against the frame without an elastic joint or reveal profile. Masonry, render, aluminium, PVC and timber move differently with temperature and moisture; the crack often appears along the most visible line, beside the new window.
In older Lisbon walls, openings may contain broken corners, thick plaster or irregular stone concealed by layers of paint. Before ordering frames, it can be worth opening a small diagnostic area or measuring the opening after loose trims have been removed. This avoids undersized frames, excessive filling and improvised sills.
Also agree who delivers the final finish. The window crew may seal the joint, while a plasterer or painter closes the reveal. Without that division stated in writing, the joint is often left for the next trade and receives a rushed solution.
The bottom edge of a window needs its own check. Outside, water must be able to drain away rather than sit against the frame; inside, the reveal must not create a cold bridge or a hidden gap below a new stone, timber or composite sill. Confirm falls, drip details and the continuity of the seal before the final finish is fitted.
Shutter boxes are another critical point. Portuguese technical rules distinguish lower and higher permeability situations and explicitly refer to communication between the box and the interior, as well as to suitable compression seals at joints. Read the official Portuguese guidance on assessing shutter-box permeability, then require future access to the cover, axle and motor.
If the work includes internal insulation, coordinate window position, insulation thickness and jamb detail before walls are closed. The insulation data-sheet guide helps compare the material; the construction detail determines whether that insulation reaches the opening properly.
Request a quotation that identifies the frame, glazing, fixings, packers, joint solution, seals, plaster and paint reveals, plus reinstatement of sills, shutters and trims. “Installation included” does not show whether a durable reveal has been allowed for.
To reduce heat loss, ADENE advises treating gaps, cracks and draughts around doors and windows while maintaining efficient ventilation of rooms. See the ADENE home comfort and energy-efficiency action plan. For clearer pricing between contractors, use a finish schedule before requesting quotes and list window reveals as a separate item.
Call a qualified professional where there are structural cracks, persistent façade leaks, loose stone, severely distorted openings or a need to alter the opening size. In these cases, changing the window alone may conceal the issue only briefly.
Key takeaways
If you are replacing windows as part of a renovation, send Obra Lisboa photographs of the openings, the façade orientation and the finishes you want. This allows the proposal to separate the frames, reveals and reinstatement work before the project starts.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.