A safe staircase depends mainly on predictable steps: the same riser, the same tread, a landing that lets people regain balance and a handrail that is easy to grip. During a renovation, attention often goes first to finishes or to the floor area taken up by the stairs; yet changing one step, partly enclosing a landing or adding a thicker floor finish can alter the way people use the staircase every day. Confirm the geometry before ordering stone, timber or a metal structure.
Contents
The riser is the vertical height from one step to the next; the tread is the usable depth where the foot lands. They work together. A high riser needs more effort and gives less control on the way down; a short tread gives too little support, especially when someone is carrying bags or wearing outdoor shoes.
Portugal’s technical accessibility standards for accessible routes specify stairs with a tread of at least 0.28 m and a riser no higher than 0.18 m, as well as consistent dimensions throughout each flight. They also use the relationship between two riser heights and one tread as a check that the step proportions are coherent. Read Decree-Law 163/2006 and its technical accessibility standards for the full framework.
These figures do not replace a design assessment where stairs are existing, protected or structurally constrained. They are, however, a useful early warning: steps that are too steep, inconsistent depths or a new finish that takes too much away from the tread.
| Element | What it affects | Common mistake |
|---|---|---|
| Riser | Effort when climbing and control when descending | Increasing its height with a new floor finish without recalculating every step |
| Tread | Foot support area | Choosing short steps to save floor area |
| Landing | Resting, turning and evacuation | Using it for storage or as an extension of a room |
When people climb stairs, the body quickly establishes a rhythm. The foot anticipates the next height before the person consciously sees it. When the first or last step is higher, lower or shallower, that automatic movement fails. That is why a seemingly minor alteration deserves attention.
In an older Lisbon home, the issue often appears after timber is laid over stone, tile is laid over tile, or a levelling layer is added at the top or bottom of the stairs. If the upper floor rises by 15 mm, the final riser no longer matches the others. If the lower floor receives a thicker finish, the first one changes. The answer is not to disguise the difference with a trim: review the full sequence of heights before work starts.
For evacuation stairs, Portugal’s fire-safety regulation requires steps with the same profile in each flight, apart from the first step, and sets a range of three to 25 steps per flight. See the technical regulation on fire safety in buildings to understand when those requirements directly shape a project.
Also avoid adding profiles, strips or trims that project into the walking area. A durable finish does not make up for an edge that catches the toe of a shoe.
A landing is not wasted space. It breaks up a long route, manages a change of direction, gives room to open a door without stepping onto stairs and creates a clearer area during evacuation. In an apartment building, it also prevents someone carrying shopping, a pram or materials from having to stop halfway up a flight.
In a new build or a larger intervention, landing depth should be considered alongside usable stair width, nearby doors and accessibility. In the cases covered by the accessibility standards, upper and lower landings need a minimum depth of 1.20 m in the direction of travel. Do not turn that area into a cupboard, worktop or plant stand.
Check headroom above the walking line as well. A staircase may fit on the plan while still forcing a tall person to duck under a beam, services box or slab edge. This check matters particularly when creating stairs to an attic or mezzanine.
In an older building, the shared staircase is also part of the maintenance plan. For decisions affecting common areas, read our guide to maintenance planning for older Lisbon buildings.

On a curved staircase, tread depth changes from the inner edge to the outer edge. People tend to follow a walking line, rather than use the narrow point by the centre. A winder staircase should therefore never be designed only from its outline on a floor plan.
For evacuation routes, the technical regulation requires a constant slope and measures minimum tread depth 0.60 m from the inner edge; along that line, the tread must be at least 0.28 m deep. The rule expresses a useful principle for any domestic project: draw and test the part where feet will actually travel, rather than only the widest edge of each step.
Avoid tightly triangular steps, particularly at the bottom of a flight where people first read the staircase. If the available area forces cramped geometry, compare other options: move a lightweight partition, reduce a cupboard, create an intermediate landing or study a different stair position. A few extra centimetres in a bedroom rarely justify an awkward route for decades.
A handrail should follow the route continuously, be comfortable to hold and sit where the hand naturally looks for it. On stairs covered by the accessibility standards, handrails are required on both sides for changes in level greater than 0.40 m; the stated height is between 0.85 m and 0.90 m. In existing buildings, the solution needs to work with available width, walls, guards and heritage value.
Lighting should reveal the edge of every step without glare. Poorly placed grazing light can cast hard shadows and make it look as though a step exists where it does not. Aim for even light at the start, end and landings; also confirm that switches and sensors are reachable before the first step.
Visual contrast helps when stone, timber or carpet makes the edges hard to read. Anti-slip strips, meanwhile, should be selected for the material’s real performance rather than colour alone. On external stairs, water, algae and wear quickly change grip; if that is the problem, start with our guide to cleaning algae from steps and patios while addressing drainage.
Start by measuring, photographing and drawing the staircase as it is. Record every riser, every tread, usable width, headroom, door positions, wall type and floor finishes. That baseline prevents decisions based only on an inspiration image.
In Lisbon, alteration, extension and construction work can require a licence or another formal procedure, depending on the intervention. The city council sets out the framework and related requirements on its page for building works subject to licensing. Do not treat a stair alteration as simple joinery when it affects stability, evacuation or common parts.
Key takeaways
If the staircase is part of a Lisbon renovation, include measurements, final finishes and decisions about guards in the initial survey. Obra Lisboa can help organise that scope before you request renovation proposals.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.