Thermostat settings and schedules for a Lisbon flat

Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Discreet thermostat in a Lisbon flat living room with natural winter light.

A thermostat should follow the times when the home is occupied rather than hold one fixed temperature all day. In a Lisbon flat, comfort depends on combining a moderate setpoint with realistic schedules, well-used shutters and sensible use of internal doors. ADENE suggests 18–19°C in winter and 25–26°C in summer as starting points for heating and cooling; before changing equipment, check where the sensor reads, which room it actually controls and how the home responds to sun.

Contents

  1. What temperature makes sense at home?
  2. Where should the thermostat be located?
  3. How to programme a working day without conditioning an empty home
  4. In winter: heat by zones without sealing the home from fresh air
  5. In summer: programme shading before relying on air conditioning
  6. When the issue is no longer a programming problem

What temperature makes sense at home?

No single setting suits an entire home, a small child, an older person and a home office used for only a few hours. Even so, starting with moderate settings stops the controller becoming a constant attempt to chase comfort. The ADENE energy-saving guide gives 18–19°C for heating and 25–26°C for cooling. DGS advises keeping the home between 19°C and 22°C during cold periods, with a visible thermometer to confirm the actual temperature.

Use those figures as a starting point for several days before changing the controls again. If a living room feels cold at 19°C, first look for the local cause: a draught by the window, a sofa against an outside wall, a cold floor or warm air blocked by curtains. Repeatedly raising the setpoint can hide a local defect and increase energy use.

  • Choose an occupied temperature for the living or working area.
  • Set a lower temperature for predictable absences instead of switching on and off at random.
  • In summer, avoid demanding excessive cooling; sharp changes between outdoors and indoors also reduce comfort.

Where should the thermostat be located?

A thermostat measures the air around it, not the average temperature of the flat. If it sits on a sunlit wall, near the kitchen, behind a curtain, above a radiator or in a doorway draught, the system receives a misleading reading. The usual result is an overheated living room, a cold bedroom or short, noisy equipment cycles.

Choose an internal wall in a representative part of the main room, away from direct sun and heat sources. In homes with room-by-room air conditioning, check whether the control is reading close to the indoor unit: that measurement may not reflect the sofa, desk or bed. A simple thermometer temporarily placed in those areas can reveal the difference without replacing the installed control.

This check matters in Lisbon buildings with strong orientation effects. The Lisbon/Tapada climate normal records an average August maximum of 29.0°C and 36.8 days per year with maximum temperatures of at least 30°C. Use the IPMA Lisbon/Tapada climate normal to put the solar exposure of your home into context through the year.

How to programme a working day without conditioning an empty home

Start by mapping the day as it really happens. If everyone leaves at 8:30am and returns at 6:30pm, there is little sense in holding the living room at its occupied temperature from morning through late afternoon. Programme the rise or drop to finish shortly before use, allowing for the way the building responds. An older, heavy and poorly insulated home may need more lead time; a small bedroom with a heat pump can respond quickly.

  1. For one week, note wake-up, departure, return and bedtime.
  2. Create two occupied periods on weekdays: morning and late afternoon/evening.
  3. Use a moderate setback during empty hours; avoid extremes that force rapid recovery.
  4. Review after three or four days, rather than after one unusual afternoon.

ADENE’s rule of conditioning only occupied spaces is particularly useful in two- and three-bedroom flats: close doors to unused bedrooms while heating or cooling the living area, provided this does not prevent needed ventilation or interfere with combustion appliances. Before raising the setpoint, also review the insulation data sheet if you are considering work to walls, roofs or ceilings.

Lisbon flat bedroom at dusk with shutters partly lowered for summer comfort.

In winter: heat by zones without sealing the home from fresh air

A closed internal door can concentrate heat in the room in use, but it does not solve damp, condensation or stale air. The DGS cold-weather guidance recommends airing the home and maintaining good air circulation while avoiding persistent cold draughts. Open windows briefly during the milder part of the day; ADENE suggests short winter ventilation during the warmest hours.

Avoid turning a bedroom into a sealed box for weeks. Morning condensation on glazing, a stale smell or mould behind furniture are not solved simply by turning up the heating. Move furniture away from outside walls, check for water ingress and make sure air can enter bedrooms and leave through kitchens and bathrooms. In the kitchen, proper use of extraction reduces vapour that would otherwise travel through the flat; see Cooking Without Condensation for a practical routine.

Never use an oven, gas hob or charcoal brazier as a heating solution. DGS specifically advises against these practices and recommends checking heating equipment before winter.

In summer: programme shading before relying on air conditioning

In Lisbon, controlling afternoon sun is often more useful than immediately lowering the thermostat by several degrees. Close shutters, exterior blinds or external curtains before direct radiation enters; then use air conditioning to maintain conditions rather than recover a room that has already overheated. The DGS heat guidance recommends keeping heat from entering the home and creating cross-breezes at dusk when the outside is cooler than indoors.

For a west-facing living room, try this sequence: shade before the afternoon, adjust internal doors so heat does not move into cooler bedrooms, ventilate when the street cools and condition only the occupied room. A fan improves thermal sensation by moving air, but it does not lower air temperature; turn it off when nobody is in the space.

If your shutters are motorised, it is worth setting schedules by orientation instead of applying one rule to every window. Automating Blinds in a Lisbon Flat explains how to turn this routine into a renovation decision with wiring, controls and maintenance considered.

When the issue is no longer a programming problem

Call a qualified technician when equipment cannot hold its set temperature, makes unusual noise, leaks water, trips electrical protection or shows signs of faulty combustion. A room that always remains too cold or too hot despite sensible schedules also needs investigation, especially where there are stains, mould, draughty frames or major differences between wall and centre-of-room temperatures.

Do not compensate for poor insulation, a thermal bridge or incorrectly sized equipment by pushing settings ever further. During renovation, record each room’s orientation, actual use and furniture position before deciding where to place units, sockets, shutters and sensors. That prevents a control from being installed in a location that stops making sense as soon as the living-room layout changes.

The useful next step is straightforward: measure temperatures in two home zones for one week, change one schedule at a time and record the result. If the work will include insulation, heating or cooling, or electrical alterations, take that record to the building team so the solution can be coordinated.

Key takeaways

  • Use 18–19°C in winter and 25–26°C in summer as initial references, then adjust for how the home is used and who lives there.
  • Programme occupied periods and a moderate setback for absences instead of conditioning every room continuously.
  • Check the thermostat location before blaming the equipment or increasing the set temperature.
  • In summer, close shading before sun reaches the room and ventilate when outdoor air becomes cooler.

If your renovation needs provision for sensors, controls, shutters, circuits and heating or cooling equipment, include those decisions at the start of the project. Speak with Obra Lisboa about the renovation scope and the real comfort needs of your home.

Sources and further reading

Editorial image; it does not depict an Obra Lisboa project.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together