
Remove old wallpaper in small sections, use only enough moisture to release the adhesive, and stop as soon as plaster begins to come away with the covering. In older Lisbon flats, rushing this job often turns a decorating task into wall repair: scraper marks, layers of stuck paper and loose patches that only show up once paint is applied. The aim is not to expose every wall in one afternoon; it is to identify the surface, remove the covering without soaking it and create a stable base before choosing a colour.
Contents
Begin in an inconspicuous corner, beside a window reveal or behind furniture. Lift a 5 to 10 cm flap with a wide plastic scraper. If the paper comes away in a sheet and the wall remains firm, the job is likely straightforward. If you find a brown paper backing, peeling paint or crumbly plaster, work more slowly and allow for local repairs.
Switch off the room circuit before working near sockets and switches. Remove faceplates only if you can safely refit them; otherwise, protect them with painter’s tape and work around them. Cover the floor, move furniture away and keep bags ready for waste. Do not sand or scrape an older wall aggressively before checking for cracks, damp or loose paint underneath.
Open windows to renew the air, while avoiding a strong draught that dries the water before it can work. The Portuguese health authority recommends daily home ventilation, including during DIY work involving paints and varnishes; the same routine is useful when using removers or new adhesives.
Three situations are common. With washable or vinyl wallpaper, the decorative layer may peel away first, leaving a paper backing bonded to the wall. Remove that dry film, then dampen the backing. With ordinary paper, warm water applied with a sponge or spray bottle will often soften the adhesive. With very old wallpaper, several coats of paint above it or stubborn glues, test a small area before buying any specialist product.
Dampen a small section, wait a few minutes and scrape with the blade almost parallel to the wall. If water is running to the skirting board, you are using too much. If the paper remains hard, make very shallow scores in the covering layer only; do not cut into the plaster. A steamer can help on difficult areas, but it is not an automatic answer: prolonged steam can soften degraded backgrounds and open existing cracks.
Do not mix detergents, bleach or other chemicals to make the water “stronger”. The DGS guidance on household chemical safety says to read labels, keep every product in its original packaging and avoid mixing cleaning products.
Do not try to hide adhesive residue under a heavy coat of paint. Paint can look even while wet, then reveal shiny bands, poor adhesion or small bubbles after drying. A clean, dry surface lets you decide whether primer is enough or whether repairs are needed.

Once dry, run your palm across the wall and inspect it with a portable light held at an angle. This reveals paper edges, scraper hollows and areas where the plaster sounds hollow or breaks down. Remove only what is loose. For shallow scratches and small defects, apply filler in thin layers, let it dry as directed on the pack and sand with light pressure. Vacuum the dust and wipe with a slightly damp cloth before priming.
A crack that reopens, a stain that returns, white salt deposits or a wall that feels damp is not solved with filler and paint. Pause the finish and investigate the cause: external water ingress, a leak, condensation or an incompatible earlier repair. Covering the sign makes the next intervention harder.
When choosing colour, test it on cards or prepared areas and look at it in morning light, afternoon light and artificial light. This works alongside Obra Lisboa’s guide to testing paint samples in a living room and prevents a decision based solely on a tin or photograph.
Primer does not replace cleaning and cannot stabilise a wall that is failing. Use it where the background has become highly absorbent, where filler repairs are present or where old and new areas have visibly different textures. Choose the system specified by the paint manufacturer and respect drying times. Do not seal off a freshly painted room to make it “dry faster”: air movement helps disperse odours and moisture.
Paints and varnishes can release volatile organic compounds. The Portuguese legal text on volatile organic compounds in paints and varnishes defines, among other terms, VOC content in grams per litre. At home, compare the label information, follow the technical sheet and keep children, pets and sensitive people away until the room is dry and thoroughly aired.
Do not use candles, fireplaces, cigarettes or any flame near solvents, removers and paints. Store products closed and dispose of waste as the packaging specifies. Proper wall preparation reduces corrective coats and shortens the final clean-up.
Call for help when wallpaper is attached to plaster that comes away in sheets, when there is persistent damp, widespread mould, wide cracks or a wall that moves when touched. It is also unwise to dismantle sockets, cut into old finishes or use strong stripping agents without confirming the substrate and ventilation conditions.
For a larger renovation, record areas with defects before setting the painting scope. It helps to establish who repairs the substrate, who applies primer and which finish is expected; this prevents incomplete preparation being labelled later as a “paint defect”. To organise materials and finish choices before requesting prices, see our finish schedule before a renovation quote.
If the wall passes the firmness check, is dry and has no sticky residue, you can paint with confidence. The right time to move on is after preparation, never before it.
Key takeaways
If this wall is part of a wider renovation, collect photographs of damaged areas and paint choices before requesting a proposal. Obra Lisboa can help structure the work scope and finishes around clear decisions from the start.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.