
To make a living room sound less bare and tiring, start by adding absorbent and irregular surfaces where they matter: a rug, curtains, upholstered seating and a filled bookcase. This reduces reverberation inside the room; it does not insulate the home from traffic, building work or the flat next door. Telling these problems apart stops you buying decorative panels or heavy curtains when the sound is actually entering through a shutter box, poorly sealed window or shared wall.
Contents
Try a simple test before changing the décor. Speak at a normal level, clap once, or play music quietly. If sound seems to linger, conversations become unclear when several people are present, or the television needs more volume in a sparsely furnished room, the main issue is reverberation. That is where fabric, books and furniture can help.
If you hear conversations, dragged chairs, bass, buses or building work even when the room is furnished, you are dealing with sound transmission. A rug can make the room more comfortable for the people in it, but it will not turn a lightweight wall into an acoustic wall. Lisbon’s master plan classifies the municipal territory as a mixed zone and provides for the identification of acoustic conflict areas; this is a useful reminder that outdoor exposure cannot be solved through decoration alone. Consult the Lisbon Municipal Master Plan before drawing conclusions about a more substantial intervention.
This distinction also guides renovation decisions. To improve noise between flats, assess the wall, ceiling, floor, doors and service penetrations together; do not hide the diagnosis behind a decorative feature wall.
| Problem | Useful first intervention | Important limit |
|---|---|---|
| Echo and harsh speech in a sparsely furnished room | Rug, curtains, sofa and a filled bookcase | Does not block noise coming from outdoors |
| Conversations audible through a wall | Assess the wall, outlets and service penetrations | More decoration has very little effect on transmission |
| Footstep noise through the ceiling | Assess the source and the floor above | Rugs below only soften the internal atmosphere |
A rug is usually the largest absorbent surface in a living room. It works best when it covers the conversation area rather than sitting as a small isolated island in the centre. In a Lisbon one-bedroom flat, try placing at least the front legs of the sofa and chairs on the rug; the layout feels less fragmented and creates one continuous area that absorbs part of the floor reflection.
Choose thickness and weave for the way the household actually lives. Wool, denser cotton and recycled fibres can make the room sound less hard; a very thin rug over tile will still leave a great deal of reflection. In homes with pets, children or meals in the living room, ease of cleaning matters as much as appearance. Avoid loose rugs near the entrance to the room, sliding doors or the route between the sofa and balcony.
Do not try to compensate for a rug that is too small by scattering several pieces around. Two zones can work in a long room — for instance, sitting and dining — provided a clear route remains. For sizing, placement and clearance without squeezing circulation, compare the logic with this guide to shelving in a narrow hallway: protect the daily route before filling the room.
Fabric curtains with fullness, hung from the ceiling to close to the floor, help soften reflections from glass and adjacent walls. They do not need to be blackout curtains to do this. In a south- or west-facing room, a combination of a light curtain and a blackout solution can manage glare, privacy and comfort without turning the window into a heavy visual block.
Let the curtains stack beyond the window opening whenever the wall width allows it. You can then open the window fully and make better use of daylight. Do not press fabric against radiators, cover permanent grilles or use curtains as a response to condensation or odours. Portugal’s Directorate-General of Health recommends ventilating a home for at least ten minutes a day, and during activities that release moisture, such as cooking, washing, drying clothes and bathing; see the DGS general indoor-air recommendations.
At a window facing a noisy street, curtains improve visual comfort and reduce some harshness inside the room, but they do not replace well-adjusted frames, seals and a solution designed for the opening. If outdoor speech remains intelligible with the windows closed, locate the sound path before ordering heavier fabric.

A bookcase with books, boxes and objects at different depths breaks up reflections more effectively than a smooth wall. The effect comes from irregularity and distributed mass, not from filling every shelf. A low unit behind a sofa can organise books and create support for lamps; a taller one on a side wall can reduce the empty feel of a rectangular room.
Arrange it to be used. Upright books mixed with a few horizontal stacks, closed baskets for cables and games, and deliberate empty spaces avoid the look of a storage room. Hard objects such as glass and ceramics can sit in small groups; if the whole bookcase consists of hard, smooth surfaces, the acoustic benefit is smaller.
Do not fix tall furniture without understanding what is behind the finish, especially in older buildings. Tabique walls, damaged plaster or masonry with weak areas require confirmation of the substrate and fixing method. If the shelving also divides a room, preserve daylight and circulation: an open unit can define a zone without completely closing the view and airflow.
Where the aim is privacy between rooms, shelving improves how the space reads, but it does not provide reliable sound insulation. For that, plan a construction solution rather than a pretend wall made of books.
An upholstered sofa, chairs with soft seats and cushions reduce the hardness of a room dominated by tile, stone, glass and painted walls. Instead of buying many small cushions, favour seating that answers a real need: a reading chair near an outlet, an upholstered bench by the table, or a sofa with a depth that suits the room.
Spread soft materials around the sides of the room, rather than collecting them in one corner. A common arrangement works well: a rug in the centre, sofa along one wall, curtains at the glazed façade, and shelving or a sideboard on the opposite wall. Sound meets fewer pairs of parallel, smooth surfaces, while the room feels more settled.
Avoid pushing every item against the walls simply to create an empty centre. In a small living room, moving the sofa a few centimetres towards the rug and side table can form a clearer conversation zone without cutting circulation. The same care matters with a dining table: chairs scraping on tile create repeated noise, so suitable pads on chair legs are worthwhile, and the table should open without colliding with the route through the room.
Low-emission materials and sensible cleaning also matter. DGS notes that furniture, paints, varnishes, cleaning products, curtains and carpets can contribute to indoor pollutants; air the room after bringing in new items and do not mask a persistent smell with fragrance. Read the DGS page on indoor air quality.
Do not buy everything at once. The best sequence lets you hear the difference and prevents a small room becoming overfilled.
After each step, listen to the room under normal conditions: a call, dinner with friends, television and open doors. Do not judge it only by clapping, which exaggerates the effect compared with daily use.
Bring in technical help when the nuisance comes from vibration, continuous equipment noise, cracks beside a shared wall, water ingress, or a need to open up a wall. If the renovation includes changes to partitions or finishes intended to improve acoustics, state the problem and expected result in the quote request. A clear scope avoids decorative products being sold as insulation.
If you are reviewing the living room and circulation areas within the same renovation, Obra Lisboa can help turn layout, finish and services decisions into a comparable tender request through a bill of quantities for comparable renovation quotes.
Key takeaways
If the living room is part of a renovation, gather dimensions, photos and the decisions already made. Obra Lisboa can help turn them into a clear, comparable scope before you request quotes.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.