
To heat a Lisbon apartment more effectively, organise it by use zones: regulate the living room, keep bedrooms at a steady temperature, and do not hide radiators behind curtains or furniture. One poorly placed thermostat can make a boiler or heat pump run longer than needed while an outer room remains cold. Before replacing equipment, sort out the controls, airflow routes and daily routine.
Contents
In a radiator system, the thermostat measures only the place where it is installed. If it sits in a cold hallway, beside the entrance door or near a draughty window, it may call for too much heat. If it is in a living room with late-afternoon sun, it may stop heating too soon and leave the bedrooms uncomfortable.
Choose the room that best represents the period when the home is most used. In many flats this will be the living room; in others, a central circulation area without direct sun can give a more balanced reading. Avoid positions behind curtains, close to heat sources, above a radiator or on a very cold external wall.
Portugal’s health authority, DGS, advises keeping homes between 19 °C and 22 °C in winter and having a visible thermometer. The right temperature depends on occupants, clothing and activity, but measuring before changing settings prevents decisions based on a passing feeling. See the DGS guidance for cold weather at home.
A thermostatic radiator valve does not replace the main thermostat. The valve limits heat in that individual room; the thermostat decides when the heat generator stops running. Together, they allow the living room to remain the reference zone while bedrooms, a study or a corridor do not receive more heat than they need.
Use the valve to correct persistent differences, rather than as a daily on-off switch. If a bedroom becomes too warm because it gets morning sun, turn the valve down slightly. If the living room contains the thermostat, do not completely close the radiators in that room: the system loses its reference and may run unevenly.
In a flat with a boiler or heat pump feeding radiators, also check for air in the circuit, radiators that are cold at the top, or stuck valves. Programming alone will not solve those faults.
| Element | Decision it makes | Common mistake |
|---|---|---|
| Room thermostat | Starts, reduces or stops the system based on the reference-zone temperature | Putting it by sun, draughts or a radiator |
| Thermostatic valve | Limits heat from each radiator | Closing every valve in the thermostat room |
| Timed programme | Matches operation to occupied periods | Creating large temperature swings without testing the home’s response |
You do not need to turn every room into an independent zone. Begin with three uses: living area, bedrooms and lightly used spaces. The living room usually needs comfort in the late afternoon and evening; bedrooms benefit from a lower, steadier temperature; an internal store room or hallway does not need the same priority.
Closing doors to unheated rooms can focus warmth where it is being used. However, do not turn an external bedroom into a permanently cold, sealed compartment: cold walls, little air renewal and laundry drying can encourage condensation. ADENE’s action plan includes closing doors to rooms without heating as a simple heating measure; apply it while monitoring humidity and wall condition. See the ADENE action plan.
In a typical two-bedroom flat, a sensible routine is to heat the living room when occupied, avoid overheating bedrooms, and make sure the bathroom dries after showers. If a child’s room or a room used by a vulnerable person is occupied during the day, it is no longer a secondary zone.

Programme heating to reach comfort close to the time you need it, instead of leaving it at maximum continuously. The lead time depends on the building: a flat with heavy walls and good airtightness responds differently from a top-floor home with old windows or strong wind exposure.
Technical rules for HVAC controls provide for control by room or group of rooms and for programmed operating times where such control systems are fitted. For a renovation, that is a useful design principle: ask which room controls the system, which emitters belong to each zone and where schedules can be adjusted. Read the framework on control, regulation and monitoring.
Turning heating down heavily while keeping windows closed all the time may reduce apparent energy use, but it can raise the risk of cold surfaces and trapped moisture. The aim is a stable home with brief, effective air renewal, especially after cooking, showering or drying laundry indoors.
Open to renew indoor air when outdoor conditions allow it, without leaving the system to heat an open window for hours. If you live on a busy street or during an outdoor-air pollution episode, adjust the timing and duration of ventilation. See how to manage that choice in our guide to poor outdoor air and home ventilation.
Watch for specific signs: water droplets on glazing in the morning, a stale bedroom smell, mould behind furniture against an external wall, or peeling paint. Cleaning mould deals only with the visible part; the cause may be condensation, water ingress or both. For safer surface cleaning and steps to stop recurrence, see this guide to mould on painted walls.
DGS identifies reducing direct solar gain, natural night cooling and efficient use of climate-control systems as thermal-comfort strategies. The same logic applies year-round: manage the sun, ventilate at the right moment, and do not ask heating to compensate for a weak building envelope. Read the DGS thermal-comfort reference.
If walls will be opened or the system replaced, decide on controls before finishes are chosen. Mark the thermostat position, radiators or other emitters, required electrical points, pipe routes and equipment location on the design. Do not leave the control location until the end: a clear wall can end up behind a cupboard or exposed to direct sun.
Ask the installer to confirm compatibility between the heat generator, emitters and controls. This matters particularly when replacing a boiler with a heat pump, adding rooms or aiming to control temperatures by zone. Ask for simple instructions too: how to change schedules, how to recognise a fault and what periodic maintenance is needed.
Call a qualified professional if there is a gas smell, leaks, abnormal pressure, electrical faults, new equipment noise, radiators that remain cold after bleeding, or persistent damp beside cold walls. For construction details that reduce draughts around frames, also see how to choose window-reveal finishes.
Key takeaways
If your renovation includes heating, windows or changes to room layout, add a simple zones-and-controls plan to the quotation request. Obra Lisboa can help turn those choices into a clear scope of works before equipment is ordered.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.