Replacing a building’s letterboxes should start with their location, who can reach them and what the work changes at the entrance or on the façade. A new bank of boxes may look like a simple purchase, yet it affects a common part, can require drilling, power for an intercom or access control, and may expose fragile walls or stonework in older buildings. Before requesting prices, the condominium should agree one solution, record it in the minutes and check whether the work extends into the street.
Contents
In a building under horizontal property, the entrance wall, common hall, shared door and façade do not belong to one flat alone. Replacing damaged boxes with like-for-like units may be routine maintenance; moving them, recessing them into a wall, taking up more wall area or changing the elevation calls for a clear collective decision.
Start with the deed of horizontal property, the condominium rules and recent minutes. Check whether there is an administration box, whether flats have stable identifiers and whether shops, storage units or separate doors also receive post. Postal rules provide for an individual receptacle for each autonomous unit and one for the building administration where that entity is legally required, as well as clear identification of each box. Read the Postal Receptacles Regulation and its 1998 amendment.
A letterbox is not simply decorative hardware. Ordinary mail is deemed delivered once placed in it; a poorly closing door, an oversized slot or confusing labels create practical failures that appearance alone cannot solve.
The right location allows regular delivery, protects mail from rain and does not make circulation worse. In buildings with direct street access, a bank beside the main entrance can work well if it does not interfere with handles, intercoms, bells or the opening of the door leaf. In a recessed building, the gate or boundary wall may be more suitable, provided it does not become an obstruction on the pavement.
The regulation gives preference to the main door or an adjacent exterior wall; where that is not feasible, it allows placement in the hall provided it is visible and readily accessible to delivery staff. It also sets useful product-selection criteria: robust material, individual locks, adequate capacity, a horizontal slot and protection against mail being removed through it. For exterior banks, ask the supplier for a data sheet covering dimensions, fixing method, corrosion protection and drainage.
If the work is also changing the entrance door, coordinate the boxes early with interior doors and the home’s ventilation route, so that new grilles, cupboards or partitions do not later complicate the hall.
| Location | Main benefit | Check before approval |
|---|---|---|
| Beside the exterior entrance | Delivery without access to the interior | Façade, rain, fixings and pavement circulation |
| Integrated into a gate or boundary wall | Useful for a recessed building | Gate operation, drainage and identification |
| Common entrance hall | Better weather protection | Delivery access and clear passage width |
Ask suppliers to price the same defined solution. Without a short scope document, one company may quote painted steel boxes and another stainless steel, while one includes removal and wall repairs and the other only screws the new bank in place.
In an older building, do not accept that every drill hole is harmless. Render may be hollow, joints may be weak, stone may be decorative and services may be concealed. A technical visit before appointment helps avoid improvised fixings or a misaligned bank used to disguise an uneven wall. Where this is part of a wider renovation, a renovation responsibility matrix helps establish who chooses the product, approves the cost and signs off the wall before drilling.

The minutes do not need to reproduce a catalogue, but they should allow the decision to be carried out without reopening the essential discussion. Identify the precise area, number of boxes, selected model or minimum criteria, approved quotation or spending cap, cost allocation and the authority given to the administrator to appoint the contractor.
A useful wording can state: “approve replacement of the existing letterbox bank in the entrance hall with a metal set with individual locks, flat identification and repair of the backing surface, at the location shown in the attached proposal.” Attach the quotation or an identified image to the minutes. If there are two possible positions, vote on them separately; do not leave that decision until after appointment.
Where work affecting a façade or other common parts forms part of a planning application, Lisbon requests the condominium’s authorising minutes among the submission documents. Check the Lisbon municipal document list for renovation works before assuming verbal approval is enough. In listed buildings, areas with specific controls, or where stonework, openings or cladding are altered, obtain technical and municipal confirmation before ordering bespoke items.
A straightforward internal replacement that does not alter the façade or use the street is usually a limited intervention. The situation changes if scaffolding, a lifting platform, barriers, a skip or a reserved area for loading and deliveries is needed. Even works exempt from prior planning control may require a street-occupation notice or licence.
Lisbon City Council explains that an occupation plan must show the pedestrian route, barriers, support areas, materials, equipment and temporary signage. An information board is mandatory for street occupation in the applicable cases. Confirm the procedure on the municipal page for street occupation for exempt works.
Do not confuse a residential delivery box with a CTT street letterbox for posting mail. They are different items with different functions. Nor should a small job be treated carelessly because it is small: a new metal plate over tile, a projecting box on a narrow doorway or a hole drilled into stone can have an outsized effect.
Schedule installation for a morning when the administrator or a nominated owner can inspect the work. Before removal, photograph the old set, prepare a list of units and test which doors open. Arrange a temporary system for urgent notices: place a notice outside and state where keys will be handed over.
At handover, check four points on site:
Keep the invoice, instructions, key handover record and final photographs in the condominium file. If the building is already working on its entrance, use the opportunity to review other common elements before work areas are closed, including wall protection, lighting and conservation of older features. For a building with defects and several pending decisions, see the guide to an old building maintenance plan.
Key takeaways
If replacing letterboxes forms part of an entrance renovation, speak with Obra Lisboa to define the scope, coordinate fixings and finishes, and prepare a clear works proposal for the condominium.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.