
A greywater system works only when it is designed as a separate network for non-potable uses, with accessible collection, treatment, storage and maintenance. During a house renovation, the critical point comes before floors and walls are closed: separate shower and basin pipework, reserve technical space and decide where treated water will go. Connecting reused water to the drinking-water system, or improvising diversions after the work, creates a risk that is not worth taking.
Contents
Greywater generally means water from showers, baths and bathroom basins. It is not drinking water and must never be treated as such. Domestic reuse makes most sense for activities that do not require water suitable for drinking, food preparation or personal hygiene.
Lisbon’s Municipal Urbanisation and Building Regulation encourages greywater recycling for non-potable uses, both in common areas and through a second network in each dwelling; it also places maintenance responsibility on the system user. Check the regulation published in the Diário da República before fixing a solution in the design.
| Source | Can it enter the system? | Practical reason |
|---|---|---|
| Shower and bath | Usually yes | They provide regular flow and can suit non-potable uses after the planned treatment. |
| Bathroom basin | Usually yes | Attention is needed for products discharged and for the treatment design. |
| Toilet and bidet | No | These are blackwater sources and must follow the intended wastewater drainage route. |
| Kitchen and dishwasher | Avoid | Grease and food residues increase loading and maintenance needs. |
It is worth assessing when the work will already open bathrooms, renew waste pipework, create a plant room or alter the garden. In those circumstances, the disruption and cost of separating branches are lower than in a later retrofit.
For a Lisbon house, the system is more likely to make sense where there are several showers, a meaningful number of toilets and irrigation that can use drip lines. The water produced needs regular demand; a large tank without frequent use simply adds cleaning and monitoring responsibility.
Start with a simple diagram showing source points, equipment location, tank, overflow and end uses. Use the plumbing renovation to prepare a utility shut-off plan: accessible, labelled valves prevent maintenance on the system from shutting down the entire house.
The principle is straightforward: drinking water remains on its own network; greywater travels through dedicated collection pipework to treatment; reused water leaves through a third network serving only the specified equipment. Design, identification colours, safety devices and access points should be resolved by a qualified designer and competent installer.
A 2022 parliamentary resolution recommends that building regulations frame these systems in new construction and that non-potable solutions in home renovations may be eligible for support. It is a recommendation, not a construction design; read Resolution No. 85/2022 as context rather than as an installation specification.

Do not buy equipment before resolving the installation. The system needs, at minimum, suitable collection, filtration or treatment appropriate to the intended use, storage, pumping where required, controls, dry-run protection and maintenance access. The final arrangement depends on the house, flow volumes and destination of the water.
Reserve a ventilated location, protected from extreme temperatures and large enough to open lids, replace filters and clean the tank. A cramped exterior cupboard, space hidden behind storage or one with no safe drainage route turns simple maintenance into recurring building work.
Ask for the proposal to state in writing:
If the renovation also includes roof waterproofing, keep those circuits distinct from rainwater collection. Roof assemblies need their own decision, as explained in liquid membrane or bituminous sheet for a flat roof.
Greywater contains soaps, hair, fibres, organic matter and residues from personal-care products. A domestic system is therefore not fit-and-forget. Maintenance specified by the manufacturer and design must be manageable for the people living in the house, or arranged on a regular service basis.
Set out a written routine. Check filters and alarms; look for odours, noise and leaks; clean components at the stated intervals; confirm isolation valves operate; and keep access to the tank clear. Do not discharge paints, solvents, concentrated bleach, grease or any product excluded by the manual into fixtures connected to the system.
Portugal’s National Programme for Efficient Water Use also identifies simple household measures such as adjusting toilet flushes and selecting lower-flow devices. See the measures in the document published in the Diário da República. Efficient fixtures combined with a properly sized reuse network often reduce demand and make reuse more consistent.
Stop using the system and request a technical assessment if there is backflow, persistent odour, unexpectedly cloudy water, overflow, repeated pump failure, an unlabelled connection or any doubt about a possible link to drinking water. Do not try to solve these warning signs by adding disinfectant, randomly changing a valve or bypassing safeguards.
It is also wise to call a qualified designer or installer before adapting a finished house. Pipe routes may need opening, ventilation may need review, storage may need calculation and existing networks must be checked for compatibility. In buildings with more than one dwelling, changes to risers, shared areas or common equipment require an additional assessment.
To move forward, gather the existing services plan, number of occupants, source fixtures, toilets and irrigation area. Obra Lisboa can help turn that information into a clear renovation scope, defining technical space, access and networks before quotations are requested.
Key takeaways
If you are renovating a house and want to allow for water reuse, include pipework, technical space and access in the brief before requesting prices. Speak to Obra Lisboa to structure a renovation proposal with those technical decisions made visible from the start.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.