Condominium Works: How to Vote by Ownership Share and Record a Usable Set of Minutes

Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Condominium meeting prepared with building drawings and works documents on a table

To approve condominium works, count both owners and ownership shares, identify the applicable legal threshold, and record the scope, budget, payment method and authority to proceed in the minutes. A decision made by a simple show of hands can unravel when it is time to obtain quotes, allocate costs or sign with the contractor. Before the meeting, check the deed of horizontal property, the condominium rules and each unit’s ownership share.

Contents

  1. Why is the number of neighbours not enough?
  2. Which voting threshold may the works need?
  3. How do you prepare an agenda that can produce a decision?
  4. Notice, attendance and a second meeting: what should you check?
  5. What must the minutes say?
  6. After the vote: turn the resolution into controlled work

Why is the number of neighbours not enough?

At a condominium meeting, each owner has votes corresponding to the percentage or permillage allocated to their unit in the constitutive title. A building with eight units does not necessarily decide on a four-versus-four count: a larger unit may carry a higher ownership share. The title should identify the units and set their relative value; in Lisbon, it also helps distinguish what belongs to a private unit from what remains common property.

Ask the manager for a straightforward list before the meeting: unit, owner, ownership share, attendance or proxy, and voting position. It prevents arguments during the meeting and makes it possible to check whether the required majority was actually reached. Lisbon City Council’s page on horizontal property explains the role of autonomous units and common parts.

  • Common mistake: treating every unit vote as if it always carried equal weight.
  • Useful choice: attach the known total ownership shares and the proposed resolution to the notice.
  • Before voting: check proxies and identify representatives of estates or companies.

Which voting threshold may the works need?

The answer depends on what will be done, not on the contractor’s label for the job. Routine conservation of a common element, such as repairing a leaking roof, is not treated in the same way as an innovation, an alteration to the architectural line or a change to the constitutive title.

As a practical rule, do not write only “approve works” in the notice. Describe the solution: repair existing waterproofing, replace a shared pipe, install a lift, add a new element to the façade or change a defined use. Innovations generally require approval by a majority of owners representing two thirds of the building’s total value; the applicable rule appears in article 1425 of the Civil Code. Works that alter the architectural line or aesthetic arrangement require prior approval by a majority representing two thirds of the total value, under the legal text published in the Diário da República.

If the decision changes the constitutive title — for example, by formally redefining parts of units or the allocation of spaces — do not assume that a majority is enough. Changing the title has its own requirement for agreement from all owners. Where that doubt exists, obtain legal and technical advice before voting or ordering materials.

An initial reading of voting thresholds before putting works to a meeting
SituationControl questionPrudent next step
Conservation of a common elementIs the existing element being repaired without creating a new solution?Define the defect, solution, quote and cost allocation.
InnovationDoes the work add an installation or utility to the building?Check whether approval by owners representing two thirds of total value is required.
Façade or external appearanceDoes it alter the architectural line or aesthetic arrangement?Prepare drawings, colour, fixings and the appropriate prior vote.
Constitutive titleDoes it formally change units, parts or uses defined there?Stop and confirm whether agreement from every owner is needed.

How do you prepare an agenda that can produce a decision?

A sound meeting does not start by choosing the company. It starts with the problem and the limits of the decision. For a leaking roof, for example, the agenda item should separate diagnosis, proposed solution, access areas, protection for units, maximum value, appointment criteria and available reserve funds.

  1. Gather dated photographs, a description of the defect and, where needed, a technical report.
  2. Request comparable quotes with quantities, exclusions, programme and warranty clearly separated.
  3. State whether the meeting will approve a fixed solution or authorise the manager to choose between quotes within a cap.
  4. Set out how the cost will be collected: reserve fund, extraordinary contribution or both.
  5. Provide authority to sign a contract, coordinate works and approve only essential variations up to a defined limit.

A properly structured request reduces incomparable replies; see how to request comparable renovation quotes. If the intervention affects the façade, roof, service risers or general installations, gather the building documents before settling the solution; this guide to documents to request from the condominium is a useful starting point.

Documents and drawings prepared for a condominium works vote

Notice, attendance and a second meeting: what should you check?

The notice must give owners enough information to understand what they will be asked to approve. Do not hide significant decisions under “other business”: a cost increase, a visible façade solution or an extraordinary contribution deserves its own agenda item and documents sent in advance.

The Civil Code sets rules for notice, second meetings and communicating decisions to absent owners. The changes introduced by Law no. 8/2022 also allow notice by email for owners who previously expressed that preference at a condominium meeting, provided it was recorded in the minutes with their email address and an acknowledgement of receipt. Check the 2022 legal republication before changing the usual procedure.

In practice, bring an attendance sheet showing each participant’s ownership share. At the opening, total the share represented; before each resolution, record whether anyone arrives, leaves or abstains. An abstention should not disappear from the record, especially where the required majority depends on represented capital.

A meeting may have many people in the room and still lack the representation needed for a particular decision.

What must the minutes say?

Minutes are not a vague account of the discussion. They are the document that allows the manager to collect funds, appoint a contractor, notify absent owners and show what was approved. The law requires them to include, among other items, the date and place, owners present and absent, matters considered, decisions, the result of each vote, and confirmation that the minutes were read and approved.

For works, add operational detail:

  • the exact area and defect or objective;
  • the approved solution and supporting documents;
  • the selected quote or maximum authorised budget;
  • the voting result in owner numbers and ownership shares;
  • cost allocation, payment dates and fund to be used;
  • the manager’s specific authority;
  • conditions for additional works, suspension or a further consultation.

Resolutions become effective once the minutes are approved, and resolutions properly recorded in them bind owners and third-party holders of rights over the units, according to the republished Decree-Law no. 268/94. Avoid wording such as “whatever is necessary is approved”: it does not identify the solution, financial limit or who may decide later.

After the vote: turn the resolution into controlled work

Immediately after the meeting, send the minutes or notice of the resolution, retain the quotes and obtain the contractor’s missing information before appointment: insurance, programme, contacts, access rules, protection for the lift and common areas, waste removal and the person responsible on site. If scaffolding, a skip or public-space occupation is needed, confirm it before the start date.

Separating three decisions avoids stoppages: the meeting approves the work and the cap; the manager formalises the contract within that cap; site supervision or coordination confirms work before payment. For a clearer vote, prepare a decision pack with alternatives, costs and consequences instead of handing out loose quotes at the entrance to the meeting.

For a significant intervention, Obra Lisboa can help organise the technical scope, quote request and execution sequence before the proposal goes to the condominium meeting.

Key takeaways

  • Count ownership shares as well as the number of owners present.
  • Describe the work and intended voting threshold before issuing the meeting notice.
  • Record every voting result, financial cap and manager’s authority in the minutes.
  • Where a decision may alter the façade, use or constitutive title, confirm the legal position before appointing a contractor.

Taking a building intervention to a vote? Obra Lisboa can help turn the problem, drawings and quotes into a clear works pack for condominium discussion and responsible appointment.

Sources and further reading

Editorial image; it does not depict an Obra Lisboa project.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together