House under construction near Lisbon with building plans and project documents in the foreground.

The partial VAT repayment scheme can reduce the tax cost of a contracted permanent-home construction project, but it does not turn an existing flat renovation into an eligible project. That distinction matters before signing a contract, deciding who buys materials or relying on the repayment in your finance plan. The scheme was created by Decree-Law 97/2026 and requires a proper works contract, compliant invoices, use documentation and genuine occupation of the home.

Contents

  1. What changed in 2026 and who the scheme is for
  2. Why an ordinary renovation does not qualify
  3. Which home and occupancy conditions must be checked
  4. How to prepare the contract and invoices from day one
  5. When to apply and when the money may arrive
  6. The right decision before signing

What changed in 2026 and who the scheme is for

Decree-Law 97/2026 of 20 May created a scheme for individuals commissioning the construction of a home for their own permanent residence, outside a business or professional activity. It applies to VAT falling due up to 31 December 2032, subject to the legal conditions. The request goes to the Tax Authority after the documentation relating to the start of use has been issued; it is not a discount applied by the contractor on each payment certificate.

The repayment equals the difference between normal-rate VAT actually paid on eligible expenditure and the VAT that would have resulted from the reduced rate. That is why it is a partial repayment: the owner pays first, keeps the evidence, then applies. Read Decree-Law 97/2026 and Annex II before including any repayment in a funding plan.

For a family building a new house on a plot, the measure may be material. For someone buying a two-bedroom Lisbon flat and replacing the kitchen, services and floors, the practical answer is different: this annex was not designed for that situation.

Why an ordinary renovation does not qualify

The legal text refers to contracts for the construction of properties intended as the owner’s permanent home. It does not list internal rehabilitation works to an already occupied property as eligible expenditure under this repayment scheme. It also expressly excludes the mere purchase of materials incorporated into the build.

Buying tiles, taps or insulation directly from a retailer therefore does not, by itself, create an entitlement. The same caution applies where an owner buys most items and appoints separate trades: even where the final result is a new house, the contractual structure and paperwork are not minor administrative matters.

There are separate VAT rules for certain construction or rehabilitation contracts. Do not confuse them with this repayment. When comparing proposals, see Obra Lisboa’s guide to provisional allowances in a renovation: an uncertain tax line should never be used to make an appointment total look artificially lower.

A quick reading before you rely on the repayment
SituationPrudent reading
Construction of a permanent home under a works contractIt may qualify if all legal and value conditions are met.
Renovation of an existing flatIt should not be budgeted as benefiting from this scheme.
Materials bought directly by the ownerThe mere purchase of materials is not eligible.
Invoices for qualifying works charged at normal VATThey may form part of the application if the remaining conditions are met.

Which home and occupancy conditions must be checked

The property must meet the decree’s moderate-price concept. For this scheme, the taxable value entered in the property register or, if higher, the land price plus construction costs excluding VAT is compared with the applicable legal ceiling. Built-in furniture, fixed equipment and services that permanently add value to the property are included in construction costs.

After the documentation relating to the start of use is issued, the home must be assigned as the individual’s permanent residence within six months, evidenced by the tax address. It must remain so for at least 12 months, except for exceptional circumstances set out in the law. A house intended from the outset for sale, a second home, short-term letting or rental should not be treated as a permanent home for this purpose.

If the works require licensing, prior communication or another procedure, the Lisbon City Council page on building works licences helps distinguish the applicable planning route. Tax eligibility does not replace permissions, design, use documentation or obligations to the council.

Work table with a building contract, invoices and technical drawings for organising a residential construction project.

How to prepare the contract and invoices from day one

Do not wait until the end of the build to find that evidence is missing. Create a dedicated repayment file and treat the building contract as a control document rather than a formality.

  1. Define the subject matter: identify the plot, new home, client, contractor and contracted scope.
  2. Avoid untraceable payments: retain contracts, payment certificates, bank evidence, invoices and variations.
  3. Check invoicing: eligible VAT must appear on legally issued invoices communicated to the Tax Authority.
  4. Separate direct purchases: record them for the overall cost plan without assuming they generate repayment.
  5. Keep the whole file: the application requires invoices for all construction costs, not only the items on which repayment is expected.

Also ask for evidence that the contractor is qualified to carry out the activity. The rise in title applications during 2026 led IMPIC to state that response times were longer than before; consult IMPIC’s notice on construction qualification applications and verify the position before appointment.

When to apply and when the money may arrive

The application is electronic and must be submitted to the Tax Authority within 12 months of issue of the documentation relating to the start of use. It must identify the property and any co-owners, and include works contracts, the use title, evidence of the land value and invoices for the full construction cost.

The decree sets a maximum repayment period of 150 days from receipt of a properly completed application. That deadline is not a reason to reduce initial cash reserves: where documents are missing, the application is not properly completed. The repayment is made by bank transfer to the IBAN held by the Tax Authority.

Keep the documents for at least five years. If a condition is not met or later ceases to be met, the Tax Authority may correct the repayment within the statutory period. In the budget, treat the repayment as a conditional future receipt, never as money already available to pay the final work stage.

The right decision before signing

Ask one direct question before putting this measure into your finance plan: are you appointing a new permanent-home build that can qualify, or improving an existing home? In the second case, remove the repayment from the calculation and build the budget around actual VAT, contingency and payments. If the purchase and works depend on borrowing, start by setting a works cap before the CPCV, without treating a future repayment as guaranteed cash.

If it is a new build, ask the designer, accountant and contractor to review the framework together before appointment. Check the value ceiling, contracting model, expected invoices, planning sequence and final use. In Lisbon, a change of brief or licensing route midway through the process can alter the programme and the documents you must provide.

To keep technical and financial decisions readable, prepare a bill of quantities for comparable renovation quotes. It is equally useful on a new build: it reduces omissions and makes it easier to distinguish construction cost, direct purchases and risks retained by the owner.

Key takeaways

  • The partial repayment is for permanent-home construction, not an ordinary apartment renovation.
  • Materials bought separately by the owner are not eligible expenditure for this purpose.
  • The application follows use documentation and may take up to 150 days when complete.
  • Do not use a future repayment to cover a cash shortfall during the works.

If you are preparing a construction project or renovation in Lisbon, ask Obra Lisboa for a clear scope of works and a quote that separates decisions, exclusions and required documentation before appointment.

Sources and further reading

Editorial image; it does not depict an Obra Lisboa project.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together