Earthquake Emergency Plan for a Lisbon Flat

Structural Work
·
Joinery
·
Decoration
·
Consultancy
·
3D Design
·
Interior Design
·
Construction
·
Full Renovations
·
Architecture
·
Engineering
·
Demolition
·
Painting and Finishes
·
Electrical and Plumbing
·
Wall and Floor Finishes
Emergency backpack and clear route in a Lisbon flat prepared for an earthquake.

A flat is better prepared for an earthquake when everyone can avoid falling objects, leave without obstructions and locate water, gas and electricity shut-offs without guessing. This is not structural strengthening work; it is domestic preparation completed before it is needed. In Lisbon, where seismic risk is part of municipal planning, it makes sense to turn the task into a short room-by-room check and repeat it whenever furniture, equipment or household needs change.

Contents

  1. Start with what could fall, open or block the way out
  2. Choose two indoor safe spots and one meeting point outside
  3. What should go in an emergency backpack?
  4. Learn the shut-offs without trying them for the first time in an emergency
  5. What to do during and immediately after shaking
  6. When preparation needs to become professional work

Start with what could fall, open or block the way out

During shaking, many injuries at home are caused by objects, glass, furniture and fittings coming loose. The IPMA advises securing or relocating furniture and objects that could fall, checking the stability of light fittings and keeping routes clear. Lisbon City Council also advises fitting safety catches to drawers and cupboard doors to reduce the chance of crockery, jars or tools spilling out.

  1. Move tall shelving, heavy mirrors and large pictures away from headboards, sofas and chairs where people regularly sit.
  2. Keep books, bottles, files and heavy boxes on lower shelves.
  3. Check that televisions, monitors and small appliances placed on narrow furniture have a stable base.
  4. Do not leave plant pots loose on window sills, balconies or on top of cupboards.
  5. Clear the route between bedrooms, living room, entrance and exit door; a basket, bench or shoe unit can become an obstacle.

Securing a bookcase does not mean drilling blindly. In older walls, timber-and-lath partitions, deteriorated masonry or plasterboard, the right fixing depends on the substrate and load. If there is uncertainty about the wall or how to secure tall furniture, treat it as technical work rather than a quick weekend job.

Choose two indoor safe spots and one meeting point outside

The household plan should be simple enough to remember in the dark and under stress. An earthquake is a sudden release of accumulated stress in the Earth’s crust, as the IPMA explanation of what an earthquake is sets out; that is why safe spots and routes need to be decided in advance. In each room, choose a place to take cover away from windows, mirrors, lamps and tall furniture: beneath a sturdy table or beside a clear internal wall can work. Municipal guidance is to remain protected indoors until shaking stops, rather than rushing to stairs or lifts.

Then agree on an outdoor meeting point that is away from façades, walls, large trees, poles and overhead cables. In an apartment building, make sure children, visitors and people with reduced mobility know the usual route and who takes medication, documents or the pet carrier.

  • Keep a short contact list on paper as well as on phones.
  • Choose a contact person outside your area to coordinate family news, as suggested in the IPMA guidance for preparing before an earthquake.
  • Do not assume that the garage, storage room or lift will be usable after shaking.
  • If you live close to the Tagus or Lisbon’s riverside, identify a route to higher ground in advance; after a strong earthquake, always follow official instructions.

Run a short practice: each person walks from their bedroom to the entrance without switching on lights and without moving obstacles. The aim is not alarm; it is to find the chest of drawers, rug or door that makes the route confusing.

What should go in an emergency backpack?

An accessible backpack avoids wasting time gathering supplies from different rooms. IPMA lists water, food that does not need refrigeration, a battery radio, torch, regular medication, copies of documents, hygiene items, warm clothing and sturdy footwear. Tailor it to the household: nappies, bottles, spare glasses, specialist food, a lead or pet food are essential when they are needed.

Avoid storing the bag in a high cupboard, an external store or behind boxes. A place close to the exit, while still outside the daily route, usually works best. Review food, batteries, medication and clothing sizes on set dates, such as when the clocks change.

A practical way to organise a household emergency backpack
GroupExamples to includeCheck
Basic suppliesWater, non-perishable food, tin openerDates and intact packaging
Communication and lightBattery radio, torch, spare batteries, whistleWorking or replaced batteries
Health and hygieneRegular medication, first aid kit, personal hygieneCurrent prescriptions and needs
Safe departureSpare keys, documents, clothing and sturdy footwearAccessible to all adults
Accessible domestic utility area with a water valve, electrical panel and torch for earthquake preparation.

Learn the shut-offs without trying them for the first time in an emergency

Find the electrical consumer unit, the main water valve and the gas isolation valve, where there is one. Label them discreetly and show everyone who lives in the home. IPMA advises households to know how to switch off electricity, water and gas; after an earthquake, its guidance is not to use flames or electrical switches until a gas leak has been ruled out.

Do not force stuck valves, dismantle the consumer unit or attempt to repair damaged services. The safe exercise is knowing where they are, making sure furniture does not block access and understanding the action required to close them. In a rented flat, also notify the landlord or building manager if a shared valve, service door or access to the electrical panel is obstructed.

To organise circuits and recognise signs of an electrical fault, see what to do when a circuit breaker keeps tripping. If you use bottled gas, review safe location, connection and checking in Gas Bottles in Flats.

What to do during and immediately after shaking

While the ground is moving, take cover and keep away from glass, mirrors, lamps and shelving. Do not run to the stairwell or try to use the lift. Once shaking stops, assess the space calmly: put on sturdy shoes if they are within reach, use a torch rather than a flame and expect aftershocks.

The IPMA advises against using matches, lighters or electrical switches if there may be a gas leak. If you smell gas, open windows only if it is safe to do so, move away and alert emergency services. Do not touch fallen cables and do not re-enter a damaged building on your own initiative.

Take particular care around new cracks, loose elements, chimneys, suspended ceilings and façades. A small crack cannot prove that a structure is safe. Assessing a home’s earthquake resistance is not a resident’s task: Lisbon City Council states that it requires technical knowledge. Record damage only where you can do so safely and follow instructions from the authorities.

When preparation needs to become professional work

Preparing the home reduces domestic risks, but it does not replace design, structural strengthening or a diagnosis of building defects. Call a qualified professional if cracks are widening, surfaces are deforming, damp is damaging walls, fixings are failing, balconies show exposed reinforcement, chimneys are unstable or you plan to alter walls and openings.

During a renovation, use the opportunity to plan furniture fixings, equipment anchors, safer cupboard doors and clear access to shut-offs. Do not hide valves or electrical boxes behind fixed furniture. If walls need to be opened, record the location of services before closing them again; the article on as-built drawings for a renovation explains how to keep this information useful for future work.

The next step can be very specific: spend ten minutes walking through the flat today, mark the three shut-offs, remove obstacles from the exit route and write down the household meeting point. If you are planning a Lisbon renovation, speak to Obra Lisboa about incorporating secure fixings, technical access and safe circulation into the actual scope of the work.

Key takeaways

  • Secure or reposition items that could fall onto beds, sofas and circulation routes.
  • Keep an accessible emergency backpack tailored to children, medication, pets and specific needs.
  • Every adult should know where water, gas and electricity can be shut off without dismantling or improvising.
  • After an earthquake, do not re-enter a damaged building unless authorities say it is safe.

Planning to renovate a flat? Ask Obra Lisboa to include secure fixings, access to the electrical panel and valves, and circulation that stays clear once the home is furnished.

Sources and further reading

Editorial image; it does not depict an Obra Lisboa project.

Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
Let's Work Together
·
ObraLisboa - Construção e Remodelação de propriedades
let's create
together