
When some radiators stay cold or only lukewarm, the cause is often in the circuit and room controls rather than an immediate need to replace the boiler. Before spending on new equipment, check for trapped air, low pressure, stuck valves, wrongly set lockshield valves or a pump that is not distributing heat properly. This order of checks prevents expensive guesswork and gives a heating technician clearer information about each room.
Contents
This guide concerns wet central-heating systems: a boiler, heat pump or other heat generator warms water that circulates to radiators or underfloor heating. ADENE’s tool for identifying efficient heating systems describes this arrangement for homes with centralised space heating.
If you use independent electric heaters, air conditioning or storage heaters, the diagnosis is different. With a wet system, compare rooms carefully: is the radiator cold all over, cold only at the top, warm at the top and cold below, or does it work only when other radiators are closed? Each pattern suggests a different check.
Start with the heating system off or with no demand for heat. Fully open the radiator’s thermostatic head, if fitted, and check that the return valve was not closed during earlier work. Check the boiler pressure gauge as well: the reference pressure depends on the appliance and installation, so follow the manufacturer’s manual rather than guessing a figure.
Then turn heating on and allow the circuit enough time to settle. Do not judge it after five minutes. Note which radiators warm first, which remain cold, and whether the issue changes when internal doors are open. In Lisbon apartments, a north-facing room or a room above a garage can lose heat faster; that alone does not prove that the radiator has failed.
If the home also has draughts, address them without blocking intended ventilation openings. Window weatherstripping can help where the problem is poor window sealing, but it does not replace necessary air renewal.
Bleeding releases air trapped at the high point of a radiator. Do it only when you understand the manufacturer’s method and can reach the bleed point safely. Protect the wall and floor with a cloth, use a small container and open the bleed screw only slightly with the proper key.
Do not keep bleeding the system repeatedly “to see whether it improves”. If air keeps returning, there is a cause to find: a leak, expansion-vessel issue, incorrect filling or poor previous work. Very dark water, unusual odour, visible corrosion or leakage call for technical assistance.

In an unbalanced circuit, water takes the easiest route through some radiators and reaches others with too little flow. The common result is an overheated room near the heat generator and cold bedrooms at the far end of the installation. Closing radiators at random may hide the problem and make comfort worse at other times of day.
Balancing is carried out at lockshield or return valves through a sequence of measurements and adjustments. It is work for a technician, especially in older systems, systems with radiators of different sizes, or after replacing a boiler with a heat pump. Portuguese rules treat the sizing, installation, adjustment and control of technical systems as parts of building energy performance; see Decree-Law No. 101-D/2020 for that framework.
Ask for an explanation of which radiators were adjusted and their final settings. That simple record helps prevent cleaning, decorating or moving furniture from undoing the work next winter.
A thermostatic radiator valve modulates radiator output according to the temperature around it. It can prevent overheating in bedrooms, corridors or sunny rooms, but it does not replace a balanced installation or solve a cold room caused by draughts, a thermal bridge or an undersized radiator.
Do not hide the thermostatic head behind heavy curtains, radiator covers or furniture pushed against it. It will read a pocket of warm air and may shut off too early. In rooms with floor-length curtains, plan the curtain and radiator together; a recessed curtain track should preserve maintenance access and should not form a permanent barrier to heat.
ADENE defines energy efficiency as reducing consumption without losing comfort and quality of life. That is the useful principle here: use room controls to fine-tune use, not to compensate for installation faults.
Call for service if there is a leak, repeated pressure loss, loud pump noise, radiators that remain cold after bleeding, very dirty circuit water, a gas smell, an abnormal flame or any concern about a gas boiler. Do not remove valves, drain the circuit or interfere with combustion in an attempt to get more heat.
When booking, state the heat generator type, approximate age of the system, how many radiators fail and the pattern you observed. Ask for checks to pressure, bleeding, valves, pump, filter, water condition and hydraulic balancing; if replacement is proposed, ask which of those issues have already been ruled out. For wider renovation decisions, ADENE’s guidance on energy efficiency in buildings is useful for connecting the system, the building fabric and comfort.
If you are renovating, ask Obra Lisboa to plan access to valves, maintenance space and the right sequence between windows, insulation, emitters and controls. It avoids adding new capacity to compensate for issues the renovation could solve directly.
Key takeaways
Renovating a home with wet central heating? Speak with Obra Lisboa before walls are closed or equipment is ordered, so pipework, controls, access and finishes are coordinated with the rest of the project.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.