If shower silicone is blackened, cracked or loose, the lasting repair is to remove the old seal, make sure the area is dry and apply new sanitary silicone; covering it with another bead usually traps moisture and delays the real repair. Before starting, inspect the wall behind the shower, the outside edge of the tray and the ceiling below, if there is one. Stains, bubbling paint or joints that never dry change the job: there may be a leak or waterproofing failure that silicone alone cannot solve.
Contents
Surface mould often develops along the line exposed to air and water, especially in enclosure corners, near the door and where the tray meets the wall finish. Excess indoor moisture encourages condensation and fungal growth; Portugal’s Directorate-General for Health explains the link between indoor humidity, cold surfaces and mould. Even so, a darkened joint does not automatically mean there is a leak behind it.
Carry out a simple inspection before buying supplies. With the shower dry, press the joint gently: silicone that is flexible and firmly bonded may only need cleaning; silicone that has detached, hardened, split or developed continuous gaps should be replaced. Look beyond the wet area too. Water appearing outside the tray after a shower, a persistent damp smell, loose tiles or an expanding stain are all reasons to stop treating this as a cosmetic job and find the source first.
| Sign | First decision | Boundary |
|---|---|---|
| Black spots only on the surface, with firm silicone | Clean and dry; monitor it | Replace if it returns quickly or the joint has become porous |
| Cracked, loose or missing silicone | Remove all of it and reseal | Do not apply a fresh layer over the old one |
| Stain outside the shower, moving tray or water on the other side of the wall | Stop and investigate the leak, tray or waterproofing | A new seal may conceal the issue temporarily |
Allow time for drying: a new joint applied to a damp substrate will not bond properly. Avoid using that enclosure on the previous day where possible, and remove bottles, mats and accessories. Open a window or make sure mechanical extraction is working. The DGS recommends ventilation during and after bathing and clean, functioning ventilation systems; that routine reduces the moisture load that attacks seals again.
Gather a silicone scraper or suitable blade, gloves, lint-free cloths, masking tape, a compatible remover if needed, isopropyl alcohol or the manufacturer’s recommended final-cleaning product, sanitary silicone and a caulking gun. Do not mix bleach, vinegar, ammonia or other cleaners: follow the label and instructions for the product you use. Take extra care if mould is extensive, if someone in the household has respiratory problems or if porous materials are affected.
For the wider moisture-control approach, read the DGS guidance on home ventilation and humidity. Preparation is also the right time to check whether the shower wall has a suitable backing system; during a larger project, see our guide to cement board or moisture-resistant gypsum board in a shower.
Take out the entire old silicone bead. Removing only the visibly dark section leaves contaminated edges and weak bonding points where water can enter. Work slowly, particularly around acrylic trays, natural stone, coated profiles or sensitive tile finishes.
Do not use a power tool, flame or aggressive abrasive to save time. A few minutes gained are not worth scratching the tray or damaging tile glaze. If water has collected beneath the tray, do not try to seal its way out: the cause needs to be found.

Choose sanitary silicone intended for wet areas and compatible with the materials being joined. Check the label for ceramic, acrylic, glass, aluminium or stone compatibility; products do not all behave the same way on every substrate. Cut the cartridge nozzle to an opening slightly smaller than the joint you want. It is easier to add product than to remove excess.
A bead that is too thin can tear; one that is too wide collects dirt and becomes hard to clean. At wall-to-tray junctions, aim for a continuous, slightly concave line without patches. If the enclosure has profiles, check the manufacturer’s instructions: some profiles should be sealed only on specific faces so their internal drainage is not blocked.
Once cured, silicone still needs a routine. Squeegee water from the glass and tray after showering, leave the door or screen open to dry and run the extractor during the shower and for a while afterwards. The DGS identifies bathrooms as a major moisture source and advises addressing humidity problems early. Its guidance on damp and mould also recommends solving the cause first, cleaning and allowing the area to dry before painting or covering it.
Clean the joint regularly with a mild product that is compatible with silicone, and avoid abrasive pads. Check enclosure hinges and seals too: a misaligned door can throw water repeatedly beyond the intended wet zone. If ventilation is inadequate, a clean seal quickly stops being the main issue. A dehumidifier may help reduce moisture peaks, but it does not replace extraction, ventilation or repair of an active leak.
If the renovation has left product odours or the bathroom stays damp for hours, review whole-home ventilation as well with our guide to ventilating after renovation without creating damp.
Replacing silicone is a reasonable household task when the tray is stable, finishes are intact and there are no signs of water outside the shower zone. Stop if you find cracks in the tray, loose tiles, a soft wall, bubbling paint on the other side, water emerging from beneath the enclosure or a stain on a neighbour’s ceiling. In those cases, renewing the joint may improve the appearance, but it does not prove that the installation is watertight.
It is also sensible to bring in help when the enclosure must be dismantled, drainage is slow or the renovation will alter the shower wall. Photograph the area before opening or removing components; where there has already been significant water ingress, follow a drying and recording sequence before closing surfaces, as explained in our guide to drying and repairing a home after water damage.
ADENE defines indoor air quality as a set of factors including pollutants, ventilation, temperature and humidity. Its indoor-air-quality glossary puts this small repair in the right context: a new joint lasts longer in a bathroom that can dry properly every day.
Key takeaways
If the failed seal is linked to movement, water ingress or an incomplete shower-area renovation, ask Obra Lisboa to assess the repair scope before the area is closed up again.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.